Bespoke Contract_Mohd Norizam M.S._Thesis (Sypnosis)

download Bespoke Contract_Mohd Norizam M.S._Thesis (Sypnosis)

of 28

Transcript of Bespoke Contract_Mohd Norizam M.S._Thesis (Sypnosis)

  • 7/28/2019 Bespoke Contract_Mohd Norizam M.S._Thesis (Sypnosis)

    1/28

    ii

    TITLE PAGE

    OIL & GAS REGISTERED CONTRACTOR SATISFACTION AND WHETHER

    COLLABORATION AND PARTNERING ARE HAPPENING IN A BESPOKE

    CONTRACT

    MOHD. NORIZAM BIN MD. SALLEH

    A Masters Project submitted in partial fulfilment of the requirements for thedegree of Master Project Management

    Centre for Graduate StudiesOpen University Malaysia

    2012

  • 7/28/2019 Bespoke Contract_Mohd Norizam M.S._Thesis (Sypnosis)

    2/28

    iii

    OIL & GAS REGISTERED CONTRACTOR SATISFACTION AND WHETHER

    COLLABORATION AND PARTNERING ARE HAPPENING IN

    A BESPOKE CONTRACT

    MOHD. NORIZAM BIN MD. SALLEH

    October 2012

    ABSTRACT

    This dissertation shall spell out some definitions and the differences between thestandard contract and bespoke contract. Most researches that had been conducted in the

    past were more focused on the issues faced by the client/project providers with their

    registered contractors e.g. qualities of works, reasons of being late, disputes, variation

    orders, poor management and planning, voidable of construction contract, extension of

    time claims and etc. All those studies were normally concentrating on standard contract

    which are widely used in our country e.g. PWD 203a/b (rev. 2007), PAM, CIDB, IEM

    and etc. Therefore the author felt there is a need to carry out a study to find out whether

    bespoke contract which are commonly used by the oil and gas and telecommunication

    sectors can offers better relation between client and the contractors, towards modern

    approach such as win-win strategy instead of win-lose, smart partnering, collaboration,

    cooperative, shared risk and etc. This study shall concentrate on whether the registeredcontractors involved in this kind of contract trully understood and are satisfied with the

    Condition of Contract, which bind their construction works.

    A set of questionnaire will be distributed among the respondents which consist of the

    companys owner and the contractors management staffs e.g. their project managers,

    contract managers, engineers, quantity surveyor and construction manager. The

    questionnaires and the survey are designed to measure and identify the level of

    satisfaction of the targeted group of a Natural Gas Providers Condition of Contract

    and whether collaboration and partnering are practised. Collected data from the

    questionnaires will be examined, analysed and is expected to be able to determine the

    level of satisfaction of the targeted group and conclusion will later be made. The

    findings and conclusions will be able to advise us whether or not the contractors

    understand the Condition of Contract correctly, whether it offers a good relationship

    between client and contractors towards achieving smart partnership, win-win

    approach, long-term relationships, cooperative, collaboration, shared risk and etc.

    From the questionnaires gathered and analysed, conclusions and suggestions may

    further strengthen the bond between client and the contractors will be made. At the end

    of the report, recommendations will be made on what are the requirements for future

    studies.

    (Keywords: Oil & Gas Registered Contractor Satisfaction, Collaboration, Partneringand Bespoke Contract)

  • 7/28/2019 Bespoke Contract_Mohd Norizam M.S._Thesis (Sypnosis)

    3/28

    iv

    KEPUASHATIAN KONTRAKTOR GAS & MINYAK BERDAFTAR DAN

    SAMADA USAHA-SAMA DAN PERKONGSIAN BERLAKU DALAMKONTRAK BESPOK

    MOHD. NORIZAM BIN MD. SALLEH

    Oktober 2012

    ABSTRAK

    Penulisan ini akan menyentuh sedikit definisi dan perbezaan di antara kontrak standard

    dan kontrak bespok. Kebanyakkan penyelidikan yang dilakukan terdahulu lebih terarah

    kepada masalah-masalah yang dihadapi oleh pihak pemberi kontrak dengan kontraktor-kontraktor berdaftar mereka seperti kualiti kerja, sebab kelewatan, pertikaian, variasi

    kerja, pengurusan dan perancangan yang lemah, kontrak yang terbatal, tuntutan

    tambahan masa dan lain-lain. Kebanyakkan kajian tersebut lebih menjurus kepada

    kontrak standard yang digunakan dengan meluas di negara ini seperti JKR 203a/b (versi

    2007), PAM, CIDB, IEM dan lain-lain. Jestru penulis merasakan satu keperluan untuk

    menjalankan kajian untuk mengenal-pasti samada kontrak bespok yang digunakan

    dengan meluas oleh sektor minyak dan gas serta telekomunikasi menawarkan hubungan

    yang lebih baik di antara pihak pemberi kontrak dengan para kontraktor di dalam

    mencapai pendekatan moden seperti strategi menang-menang, perkongsian, kolaborasi,

    kerja-sama, berkongsi risiko dan lain-lain. Kajian ini akan mengkaji adakah kontraktor

    minyak dan gas berdaftar yang terlibat dalam kontrak sebegini lebih memahami dan

    berpuas-hati dengan Kondusi Kontrak yang memeterai kerja-kerja pembinaan

    mereka.

