Best solutions ensure enthusiasm
www.bernard-ing.com
BERNARD Ingenieure
Overview
1. BERNARD Ingenieure
2. Recent Tunnelling Projects
BERNARD Group
• International • Technically specialized companies • Total of 400 employees The BERNARD Group stands for interdisciplinary engineering services; it provides comprehensive technical and economic consulting services, as well as complete planning and design, oversight of project development and implementation, time scheduling and site supervision.
BERNARD Group
Fields of Activity
Electro TechnologyMaterialsProduction
Industry
Energy
Infrastructure
Transportation
HydropowerPipelinesDistribution Networks
Building ConstructionEnvironmentHydraulic Engineering
Roads and RailroadsBridgesTunnels
Comparative Studies, Environmental Impact Planning,Tender Design, Detailed Design, Design Coordination,Safety Design
Designing
Feasibility Studies, Environmental Impact Studies,Remedial Concepts, Cost-Benefit Analyses,Tender Invitations, Complete Design
Consulting
Controlling
Expert Opinions, Design Verification, Site Supervision, Monitoring,Occupational Safety and Health Management, Measurement Technology
Supervising
Project Development, Project Management,Information Management, Time Scheduling,Financing Concepts, Construction Work Coordination
Our Engineering Services
Scope of services
• Feasibility studies; Preparation of tender documents; Detailed planning
• Cost estimates and risk analyses
• Project management
• Site supervision and contract administration
• Consulting during construction
• Claim and anti-claim management
Department of Geotechnical and Tunnel Engineering
Department of Geotechnical and Tunnel Engineering
RAILWAYS AND TUNNELS
CLIENT ASFiNAG (Austrian Motorway Authority)
BRIEF DESCRIPTION• Existing Pfänder Tunnel constructed 1974 and 1980 to bypass Bregenz. • Key component of A14 Rhine Valley Highway and European road network • 2nd Tube required due to increasing traffic and stricter safety standards.• 6.6 km new 2nd tube excavated by TBM 12.5 m.• Geology: Molasse: conglomerates, sandstone, shale, claystone•Double-shell lining with a backfilled, non-watertight segmental lining waterproofing membrane between segments and cast-in-place lining• 15 cross-passages between the tunnel tubes, 7 lay-bys• Rehabilitation of existing tube
BERNARD SERVICESSite supervision and construction management
TOTAL PROJECT COSTS € 218 Mio. (of which € 192 Mio. are for the construction of the new second tube)
PERIOD May 2006 – July 2013 - TBM heading completed November 2009- Completion of new second tube expected June 2012
PFÄNDER TUNNEL – 2.TUBE Vorarlberg, Austria
Recent Tunneling Supervision Projects
• Construction of a 7 km long Access-. Dewatering-, and Exploratory Tunnel“, 30 m² Cross section , excavation and support according to the principles of NATM
• Construction of a 3.5 km long, declined Access Tunnel, 85 m² Cross section , excavation and support according to the principles of NATM
BRENNER BASE TUNNELSITE SUPERVISION AT ACCESS AND EXPLORATORY TUNNELS
Recent Tunneling Supervision Projects
CLIENT ÖBB – (Austrian Federal Railways) Infrastructure Construction AG, Graz BRIEF DESCRIPTIONConstruction of railway tunnel with two single-track tubes; 33 km long, cross-passages every 500 mOUR SERVICESPlanning of all project phases in conjunction with partner firmsContract Management TOTAL PROJECT COSTS € 4,000 Mio.PERIOD 2006 – ongoing (until 2016)
Recent Tunnel Design and Contract Management Project
KORALMBAHN RAILWAY PROJECTGraz - KlagenfurtKoralm Base Tunnel - Styria, Austria
CLIENT ÖBB – (Austrian Federal Railways) Infrastructure Construction AG, Graz BRIEF DESCRIPTIONConstruction of railway tunnel with two single-track tubes; 33 km long, cross-passages every 500 mOUR SERVICESPlanning of all project phases in conjunction with partner firmsContract Management TOTAL PROJECT COSTS € 4,000 Mio.PERIOD 2006 – ongoing (until 2016)
Recent Tunnel Design and Contract Management Project
