Best practise wastewater treatment plant Aachen-Soers
Transcript of Best practise wastewater treatment plant Aachen-Soers
© 2021 Aerzener Maschinenfabrik GmbH
Best practise wastewater treatment plant Aachen-Soers
Markus Leidinger, Nadine Klees
© 2021 Aerzener Maschinenfabrik GmbH
Markus Leidinger
Aerzener Maschinenfabrik GmbH
Application Management
Wastewater Treatment Plants
Europe, Middle East and Africa
© 2021 Aerzener Maschinenfabrik GmbH
General Information
Founding year: 1864
Employees
(head office): approx. 1100
Subsidiaries: 52
Employees
(subsidiaries): approx. 1000
Turnover: 350 Mio. €
Number of units: 20.000/year
© 2021 Aerzener Maschinenfabrik GmbH
Development Department
Sales Department
Construction Department
General Information
Aerzen Headquarter
© 2021 Aerzener Maschinenfabrik GmbH
100 % Quality Control
All relevant spare parts on stock
Production of Screw Compressors,
Blowers and Turbos
More than 60 test benches
General Information
Aerzen Assembly hall
© 2021 Aerzener Maschinenfabrik GmbH
General Information
325 9
9
61
SOUTH AMERICA
Argentina
Brazil
Chile
Columbia
Peru
Venezuela
NORTH AMERICA
Canada
Mexico
USA
EUROPE
Belgium
Bulgaria
Danmark
Finland
France
Germany
Greece
Great Britain
Italy
Croatia
Lithuania
Netherlands
Norway
Austria
Poland
Portugal
Romania
Russia
Sweden
Switzerland
Slovakian
Spain
Czech R.
Russia
Hungary
Cyprus
AFRICA/ NEAR EAST
Egypt
Iran
Israel
Syria
Nigeria
Rep. of South Africa
Saudi Arabia
Turkey
United Arab Emirates
ASIA
China
India
Japan
Korea
Pakistan
Philipines
Singapore
Taiwan
Thailand
AUSTRALIA
Australia
Aerzen subsidiary Egypt in Cairo
with Sales department,
maintenance, service, spare
parts and commissioning
52 subsidiaries worldwide
© 2021 Aerzener Maschinenfabrik GmbH8
Project overview
▪ Municipal wastewater treatment plant
▪ 460,000 population equivalents (incl. industrial
waste water)
▪ 10 x HV Turbos with vane control (355 kW)
▪ High maintenance cost for Turbos
▪ Replacement with 17 Delta Hybrid (10 x D 52 S, 7 x D 36 S)
Mode of operation:
▪ 2 aeration basins with 7 streets/basin
▪ Water depth: 6 m
▪ Oxygenation: approx. 5000 h/year
▪ Pressure difference of blowers: 630 mbar
WWTP Aachen-Soers
© 2021 Aerzener Maschinenfabrik GmbH
WWTP Aachen-Soers
Aerial view
4 Power- and control cabinets for one Turbo Blower
11 Turbos with vane control
Old and too big maschines
High maintenance cost
and poor energy efficiency
44 power- and control
cabinets
© 2021 Aerzener Maschinenfabrik GmbH10
WWTP Aachen-Soers
New intallation of 17 Aerzen Delta Hybrid
Benefits of customer:
• Best performance data via the complete flow range
• No absorption material and therefore no crustification
in the membran plate aeration system
• 100 % oilfree
• Outdoor installation under carport with semidetached power control cabinet
for each machine
• Reducing power- and control cabinet from 44 to 17
• Electrical heat system for power- and control cabinet is in included
• Installation direct at the aeration basin (less pressure loss in pipe system)
• Minimization of the pipe system reduces installation costs
• Webserver and Profibus connectivity
Cost reduction in CAPEX > 1 Mill. €
© 2021 Aerzener Maschinenfabrik GmbH
WWTP Aachen-Soers
Energy saving costs
Energy saving costs
of
770.000 €/year
© 2021 Aerzener Maschinenfabrik GmbH
2.746 t CO2/yearCorresponding with average emmission/year of
1150 cars
Reduction of CO2 emmision:
WWTP Aachen-Soers
© 2021 Aerzener Maschinenfabrik GmbH13
References
System competence in over 100.000 Wastewater Treatment Plants worlwide
> 250 machines in Egypt