    Satu set soalan soal-selidik akan diagihkan kepada responden yang terdiri daripada

    pemilik syarikat dan staf pengurusan seperti pengurus projek, pengurus kontrak,

    jurutera, jurukur bahan dan pengurus pembinaan. Soalan soal-selidik dan kaedah

    pemeriksaan telah direka khas agar ianya dapat menilai dan mengenal-pasti tahap

    kepuasan kelompok sasaran terhadap Kondusi Kontrak yang digunakan oleh sebuah

    syarikat Pembekal Gas Asli, juga samada kolaborasi dan usaha-sama dipraktikkan.

    Data-data yang dikumpul akan diperiksa, dianalisis dan dijangka akan membolehkantahap kepuasan kumpulan sasaran dikenal-pasti dan keputusanya diketahui. Keputusan

    yang diperolehi akan mengenal-pasti samada pihak kontraktor memahami Kondusi

    Kontrak sepenuhnya, samada ianya menawarkan hubungan yang baik di antara pihak

    pemberi kontrak dan kontraktor di dalam mencapai kerja-sama bijak, pendekatan

    menang-menang, hubungan jangka-panjang, usaha-sama, kolaborasi, perkongsian

    risiko dan lain-lain. Daripada soal-selidik yang dikumpul dan telah dianalisis,

    kesimpulan di ikuti dengan cadangan akan diberikan yang mungkin boleh

    mempereratkan lagi hubungan di antara pihak pemberi kontrak dengan kontraktor. Pada

    penghujung laporan, cadangan akan keperluan terhadap kajian lanjutan akan diberikan.

    (Kata kunci: Kepuashatian Kontraktor Minyak & Gas Berdaftar, Usaha-sama,Perkongsian dan Kontrak Bespok).

  • 7/28/2019 Bespoke Contract_Mohd Norizam M.S._Thesis (Sypnosis)

    4/28

    v

    ACKNOWLEDGEMENT

    I would like to thank Allah the Almighty for giving me the strength to complete this

    study. To my supervisor Ir. David Lee Seng Thean, I would sincerely express my

    gratitude for all the guidance and thoughts that he had given me from the beginning

    until the final stage in order to complete this research.

    Many thanks to all the respondents who had assisted me in the surveys carried out for

    my research and all the CGS staff that had directly or indirectly assisted me too. Not

    forgetting my beloved wife, my son other members of my family and friends who had

    motivated me throughout the research. Last but not least, I would also like to thank

    everyone who had contributed to the success of my research.

  • 7/28/2019 Bespoke Contract_Mohd Norizam M.S._Thesis (Sypnosis)

    5/28

    vi

    DECLARATION

    Name: Mohd . Norizam Bin Md. Salleh

    Matric Number: CGS 00534317

    I hereby declare that this Masters Project is the result of my own work, except for

    quotations and summaries which have been duly acknowledged.

    Signature: Date: 12th

    October 2012

  • 7/28/2019 Bespoke Contract_Mohd Norizam M.S._Thesis (Sypnosis)

    6/28

    vii

    TABLE OF CONTENTS

    COVER PAGE AND SPINE .................................................................................................. i

    TITLE PAGE ......................................................................................................................... ii

    ABSTRACT.......................................................................................................................... iiiABSTRAK ............................................................................................................................ iv

    ACKNOWLEDGEMENT ..................................................................................................... v

    DECLARATION .................................................................................................................. vi

    TABLE OF CONTENTS ..................................................................................................... vii

    LIST OF ABBREVIATIONS ............................................................................................... xi

    CHAPTER 1: INTRODUCTION .......................................................................................... 1

    1.1 Background Study ........................................................................................................ 1

    1.2 Problem Statement ....................................................................................................... 2

    1.3 Objective of the Study .................................................................................................. 3

    1.4 Key Questions .............................................................................................................. 4

    1.5 Scope of Study .............................................................................................................. 4

    1.6 Significance of Study ................................................................................................... 6

    1.7 Assumption and Limitation .......................................................................................... 7

    1.8 Dissertation Structure ................................................................................................... 8

    1.8.1 Chapter 1: Introduction .......................................................................................... 8

    1.8.2 Chapter 2: Literature Review ................................................................................. 9

    1.8.3 Chapter 3: Research Methodology ......................................................................... 9

    1.8.4 Chapter 4: Data Collection and Analysis ......................................................... 10

    1.8.5 Chapter 5: Conclusion and Recommendations .................................................... 10

    CHAPTER 2: LITERATURE REVIEW ............................................................................. 13

    2.1 Introduction ................................................................................................................ 13

    2.2 Registered Contractors Satisfaction .......................................................................... 13

    2.3 Bespoke Contract ........................................................................................................ 16

    2.4 Collaborative Approach .............................................................................................. 18

    2.5 Partnering ................................................................................................................... 25

    2.6 Research Instrument ................................................................................................... 32

    2.7 Summary ..................................................................................................................... 33

