BEWONERSPARTICIPATIE - 2e avond
New Design for the
REMBRANDTPARKAmsterdam
Yves Martens
Buiting Bosontwikkeling
In cooperation with
BEWONERSPARTICIPATIE - 2e avond
BACKGROUND
New design Rembrandtpark
Construction of a new roadWet ecological corridorRe-design of the park
BEWONERSPARTICIPATIE - 2e avond
LOCATION REMBRANDTPARK
BEWONERSPARTICIPATIE - 2e avond
IMPRESSION WITH PICTURES
BEWONERSPARTICIPATIE - 2e avond
BACKGROUND
Three themes:1. Trees
2. Routing and safety3. Design and use
2nd evening in september: theme TreesTwo other themes to be discussed in
November during 3rd evening
BEWONERSPARTICIPATIE - 2e avond
WORKSHOP
1. Presentation 2nd evening2. Two other themes used to discuss
for this workshop
Main questions:1. How can GIS be used in preperation
for the 3rd meeting?
BEWONERSPARTICIPATIE - 2e avond
AGENDA 2nd evening
TREE SURVEY
FRAMEWORK DESIGN
MODEL STUDY
DISCUSSION
BEWONERSPARTICIPATIE - 2e avond
TREE SURVEY
NUMBER 246 bomen
PURPOSE monitor present qualities
MEASURMENTS AND CHARACTERISTCS
tree speciesdiameter breast heighttree heightvitalitycrown projection and
shapedamage and/or faults
BEWONERSPARTICIPATIE - 2e avond
TREE SPECIES
BEWONERSPARTICIPATIE - 2e avond
VITALITY
BEWONERSPARTICIPATIE - 2e avond
CROWN PROJECTION
BEWONERSPARTICIPATIE - 2e avond
SHAPE OF THE CROWN / DIRECTION
SHAPE OF TREE WITH LIVING CROWN < 2 METER
SHAPE OF TREE WITH LIVING CROWN 2 TO 4 METER
OTHER TREES
BEWONERSPARTICIPATIE - 2e avond
DAMAGE AND/OR FAULTS
NO DAMAGE
MECHANICAL DAMAGE
BEWONERSPARTICIPATIE - 2e avond
FRAMEWORK DESIGN
ECOLOGICAL CORRIDOR
CLOSED AND GREEN BORDER
STARTING POINT WATERWAY
SAFETY
SPONTANEOUS PROCESSES
BEAUTIFUL TREES
BEWONERSPARTICIPATIE - 2e avond
ECOLOGICAL CORRIDORconnection between “Schipluidensingel” and the Rembrandtpark
BEWONERSPARTICIPATIE - 2e avond
CLOSED BORDERgreen screen between park en Lelylaan (=road)
BEWONERSPARTICIPATIE - 2e avond
STARTING POINT WATERWAYconnection on “Schipluidensingel” is fixed
BEWONERSPARTICIPATIE - 2e avond
SAFETYgentle slope (minimum 1:3)
BEWONERSPARTICIPATIE - 2e avond
BEAUTIFUL TREES & SPONTANEOUS PROCESSES remain as many beautiful trees as possible
BEWONERSPARTICIPATIE - 2e avond
BEWONERSPARTICIPATIE - 2e avond
MODEL STUDY4 alternatives
CONNECTION CULVERT
QUAY or DAM-WALL
GENTLE SLOPE, 1:3
DUBBLE SLOPE WITH TERRACES
BEWONERSPARTICIPATIE - 2e avond
Alternative 1: CONNECTION CULVERT Alternative 1: CONNECTION CULVERT
BEWONERSPARTICIPATIE - 2e avond
CONNECTION CULVERT CONNECTION CULVERT does not suffice to the ecological corridordoes not suffice to the ecological corridor
BEWONERSPARTICIPATIE - 2e avond
Alternative 2: QUAY OR DAM-WALLAlternative 2: QUAY OR DAM-WALL
BEWONERSPARTICIPATIE - 2e avond
BEWONERSPARTICIPATIE - 2e avond
BEWONERSPARTICIPATIE - 2e avond
QUAY OR DAM-WALLQUAY OR DAM-WALL
BEWONERSPARTICIPATIE - 2e avond
QUAY OR DAM-WALL QUAY OR DAM-WALL
BEWONERSPARTICIPATIE - 2e avond
QUAY OR DAM-WALL QUAY OR DAM-WALL Only suffice to the demands for ecology Only suffice to the demands for ecology and safety when using a very special and and safety when using a very special and expensive construction.expensive construction.
BEWONERSPARTICIPATIE - 2e avond
Alternative 3: SLOPE 1 : 3 Alternative 3: SLOPE 1 : 3
BEWONERSPARTICIPATIE - 2e avond
BEWONERSPARTICIPATIE - 2e avond
GENTLE SLOPE 1 : 3GENTLE SLOPE 1 : 3
BEWONERSPARTICIPATIE - 2e avond
GENTLE SLOPE 1 : 3GENTLE SLOPE 1 : 3Better alternative from ecological point of Better alternative from ecological point of view, but it gives little possibilities for view, but it gives little possibilities for further design of the park.further design of the park.
BEWONERSPARTICIPATIE - 2e avond
Alternative 4: DUBBLE SLOPE 1 : 3 WITH Alternative 4: DUBBLE SLOPE 1 : 3 WITH TERRACESTERRACES
BEWONERSPARTICIPATIE - 2e avond
BEWONERSPARTICIPATIE - 2e avond
DUBBLE SLOPE 1 : 3 WITH TERRACESDUBBLE SLOPE 1 : 3 WITH TERRACES
BEWONERSPARTICIPATIE - 2e avond
DUBBLE SLOPE 1 : 3 WITH TERRACESDUBBLE SLOPE 1 : 3 WITH TERRACESwide slope with groups of trees on the wide slope with groups of trees on the slopes and terracesslopes and terraces
BEWONERSPARTICIPATIE - 2e avond
DISCUSSION
BEWONERSPARTICIPATIE - 2e avondIn cooperation with
BEWONERSPARTICIPATIE - 2e avond
Workshop
What we learned:1. Among some people trust is lost, which
causes problems2. Certain information on maps can trigger
emotion and anger3. There is a difference between public
participation and public decision4. Visualization techniques are unlimited but
information on the map should be accurate and complete
5. Well defined plan eases the acceptance
BEWONERSPARTICIPATIE - 2e avond
Task for the workshop
We are going to prepare 2 themes for the 3rd evening!
Theme routing and safety Theme further design and use
BEWONERSPARTICIPATIE - 2e avond
Theme routing and safety
What is the best routing?(Cyclist vs joggers)
How can we make a safe design?(Streetlights vs dark spots)
BEWONERSPARTICIPATIE - 2e avond
Theme further design and use
1. Interaction between park and surroundings?
(how is the park experienced from the inside)
2. Zoning?(division recreational areas vs nature)
BEWONERSPARTICIPATIE - 2e avond
TASK
Every group gives (3) recommendations on how to use GIS in this project.
Material: paperpen
maps of the park
BEWONERSPARTICIPATIE - 2e avond
REMEMBER
Trust among citizens is slowly regained
Technically everything is possible, but (financial) resources are limited
BEWONERSPARTICIPATIE - 2e avond
Results of the workshop
Your ideas will be integrated in the CoPack!
Your ideas will be used in preparation of the 3rd public
meeting in November in Amsterdam!