KORALMBAHN RAILWAY PROJECTGraz - KlagenfurtKoralm Base Tunnel - Styria, Austria
CLIENT ASFiNAG (Austrian Motorway Authority)
BRIEF DESCRIPTION2-lane highway tunnel, length 5,069 m, excavation cross-sections 80-105 m²,23 cross-passages to existing tube; Total project length, incl. East/West portal areas, of 5,900 m
OUR SERVICESPreliminary design; Environmental Impact Assessment; Preparation of documents for approval by authorities; Cost analyses; Risk assessment; Tender design; Preparation of tender documents; Preparation of technical specifications; Design for construction; Consultancy during construction
TOTAL PROJECT COSTS € 115 Mio. (including rehabilitation of the 1st tube)
PERIOD 2002 - ongoing
A12 INN VALLEY MOTORWAY ROPPEN TUNNEL, 2ND TUBETyrol, Austria
Recent Tunnel Design Projects
CLIENT ASFiNAG (Austrian Motorway Authority)
BRIEF DESCRIPTION2-lane highway tunnel, length 5,069 m, rehabilitation measures for the existing tube, 23 cross-passages to existing tube; Total project length, incl. East/West portal areas, of 5,900 m
OUR SERVICESPreliminary design; Cost analyses; Risk assessment; Tender design; Preparation of tender documents; Preparation of technical specifications; Design for construction; Consultancy during construction
TOTAL PROJECT COSTS € 115 Mio. (including construction of the 2nd tube)
PERIOD 2002 - ongoing
A12 INN VALLEY MOTORWAY ROPPEN TUNNEL, 1ST TUBE (REHABILITATION WORKS)Tyrol, Austria
Recent Tunnel Rehabilitation Projects
CLIENT ASFiNAG (Austrian Motorway Authority)
BRIEF DESCRIPTIONRehabilitation of the Niklasdorf and Massenberg Tunnels to state-of-the-art standard, in terms of safety and structural integrity.Niklasdorf Tunnel: Twin-tube, 1,332 m long (782 m open-cut); creeping slope rehabilitation conceptsMassenberg Tunnel: Twin-tube, 460 m long; rehabilitation of the inner-lining (constructed in 1964) with a slender sprayed concrete lining
OUR SERVICESGeotechnical measurements and interpretation; Expert opinion; Cost analyses; Tender design; Preparation of tender documents; Preparation of technical specifications; Design for construction; Site supervision (during emergency repairs)
TOTAL PROJECT COSTS € 0.5 Mio.
PERIOD 2008 - ongoing
S6 SEMMERING HIGHWAYREHABILITATION OF NIKLASDORF AND MASSENBERG TUNNELSStyria, Austria
Recent Tunnel Rehabilitation Projects
NORTH APPROACH TO BRENNER – BASE -TUNNEL
AT LOWER – INN – VALLEY
EXPLORATORY ADITS
• Fiecht: • Heading in loose ground 30 m2; length 400 m • Heading in rock 30 m2; length 700 m• Pump cavern 100 m3
• Vomp:• Exploratory tunnel; cross-sectional area 30 m2
• Length 4,700 m of which 1,600 m were in loose ground• Brixlegg East:
• Exploratory tunnel; cross-sectional area 30 m2
• Length 2,270 m• Trial excavation of main tunnel profile 125 m2
• Length 60 m• Brixlegg West:
• Exploratory tunnel; cross-sectional area 50 m2
• Length 250 m• Entrance cavern of main tunnel profile 125 m2
• Length 60 m
Recently Completed Tunneling Supervision Projects
NORTH APPROACH TO BRENNER – BASE -TUNNEL
AT LOWER – INN - VALLEY• Lot H6 Terfens Gallery:
• Length 1,330 m • Relocation of existing railway line • Landscaping and viaduct for wildlife• Construction Period: 2003 – 2006
• Lot H5 Vomp - Terfens:Tunnel: • Length 8,480 m, 5,030 m in loose ground• Excavation sections up to 203 m²• Construction Period: 2003 – 2009
• Lot H3-4 Münster - Wiesing Tunnel:• TBM with slurry shield, diameter 13.5 m• Length 5,818 m • River Inn Crossing, 11 escape shafts• Construction Period: 2006 – 2009
• Lot H8 Jenbach - Stans Tunnel:• TBM with slurry shield, diameter 13.5 m• Length 5,182 m• Undercrossing of the Jenbach• Construction Period: 2006 – 2010
Recent Tunneling Supervision Projects
NORTH APPROACH TO BRENNER – BASE -TUNNEL
AT LOWER – INN - VALLEY• Lot H6 Terfens Gallery:
• Length 1,330 m • Relocation of existing railway line • Landscaping and viaduct for wildlife• Construction Period: 2003 – 2006