    CHAPTER 3: RESEARCH METHODOLOGY ................................................................. 35

    3.1 Introduction ................................................................................................................ 353.2 Research Design ......................................................................................................... 36

    3.3 Survey Method ........................................................................................................... 37

    3.3.1 Questionnaires ...................................................................................................... 38

    3.3.2 Semi Structures Interview .................................................................................... 40

    3.3.3 Pilot Study ............................................................................................................ 41

    3.4 Sampling Method ....................................................................................................... 41

    3.4.1 Respondents ......................................................................................................... 42

    3.4.2 How to Distribute the Questionnaires Forms. ...................................................... 42

    3.5 Likert Scale ................................................................................................................. 43

    3.6 Data Analysis.............................................................................................................. 43

    3.6.1 SPSS to Analyse Data and Identify Their Reliability .......................................... 443.6.2 Average Index (AI) .............................................................................................. 45

  • 7/28/2019 Bespoke Contract_Mohd Norizam M.S._Thesis (Sypnosis)

    7/28

    viii

    TABLE OF CONTENT, continued

    3.6.3 Validation of the Research Instrument ................................................................. 46

    3.7 Research Framework .................................................................................................. 48

    3.8 Summary ..................................................................................................................... 50

    CHAPTER 4: DATA COLLECTION AND ANALYSIS .................................................. 51

    4.1 Introduction ................................................................................................................ 51

    4.2 Findings ...................................................................................................................... 52

    4.2.1 Result from the Pilot Study .................................................................................. 52

    4.3 Result from Data Collection ....................................................................................... 53

    4.3.1 Demographic of the Respondents ........................................................................ 55

    4.3.1.1 Question no 1 ................................................................................................. 55

    4.3.1.2 Question no 2, How long the respondent company was already in the

    industry? ................................................................................................................... 56

    4.3.1.3 Question 3: Respondents Age ...................................................................... 57

    4.3.1.4 Question 4: Respondents Gender ................................................................. 58

    4.3.1.5 Question 5: Respondents Marital Status ....................................................... 58

    4.3.1.6 Question 6: Respondents Education Background ........................................ 59

    4.3.1.7 Question 7: Respondents Current Position ................................................... 60

    4.3.1.8 Question 8: Respondents Number of Years in the Company ....................... 61

    4.3.1.9 Question 9: Respondents Number of Years Working in the Industry .......... 62

    4.3.1.10 Question 10: Respondents Total Number of Years of Working

    Experiences ................................................................................................................ 62

    4.3.1.11 Question 11: Whether Respondents Know What is a Bespoke Contract? . 63

    4.3.2 Findings From the Key Questions........................................................................ 64

    4.3.2.1 Registered Contractor Satisfaction on the Bespoke Form of ContractUsed ........................................................................................................................... 65

    4.3.2.2 Establishment and communication of conflict resolution strategy ................ 68

    4.3.2.3 Commitment to Win-win Attitude ................................................................. 70

    4.3.2.4 Regular Monitoring of Partnering and Collaboration Process ....................... 72

    4.3.2.5 Clear Definition of Responsibilities .............................................................. 73

    4.3.2.6 Mutual Trust .................................................................................................. 74

    4.3.2.7 Willingness to Eliminate Non-value Added Activities .................................. 75

    4.3.2.8 Early Implementation of Partnering Process ................................................. 76

    4.3.2.9 Willingness to Share Resources among Project Participants ......................... 77

    4.3.2.10 Ability to Generate Innovative Ideas ........................................................... 78

    4.3.2.11 Frequency for Subcontractors Involvement ............................................... 794.4 Testing Goodness of Data .......................................................................................... 79

    4.4.1 Reliability Statistics ............................................................................................. 80

    4.5 Summary ..................................................................................................................... 80

    CHAPTER 5: DISCUSSION, CONCLUSION AND RECOMMENDATION .................. 87

    5.1 Introduction ................................................................................................................ 87

    5.2 Summary of Main Findings ........................................................................................ 87

    5.2.1 Research Objective no. 1 ...................................................................................... 87

    5.2.2 Research Objective no. 2 ...................................................................................... 88

    5.2.3 Research Objective no. 3 ...................................................................................... 89

    5.3 Limitations .................................................................................................................. 905.4 Conclusion .................................................................................................................. 91

  • 7/28/2019 Bespoke Contract_Mohd Norizam M.S._Thesis (Sypnosis)

    8/28

    ix

    TABLE OF CONTENT, continued

    5.5 Recommendations for Future Studies ........................................................................ 91

    REFERENCES .................................................................................................................... 93

    APPENDIX A COVER LETTER TO THE RESPONDENT .......................................... 99APPENDIX B THE QUESTIONNAIRES ..................................................................... 101

    LIST OF FIGURES

    Figure 1. 1: Research Flow Chart (Adapted from:Chong, 2008) ........................................ 12

    Figure 2. 1: Summary of significant factors affecting from partnering success. ................. 31

    Figure 3. 1: Five (5) Category Scale to Show the Levels of a Person According to a

    Question Asked. ................................................................................................ 43

    Figure 3. 2: Framework for Research Methodology ............................................................ 49

    Figure 4. 1: Number of Years the Present Company in the Industry. .................................. 56

