Best Practices in Managing WisDOT’s Mega & ARRA Projects
Breakout Session B, Track 4
Part 1
Gary Whited, CMSC
ACEC/WisDOT Transportation Improvement Conference
Best Practices on Megaprojects and ARRA Projects
By:Construction and Materials Support Center
UW-Madison
A WisDOT Policy Research Project
Presentation Overview
• Part 1– Research Project Background– Update on project progress– Obtain your input on select BPs
• Part 2– Overview of ARRA Program– Procedures used in managing ARRA– Results and accomplishments
Research Project Background
• Since 2004, WisDOT implemented new techniques, methods, processes, and procedures for management:
– Megaprojects– American Recovery and Reinvestment Act (ARRA)
projects
Research Project Background
• Research Idea:– Identify best practices, procedures, standards,
and programs
– Evaluate effectiveness
– Determine benefits for future use
– Recommend those that should be adopted
– Suggest adoption strategies
Problem Statement
• Considerable benefit from comprehensive evaluation of management processes
• Evaluate best practices and lessons learned:– Determine effectiveness– Sufficient benefit to be widely implemented
CMSC Project Scope
• WisDOT Research & Communication Services Section solicited ideas for topic areas
• Focus of initial research efforts:1) Project Management with Benchmarking and
Metrics2) Project Change Control3) Document Control and Reporting4) Financial Reporting
Research Methods• Focus
– Marquette Interchange– I-94 North-South Corridor– USH 41 Expansion– ARRA Projects
– PCEE Program– Other National and International Transportation
projects and sources
Task 1: Data Collection• Literature review - Inventory existing WisDOT efforts - Review existing documents
and databases - Interview experienced personnel
Task 2: Indentify Best Practices• Confirm usefulness - Evaluate level of benefit - Evaluate Program vs. Project
specific
Determine benchmarks
Task 3: Summarize Best Practices• Essential elements and tools - Conditions for successful application - Benefits and
cost implications – Examples
Task 4: Implementation Strategies• Indentify barriers - Recommend methods and tools for overcoming - Suggest
needed education and training
Task 4Task 3Task 2Task 1
Study Timeline
Mar. 2010
Jun. 2011
Sept. 2010
Dec. 2011
Mar. 2011
Best Practice Inventory
• Best Practices listed by source
• Categorized by the study emphasis areas
• Objectives identified and classified as primary and secondary
• Consolidated to list of 46 which were reviewed with experienced practitioners
• Continuing to gather input regarding application of the Best Practices
Best Practice Breakdown
• Project Management (31)• Change Management (7)• Document Control (6)• Financial Reporting (2)
Breakout Session Input
• Experience and knowledge level of the Best Practice
• Overall impression of the Best Practice
• Thoughts on WisDOT adopting the Best Practice
How familiar are you with the movieSmokey and the Bandit?
A. Not at all
B. Slightly
C. Somewhat
D. Very
E. Don’t know & Don’t Care
1970’s Movie
• Starred Burt Reynolds• Several sequels & TV shows• Car chases and silliness
Line from the theme song:
• “We’ve got a long way to go and a short time to get there.”
Best Practice: PM-2
Utilize a Request For Information (RFI)Form and Process
Used by contractors to obtain clarification of the plans, specifications, special provisions, or other contract documents
Provides a means to document and monitor questions and answers provided during construction.
PM-2 How would you describe your experience with this BP?
A. NegativeB. Somewhat negativeC. Neither negative or positiveD. Somewhat positiveE. Positive
PM-2
How important do you think it is that WisDOT implement this BP?
A. Not at allB. SlightlyC. SomewhatD. VeryE. Extremely
Not at all Slightly Somewhat Very Extremely0
2
4
6
8
10
12
7
11
3
How important is it to implement PM-2?
Best Practice: PM-11
Prepare cost-to-complete budgetprojections
Project delivery team is required to prepare and submit monthly cost-to-complete projections
Includes cost of work performed, budgeted work scheduled, contract mods, quantity over/underruns and anticipated contract mods,
etc.
PM-11 How would you describe your experience with this BP?
A. NegativeB. Somewhat negativeC. Neither negative or positiveD. Somewhat positiveE. Positive
PM-11
How important do you think it is that WisDOT implement this BP?
A. Not at allB. SlightlyC. SomewhatD. VeryE. Extremely
Not at all Slightly Somewhat Very Extremely0
2
4
6
8
10
12
4
11
6
How important is it to implement PM-11?
Best Practice: PM-6
Require use of Three-Week, Look- Aheadschedules
Contractor must submit weekly a three-week look-ahead schedule that includes:
activities underway as-built dates for past week planned work for upcoming two-weeks potential impacts to traffic, etc.
PM-6 How would you describe your experience with this BP?
A. NegativeB. Somewhat negativeC. Neither negative or positiveD. Somewhat positiveE. Positive
PM-6
How important do you think it is that WisDOT implement this BP?
A. Not at allB. SlightlyC. SomewhatD. VeryE. Extremely
Not at all Slightly Somewhat Very Extremely0
2
4
6
8
10
12
1
7
11
How important is it to implement PM-6?
Best Practice: PM-3
Utilize Design Liaison (Transparency)contracts
WisDOT contracts with design firm to compensate them for their consulting efforts regarding plan questions during construction.
Provides ready access to designer for assistance in answering questions on plan clarifications or design changes
PM-3 How would you describe your experience with this BP?
A. NegativeB. Somewhat negativeC. Neither negative or positiveD. Somewhat positiveE. Positive
PM-3
How important do you think it is that WisDOT implement this BP?
A. Not at allB. SlightlyC. SomewhatD. VeryE. Extremely
Not at all Slightly Somewhat Very Extremely0
1
2
3
4
5
6
7
8
1
5
7
2 2
How important is it to implement PM-3?
Best Practice: FR-1
Implement monthly project financialreporting system Project delivery team is required to prepare and submit monthly cost data including:
1. actual expenditures vs. budget2. percent of current budget expended3. percent of time expended4. anticipated cost-to-complete5. value of pending contract mods6. reserve balances
FR-1 How would you describe your experience with this BP?
A. NegativeB. Somewhat negativeC. Neither negative or positiveD. Somewhat positiveE. Positive
FR-1
How important do you think it is that WisDOT implement this BP?
A. Not at allB. SlightlyC. SomewhatD. VeryE. Extremely
Not at all Slightly Somewhat Very Extremely0
2
4
6
8
10
12
14
1
5
12
6
How important is it to implement FR-1?