• Lot H5 Vomp - Terfens:Tunnel: • Length 8,480 m, 5,030 m in loose ground• Excavation sections up to 203 m²• Construction Period: 2003 – 2009
• Lot H3-4 Münster - Wiesing Tunnel:• TBM with slurry shield, diameter 13.5 m• Length 5,818 m • River Inn Crossing, 11 escape shafts• Construction Period: 2006 – 2009
• Lot H8 Jenbach - Stans Tunnel:• TBM with slurry shield, diameter 13.5 m• Length 5,182 m• Undercrossing of the Jenbach• Construction Period: 2006 – 2010
Recent Tunneling Supervision Projects
NORTH APPROACH TO BRENNER – BASE -TUNNEL
AT LOWER – INN - VALLEY• Lot H6 Terfens Gallery:
• Length 1,330 m • Relocation of existing railway line • Landscaping and viaduct for wildlife• Construction Period: 2003 – 2006
• Lot H5 Vomp - Terfens:Tunnel: • Length 8,480 m, 5,030 m in loose ground• Excavation sections up to 203 m²• Construction Period: 2003 – 2009
• Lot H3-4 Münster - Wiesing Tunnel:• TBM with slurry shield, diameter 13.5 m• Length 5,818 m • River Inn Crossing, 11 escape shafts• Construction Period: 2006 – 2009
• Lot H8 Jenbach - Stans Tunnel:• TBM with slurry shield, diameter 13.5 m• Length 5,182 m• Undercrossing of the Jenbach• Construction Period: 2006 – 2010
Recent Tunneling Supervision Projects
Lot H8 – Tyrol
copyright: BEGcopyright: BEG
RAILWAY AXIS BRENNER MUNICH – VERONA
CLIENT Verbund-Austrian Hydro Power AG Wien
BRIEF DESCRIPTIONDiversion power plant with daily-storage reservoir, maximum capacity 63 MW, head 85 m; Increase of diversion flow from 60 to 120 m³/s, 3 Francis spiral turbines Headrace channel + headrace tunnel 6.1 km, channel and open channel surge tank 530 m
OUR SERVICESPreparation of documents for approval by authorities; Preparation of tender documents; Design for construction
TOTAL PROJECT COSTS € 55 Mio.
PERIOD May 2006 – September 2009
HIEFLAU HYDROPOWER PROJECT Styria, Austria
Tunnel Design Projects
GKI – INN HYDRO ELECTRIC POWER PLANTAustria/ Switzerland
BRIEF DESCRIPTION• Medium-head hydropower plant• Capacity 88 MW• Head 150 m• Design flow 75 m³/s• 2 Francis turbines• 22 km headrace tunnel• Surge shaft• Declined steel lined pressure shaft
CLIENTGKI (Verbund - Austrian Hydro Power AG TIWAG-Tiroler Wasserkraftwerke AGEngadiner Kraftwerke AG)
Recent Design Projects
REISSECK II PUMPED STORAGE PLANTCarinthia, Austria
BRIEF DESCRIPTION• Pumped storage plant• Head 595 m• Design flow 80 m³/s• Capacity 430 MW• Existing upper and lower reservoirs
CLIENTVerbund-Austrian Hydro Power AG
Department of Water & Energy
CLIENT DHPC / Ministry of Trade and Industry, Thimphu, Royal Government of Bhutan
BRIEF DESCRIPTION
High-head hydropower plant; 2x 5-jet Pelton-turbines; head 304 m; design flow 50 m³/s; capacity 114 MW; 7.8 km headrace tunnel; surge tank; 300 m steel lined pressure shaft; bifurcator; separate powerhouse and transformer caverns; access tunnels; tailrace tunnel; outlet structure, all designed using NATM
OUR SERVICESFeasibility studies; On-site geological assessment; Preliminary design; Environmental Impact Assessment; Tender design; Preparation of tender documents; Preparation of technical specifications
TOTAL PROJECT COSTS € 152 Mio.
PERIOD 2005 – ongoing
DAGACHHU HYDROPOWER PROJECT Kingdom of Bhutan
Department of Water & Energy
CLIENT DHPC / Ministry of Trade and Industry, Thimphu, Royal Government of Bhutan
BRIEF DESCRIPTION
High-head hydropower plant; 2x 5-jet Pelton-turbines; head 304 m; design flow 50 m³/s; capacity 114 MW; 7.8 km headrace tunnel; surge tank; 300 m steel lined pressure shaft; bifurcator; separate powerhouse and transformer caverns; access tunnels; tailrace tunnel; outlet structure, all designed using NATM
OUR SERVICESFeasibility studies; On-site geological assessment; Preliminary design; Environmental Impact Assessment; Tender design; Preparation of tender documents; Preparation of technical specifications
TOTAL PROJECT COSTS € 152 Mio.
PERIOD 2005 – ongoing
DAGACHHU HYDROPOWER PROJECT Kingdom of Bhutan
Consulting during Construction
Thank you for your attention