    Figure 4. 2: Respondents Age. ........................................................................................... 57

    Figure 4. 3: Respondents Gender. ...................................................................................... 58

    Figure 4. 4: Respondents Marital Status. ............................................................................ 59

    Figure 4. 5: Respondents Education Background. ............................................................. 60

    Figure 4. 6: Respondents Current Position. ........................................................................ 60

    Figure 4. 7: Respondents Number of Years Working in Current Company. ..................... 61Figure 4. 8: Respondents Number of Years Working in Oil & Gas Industry. ................... 62

    Figure 4. 9: Respondents Total Number of Years Working Experiences. ......................... 63

    Figure 4. 10: Whether Respondent Know What Bespoke Contract is? ............................... 64

  • 7/28/2019 Bespoke Contract_Mohd Norizam M.S._Thesis (Sypnosis)

    9/28

    x

    LIST OF TABLES

    Table 4. 2: Results on the Questions Under Registered Contractor Satisfaction on the

    Bespoke Form of Contract Uses ....................................................................... 66Table 4. 3, continued ............................................................................................................ 67Table 4. 4: Frequency for Establishment and communication of conflict resolution

    strategy .............................................................................................................. 68Table 4. 5: Results on the Questions under Establishment and Communication of

    Conflict Resolution Strategy ............................................................................. 69Table 4. 6: Frequency for Commitment to Win-win Attitude ............................................. 70Table 4. 7: Results on the Questions under Commitment to Win-win Attitude .................. 71Table 4. 8: Results on the Questions under Regular Monitoring of Partnering and

    Collaboration Process ....................................................................................... 73Table 4. 9: Frequency for Clear Definition of Responsibilities ........................................... 73Table 4. 10: Results on the Questions under Clear Definition of Responsibilities ............. 74Table 4. 11: Frequency for Mutual Trust ............................................................................. 74Table 4. 12: Results on the Questions under Mutual Trust ................................................. 75Table 4. 13: Frequency for Willingness to Eliminate Non-value Added Activities ............ 75Table 4. 14: Willingness to Eliminate Non-value Added Activities ................................... 76Table 4. 15: Frequency for Early Implementation of Partnering Process ........................... 76Table 4. 16: Results on the Questions under Early Implementation of Partnering Process 77Table 4. 17: Frequency for Willingness to Share Resources among Project Participants ... 77Table 4. 18: Results on the Questions under Willingness to Share Resources among

    Project Participants ........................................................................................... 78Table 4. 19: Frequency for Ability to Generate Innovative Ideas ....................................... 78Table 4. 20: Results on the Questions under Ability to Generate Innovative Ideas ............ 78Table 4. 21: Frequency for Subcontractors Involvement ................................................... 79Table 4. 22: Results on the Questions under Subcontractors Involvement ........................ 79Table 4. 23: Reliability Statistics ......................................................................................... 80

  • 7/28/2019 Bespoke Contract_Mohd Norizam M.S._Thesis (Sypnosis)

    10/28

    xi

    LIST OF ABBREVIATIONS

    % percentage

    & and

    / Or

    APM Association for Project Management

    CGS Centre of Graduate Studies

    CIDB Construction Industry Development Board

    Dr Doctor of Philosophy

    DOSH Department of Safety and Health

    e.g. Example

    EC Energy Commissions of MalaysiaEOT Extension of Time

    et al. et al. also known as and others

    FIDIC International Federation of Consulting Engineers

    GLCs Government Linked Companies

    ICE Institution of Civil Engineer

    IEM The Institution of Engineers Malaysia

    ISO International Organisation for Standardization

    JCT Joint Contract Tribunal

    JKR Jabatan Kerja Raya

    KL Kuala Lumpur

    LAD Liquidated Ascertain DamageMBAM Master Builders Association Malaysia

    MCMC Malaysia Communications and Multimedia Commission

    MPM Master of Project Management

    NEC New Engineering Contract

    NO Number of

    OUM Open University Malaysia

    PAM Persatuan Arkitek Malaysia

    PMC Project Management Company

    PWD Public Road Work

    SPSS Statistical Package the Social Sciences for Windows

    SOR Standard of Rates

    VO Variation Order

    Cronbachs Alpha

  • 7/28/2019 Bespoke Contract_Mohd Norizam M.S._Thesis (Sypnosis)

    11/28

    1

    CHAPTER 1: INTRODUCTION

    1.1Background Study

    There are various types of contracts for construction business in Malaysia. For

    governmental, government linked companies (GLCs) and private contracts standard

    form (PWD 203a/b - revision 2007, PAM, CIDB or IEM) are used. For international

    contracts, standard contract forms such as the JCT, APM, ICE, FIDIC, NEC and etc.

    might be used depending on the country of origin of the project providers and the

    consultant or the project management company (PMC) involved. In some industries

    such as Oil and Gas and Telecommunications, a modified type of contract derived from

    any existing standard form of contract will be used.

