Business opportunities and
challenges in new markets
29.11.2016
Karthikeyan Natarajan
Researcher
University of Eastern Finland,
Joensuu
POLAND India
A Triple Helix based BEST consortium
Case India (2013-2014):
UEF, TUT, LUKE, Fortum, Valmet, VTT, Arbonaut, TERI, local Govt departments
Public
actorsIndustries
R&D
Institutions
Consortium:
Case Poland (2015-2016):
UEF, TUT, UO, LUKE, Fortum, Valmet, VTT, Arbonaut, Nicolaus Copernicus University, University of Lodz, Statistics department, local Marshal offices
Research methods applied in India and Poland
Policy/market
India
Resources
Supply chain
Technology
Poland
Policy review
Scenario modeling
Field survey
Policy review
Field survey
Satellite images
Sustainability
Existing inventory
Field survey
Satellite images
Existing inventory
Cost model
ICT solutionsCost model
Simulation model (basic)
CHP
Fuel quality & properties
Combustion modeling
Fuel quality & properties
3D Optimization modeling
Status of biomass market in Poland
(Dominating role of Policy actions)
Green
Certificate
Cofiring Hydro
WindBiomass
Obligation Quota
Substitution FeeSupply
RE generation
Demand
5,23
7,126,2 6
2011 2012 2013 2014
Biomass Consumption (MT)
6,947,67
6,716
2011 2012 2013 2014
Biomass Price (€/GJ)
70,5
26 25 25
2011 2012 2013 2014
Green certificate price (€/MWh)
48,3349,73 50,34
45,38
2011 2012 2013 2014
Electricity Price (€/GJ)
1€=4PLN (2015)
<
Green
Certificate
Cofiring Hydro
WindBiomass
Obligation Quota
Substitution FeeSupply
RE generation
Demand
5,23
7,126,2 6
2011 2012 2013 2014
Biomass Consumption …
6,947,67
6,716
2011 2012 2013 2014
Biomass Price (€/GJ)
70,5
26 25 25
2011 2012 2013 2014
Green certificate price (€/MWh)
Unsold 15TWh
GC since 2012
19 TWh
2015 RE generation
17 TWh 2015 redemption
48,3349,73 50,34
45,38
2011 2012 2013 2014
Electricity Price (€/GJ)
1€=4PLN (2015)
>
Status of biomass market in Poland
(Dominating role of Policy actions)
Challenges facing the biomass industry in India(Diversified India)
0500
100015002000250030003500
Rupees/M
T
2009-2010
2013-2014
No Plant characteristics Units Value
1 Installed capacity MWe 10
2 Investment cost (no land price) Crores
(MEuros)
65 (8.1)
3 C.F (fuel-to-power) % 19
4 Biomass tons/day 450-500
5 Carbon credits – UNFCCC Rs/Kwh 1.5 - 3.6
6 Employees – permanent
(temporary)
nos 40(60)
7 Emission savings CO2equi/year 46,991
Farmer price
4 €∕MWh
Supply chain
5.8 €∕MWhBiomass @ plant
9.8 €∕MWhBiomass
Indian
Western
Cost of Electricity is 85€∕MWhe
Cost of Electricity is 76€∕MWhe
REC incentives
17.8 €∕MWhe
Tariff
60 €∕Mwhe,
80 €∕Mwhe
Challenges facing the biomass industry in India(Diversified India)
Business opportunities in revamping the
biomass industry in India
Pic, Valmet
Power, VTT
Opportunities for reciprocal knowledge and technology transfer between
Finland, Poland and India.
Paddy straw
(India)
Wheat straw
(Poland)
Finnish
know-how
Finnish
know-how
CHP
Cofiring
(Poland)
Biomass
plant (India)
Miscanthus
(Poland)
Elephant
grass (India)
New circular economy solutions for an
Indian energy market(Great opportunities of technology and knowledge transfer)
ZGO GAĆ
RDF Production
ProducersMSWSegregation
unitsRecovery
Fuel
processing RDF CHPsEnergy Consumers
Acceptance
New circular economy solutions for an
Indian energy market(Great opportunities of technology and knowledge transfer)
Thank you!
Source: google