    Standard form of contract is always labelled as a traditional contract strategy that was

    blamed for the edgy relationship between the project provider and the contractors in

    achieving a common desired outcome or in other words led them to later fail to perform

    as a team. A good thing about standard form of contracts is that they have endured years

    of test, were designed by experts in the field, provide a representative viewpoint of the

    industry they served and therefore will normally be a fair contract. The standard form of

    contract should represent both parties on an equal and a fair share basis and not one-

    sided which are sometimes found in a bespoke contract. Standard forms of contract

    normally express the obligation of all the parties involved and clarify the scope of the

    project well.

  • 7/28/2019 Bespoke Contract_Mohd Norizam M.S._Thesis (Sypnosis)

    12/28

    2

    In Malaysia a bespoke contracts are commonly used in the Oil and Gas and

    Telecommunication sectors. As the works that to be carried out are specialist jobs, the

    clients normally choose to have their own group of registered contractors to do the job.

    Although a bespoke contract is often labelled as one-sided contract but with a good

    payment term, safeguard given by the project providers, modern contract strategies such

    as win-win approach, partnering, joint decisions, collaboration, rewards, cooperation,

    trusts and etc., may help in meeting the common project objectives which is to complete

    the project within or ahead of time, within budget and at an acceptable quality, safety

    and sustainability.

    1.2Problem Statement

    In the past, researches were more concentrated on the issues faced by the client/project

    providers with their contractors. However, the scope of studies is mainly covering other

    subjects for instance, the qualities of works, reasons for being late, disputes, variation

    orders, poor management and planning, void construction contract, extension of time

    claims, acceleration claims and etc. But all these studies were only concerned and

    related to the standard form of contract that are widely used in our country e.g. PWD

    203a/b (revision 2007), PAM (with quantities), CIDB, IEM and etc.

    Traditional contract strategies were always identified as a hindrance to a good working

    relationship between the client and the contractors. On the other hand, the modern

    contract strategies which encourage the client and contractors to work as a team, work

    collaboratively, smart partnering, win-win approach, trust, cooperative, trust, shared

  • 7/28/2019 Bespoke Contract_Mohd Norizam M.S._Thesis (Sypnosis)

    13/28

    3

    risk, reward and etc. are encouraging the client and the contractors to work together

    towards achieving the common goals which are to complete the project/task on or ahead

    of schedule, within budget and at acceptable or as stipulated quality.

    There are few studies related to a bespoke contract. Therefore the author felt that there

    is a need to fill up this void. Among the problems to be addressed in this study are as

    follows;

    i) Are the registered contractors to a bespoke contract satisfied with the form of

    contract used and how it is managed by the client?

    ii) Whether the modern contract strategy is being practised in a bespoke contract.

    1.3Objective of the Study

    In order to achieve the purpose of the study, the following objectives have been

    suggested:

    i) To identify whether the registered contractors fully understand the form of contract

    they use, specifically the bespoke form of contract.

    ii) To identify whether the registered contractors are satisfied with the bespoke contract

    that were commonly used in the Oil & Gas and Telecommunication Sectors.

  • 7/28/2019 Bespoke Contract_Mohd Norizam M.S._Thesis (Sypnosis)

    14/28

    4

    iii) To identify whether the modern contract strategies such as collaboration and

    partnering are being practiced in their contract.

    1.4Key Questions

    About 80% of the key questions which are later adopted into research questionnaires are

    adapted from Chan A. P. C. et al. (2004) and they are as follows:

    i) Registered contractor satisfaction on the bespoke form of contract uses;

    ii) Establishment and communication of conflict resolution strategy;

    iii) Commitment to win-win attitude;

    iv) Regular monitoring of partnering and collaboration process;

    v) Clear definition of responsibilities;

    vi) Mutual trust;

    vii) Willingness to eliminate non-value added activities;

    viii) Early implementation of partnering process;

    ix) Willingness to share resources among project participants.

    x) Ability to generate innovative ideas;

    xi)

    Subcontractors involvement;

    1.5Scope of Study

    The scope of this study is focused on the followings:

  • 7/28/2019 Bespoke Contract_Mohd Norizam M.S._Thesis (Sypnosis)

    15/28

    5

    a) Whether the registered contractors fully understand the form of contract they use

    especially the bespoke form of contract.

    b) Whether the registered contractors are satisfied with the bespoke contract that is

    commonly used in the Oil & Gas and Telecommunication sectors.

    c) Whether the modern contract strategies such as collaboration and partnering are

    being practiced in their contract.

    A set of questionnaire will be distributed to the respondents which include the

    companys owner and the contractors management staff for instance their project

    managers, contract managers or engineers. The survey & questionnaires were designed

    to identify all the issues which were stated in the problem statements and aimed to a

    Natural Gas Operators/Supplier.

    Both standard forms of contract and bespoke contract have clauses provided for

    employers to determinate the contract according to the reasons as stated. Not all

    contractors are familiar with the clauses provided under the form of contract either due

    to their background, years of experiences in the fields, the level of academic possessed,

    job position and etc. Therefore the study on contractors satisfaction in the form of

    contract, the contract strategies, and etc. shall also cover the demographic and

    personality profiling patterns of the contractors.

  • 7/28/2019 Bespoke Contract_Mohd Norizam M.S._Thesis (Sypnosis)

    16/28

    6

    1.6Significance of Study

    There are few studies related to bespoke contract. Therefore the author felt that there is

    a need to carry out a study to find out whether bespoke contract that are commonly used

    in the oil and gas and telecommunication sectors offers better relation between client

    and the contractors, whether the modern approach such as win-win strategy instead of

    win-lose that have been practiced in the traditional contract are being practised in these

    fields, whether a good relation between the client and the contractors via smart

    partnering, collaboration, cooperative, shared risk and etc. are practised.

    This study will concentrate on whether the registered contractors have fully understood

    and satisfied with the form of contract used works and whether the modern contract

    strategies as mentioned above are being practised.

    This study can also be used as a basic guide for those who are involved in the industries

    that are using a bespoke form of contract. Once a problem statement is clearly

    understood towards achieving smart partnering, collaboration, win-win strategy,

    cooperative, and etc., other construction industries may also benefited.

  • 7/28/2019 Bespoke Contract_Mohd Norizam M.S._Thesis (Sypnosis)

    17/28

    7

    1.7Assumption and Limitation

    This study shall be limited to the bespoke form of contract used by a Natural Gas

    Operator/Supplier. A set of questionnaire will be distributed to the respondents (the

    registered contractors) which include the companys owner and the contractors

    management staff for instance their project managers, contract managers or engineers.

    Among the reasons are because the duration of the study is very short in which is only

    roughly about 6 months.

    Being among of the pioneer studies in registered contractor satisfaction and its relation

    to the modern contract strategies, this literature might be very useful as a point of

    reference and comparison. Therefore the survey that is to be carried out within the same

    group of people should contribute to a good result. Although managing contracts among

    the client and contractors will include the scope of constructions and form of contract

    used, this study will not discuss the details of these areas.

    This study will not touch on the comparisons between the bespoke form of contract

    used by the company studied in this study and the standard form of contract that are

    broadly used in Malaysia such as PWD 203a/b (revision 2007), PAM, CIDB and IEM

    and the international standard form of contracts such as JCT, APM, ICE, FIDIC, NEC

    and etc.

  • 7/28/2019 Bespoke Contract_Mohd Norizam M.S._Thesis (Sypnosis)

    18/28

    8

    1.8Dissertation Structure

    This project paper will be presented in five chapters starting with an introduction,

    literature review, research methodology, data collections and analysis and concluded

    with the conclusion and recommendations.

    The chapters are briefly explained as follows:

    1.8.1 Chapter 1: Introduction

    This chapter will present the background of the dissertation in general. Research issue

    pertaining to this study were gathered from intensive reading of books, academic

    journals, referred conferences, reports, dissertations, articles, trade journals, handbooks,

    and dictionaries which can easily be extracted from the Open University library. It was

    based on this information that the problem statement and the objectives were then

    identified and clearly explained

    This research is carried out to review whether the registered contractors to a bespoke

    form of contract uses by a Natural Gas Provider/Supplier fully understood the form of

    contract used especially the bespoke form of contract; To identify whether the registered

    contractors are satisfied with the bespoke contract that is commonly used in the Oil &

    Gas and Telecommunication Sectors; and to identify whether the modern contract

    strategies such as collaboration and partnering are being practised in their contract.

  • 7/28/2019 Bespoke Contract_Mohd Norizam M.S._Thesis (Sypnosis)

    19/28

    9

    1.8.2 Chapter 2: Literature Review

    When the Research Issues and objectives have been determined, various

    documentations and literature reviews regarding to the research field will be collected to

    achieve the research objectives.

    Generally, secondary data are collected from the latest printed reading materials such as

    journals, books, research papers, reports, newspapers and from the internet as well. It is

    important to identify the determination, background and definition concerning the

    subject areas such as the bespoke contract, satisfaction, modern contract strategies e.g.

    collaboration, partnering and etc.

    1.8.3 Chapter 3: Research Methodology

    This chapter reviews on the research design and methodologies used in this research.

    Questionnaire and case study by means of semi-structured interviews are applied to

    fulfil the research objective within the time frame provided. The structures of research

    design and questionnaire construction are clearly elaborated in this chapter.

    A set of questionnaire will be designed to meet the study objectives and will be

    distributed among the respondents ranging from the companys owner and the

    contractors management staffs including their project managers, contract managers,

    quantity surveyors and engineers.

  • 7/28/2019 Bespoke Contract_Mohd Norizam M.S._Thesis (Sypnosis)

    20/28

    10

    The survey & questionnaires are designed to measure and identify all the issues in the

    problem statement and the key questions. The questionnaires will be distributed to the

    targeted group who are belongs to the registered contractors to a selected Natural Gas

    Operators/Supplier.

    1.8.4 Chapter 4: Data Collection and Analysis

    Collected data from the questionnaires will be stored, examined and analysed using

    Statistical Package the Social Sciences for Windows (SPSS). This software will assist

    the author in analysing the data gathered using statistic and graphs. The results will

    enable the author in determining and making the conclusion whether the problem

    statements and the research objectives are met.

    1.8.5 Chapter 5: Conclusion and Recommendations

    Finally, the whole process of the study will be reviewed with the intention to determine

    whether or not the problem statements are solved and the research objectives have been

    achieved. Collected data from the questionnaires will be examined, analysed and are

    expected to be able to determine the level of satisfaction of the dedicated group, their

    understandings on the stipulated contracts, number of years serviced in the industry,

    background and etc.

  • 7/28/2019 Bespoke Contract_Mohd Norizam M.S._Thesis (Sypnosis)

    21/28

    11

    The conclusion of these findings will later be concluded. There are a few conclusions

    that are anticipated in this dissertation that would be able to advise us whether the

    registered contractors fully understood the form of contract they use especially the

    bespoke form of contract, whether they are satisfied with the bespoke contract that is

    commonly used in the Oil & Gas and Telecommunication sectors and whether the

    modern contract strategies such as collaboration and partnering are being practised in

    their contract.

    Conclusions followed by suggestions are made towards further strengthening of the

    relationship between the client and the contractors and how to improve the practices of

    the new contract strategies in a project that may benefit the industry. At the end of the

    report, recommendations shall be made on what are the requirements to be considered

    for future studies.

  • 7/28/2019 Bespoke Contract_Mohd Norizam M.S._Thesis (Sypnosis)

    22/28

    12

    Stage 1: Preliminary Study

    & Topic Selection

    Stage 2: Research Proposal

    Stage 3: Data Collection& Analysis

    Stage 4: Conclusion

    Figure 1. 1: Research Flow Chart (Adapted from:Chong, 2008)

    Identify Area of Study

    Problem identification and topic selection

    Literature Review

    Development of research objectives,

    questionsand scope

    Formation of ResearchMethodology

    Decision on Instruments to Use

    Conclusion &

    Recommendations

    Data Collection

    Primary Data

    Semi-structured

    interview

    Questionnaires

    Secondary Data

    Articles

    Journals

    Books

    Website

    Data Analysis and

    Findings

    Validation

  • 7/28/2019 Bespoke Contract_Mohd Norizam M.S._Thesis (Sypnosis)

    23/28

    93

    REFERENCES

    Achrol, R. S. (1997). Changes in the Theory of Inter-Organizational Relations in

    Marketing: Toward a Network Paradigm. Journal of the Academy of Marketing

    Science, (25(1)).

    American Arbitration Association. (1993). Construction Industry Dispute Avoidance:

    The Partnering Process. American Arbitration Association: NCDRC, New York.

    Ashworth, A. (2006). Contractual Procedures: In the Construction Industry (5 ed.).

    Harlow, England: Pearson Prentice Hall.

    Asmah, M. I. (2012). Masalah Kontraktor Dorman Yang Berdaftar di Lembaga

    Pembangunan Industri Pembinaan Malaysia (cidb). Universiti Teknologi

    Malaysia.

    Bell, J. (1993). How to Complete Your Research Project Successfully: A Guide for

    First-Time Researchers. New Delh: UBS Publishers Distributors Ltd.

    Bell, J. (1996). Doing Your Research Project: A Guide for First Time Researcher in

    Education and Social Sience.

    Bennett, J., and Jayes, S. (1995). Trusting the Team: The Best Practice Guide to

    Partnering in Construction.

    Bennett, J., and Jayes, S. (1998). The seven pillars of partnering: A guide to second

    generation partnering. London: Thomas Telford.

    Betts, M., and Smith, D. (1999). Strategic Management of IT in Construc tion. Oxford,

    U.K.: Blackwell Science.

    Beyerlein, M. M., Freedman, S., McGee, C., & Moran, L. (2003). Beyond teams:

    Building the Collaborative Organization. San Francisco: John Wiley & Sons, Inc.

    Bishop, D., Felstead, A., Fuller, A., Jewson, N., Unwin, L., & Kakavelakis, K. (2009).

    Constructing learning: adversarial and collaborative working in the British

    construction industry. Journal of Education and Work, 22(4), 243-260.doi:10.1080/13639080903290355

    Bresnen, M., and Marshall, N. (2000a). Partnering in Construction: A Critical Review

    of Issues, Problems and Dilemmas. Constr Manage. Econom., (18), p 229237.

    Bresnen, M., and Marshall, N. (2000b). Motivation, commitment and the use of

    incentives in partnerships and alliances. Constr. Manage. Econom, (18), p 587

    598.

    Carlile, P. R. (2004). Transferring, translating, and transforming: An integrative

    framework for managing knowledge across boundaries. Organization Science,15(5).

  • 7/28/2019 Bespoke Contract_Mohd Norizam M.S._Thesis (Sypnosis)

    24/28

    94

    REFERENCES, continued

    Chan Albert P. C. , Chan Daniel W. M. , Chiang Y. H. , Tang B.S., C. E. H. W. and H.

    K. S. K. C. (2004). Exploring Critical Success Factors for Partnering inConstruction Projects, (April), p 188-199.

    Chan Albert P.C., C. D. W. M. and H. K. S. K. (2003). Partnering in Construction :Critical Study of Problems for Implementation, (July), 126-136.

    Charue Duboc, F., & Midler, C. (1998).No TitleBeyond advanced project management:

    Renewing engineering practices and organizations in Projects as arenas for

    renewal and learning processes. (R. A. L. and C. Midler, Ed.). Boston: Kluwer.

    Cheng, N. (2012). Buying an Automobile in China: How Customer Satisfaction isLinked to Perceived Subjective.An International Journal, 40(1), p 147-156.

    Child, J., & McGrath, R. G. (2001). Organizations Unfettered: Organizational Form in

    an Information-Intensive Economy. Academy of Management Journal, 44(6),

    1135-1149.

    Chong, H. (2008). Clarify of Construction Contract. University Teknology Malaysia.

    Churchill, G. A. and I. (2004). D. Marketing research: Methodological Foundations

    (9th ed.). Ohio: Thomson South-Western.

    Cloke, K., & Goldsmith, J. (2002). The end of management and the rise of

    organizational democracy. San Francisco: Jossey-Bass.

    Conner, J. (2003). Gaining the advantages of team intelligence. Human Resource

    Planning, 26(3).

    Cook, L. and Huncher, E. (1990). Partnering: Contractor for Future. Journal of

    Managemeng in Engineering, 11(5)(September/October).

    Cowan, C., Gray, C., and Larson, E. J. (1992). Project Partnering. Project Manage,

    (22(4)), p 512.

    Cresswell, J. (1994).Research Design: Qualitative and Quantitative. Sage.

    Critchlow, J. (1998). Making Partnering Work in the Construction Indus try. Oxford:

    Chandos.

    Elmarsafi, G. M. (2008). Interorganizational Collaboration: Transformation Strategies

    to Reduce Construction Disputes in the Construction Industry. Capella University.

    Erdogan, B., Anumba, C. J., Asce, F., Bouchlaghem, D., & Nielsen, Y. (2009).

    Collaboration Environments for Construction: Implementation Case Studies,24(4), 234-245.

  • 7/28/2019 Bespoke Contract_Mohd Norizam M.S._Thesis (Sypnosis)

    25/28

    95

    REFERENCES, continued

    Fisher, N., and Green, S. (2001). Partnering and the UK construction industry: The first

    ten yearsA review of the literature. Modernising construction, National AuditOffice, p 5866.

    Geyskens, I & Steenkamp, J. E. M. (2000). Economic and Social Satisfaction:

    Measurement and Relevance to Marketing Channel Relationship. Journal of

    Retailling, 76(1), p 11-32.

    Gibson, C. B., Zellmer-Bruhn, M. E., & Schwab, D. P. (2003). Team Effectiveness in

    Multinational Organizations: Evaluation Across Contexts. Group & Organization

    Management,, 28(4), p 444-474.

    Golafshani, N. (2003). Understanding Reliability and Validity in Qualitative Research,8(4), pg 597-606. Retrieved from http://www.nova.edu/ssss/QR/QR8-

    4/golafshani.pdf

    Graziano, A. M. and Raulin, M. L. (2004).Research Methods A Process of Inquiry (5

    ed.). Boston: Pearson Education.

    Gulati, R. (1998). Alliances and networks. Strategic. Management Journal, (19(4)), p

    293-317.

    Gulati, R. (1999). Where do interorganizational networks come from? American

    Journal of Sociology, (104(5)), p 1439-1493.

    Hardy, C., & Phillips, N. (1998). Strategies of engagement: Lessons from the critical

    examination of collaboration and conflict in an interorganization domain.

    Organization Science,, (9(2)), p 217-230.

    Harty, C. (2005). Innovation in Construction: A Sociology of Technology Approach.

    Building Research & Information, 33(6), p 512-522.

    Joppe, M. (2000). The Research Process. Retrieved from Retrieved February 25, 1998,

    from http://www.ryerson.ca/~mjoppe/rp.htm

    Kogut, B. (1998). Joint venture: theoretical and empirical perspectives. Strategic

    Management Journal,, (9(4)), p 319-332.

    Kotler, P. & Clarke, R. N. (1987).Marketing for Health Care Organisation. Englewood

    Cliffs: NJ: Prentice Hall.

    Kotter, J. P. (1996).Leading Change. Boston: Harvard Business School Press.

    Larson, E. J. (1995). Project Partnering: Results of Study of 280 Construction Projects.

    Manage. Eng., 11(2), p 3035.

  • 7/28/2019 Bespoke Contract_Mohd Norizam M.S._Thesis (Sypnosis)

    26/28

    96

    REFERENCES, continued

    Larson, E., and Drexler, J. A. (1997). Barriers to Project Partnering: Report From the

    Firing Line. Proj. Manage, (28(1), p 4752.

    Li, D., and Green, D. (1996). Project partnering in Australia. Austr. Proj. Manage.,

    (16(3)), p 3743.

    Macy, B. A., & Izumi, H. (1993). Organizational Change, Design, and Work

    Innovation.Research in Organizational Change and Development, (7), p 235-313.

    Mc Caffer and Zaimi, M. (1977). Assessment of Work Performance Engineering,

    Maintenance Contractors In Saudi Arabia.Journal of Management In Engineering.

    McEvily, B., & Zaheer, A. (1999). Bridging ties: A source of firm heterogeneity incompetitive capabilities. Strategic Management Journal, 20(12), p 1133-1156.

    Mohd Yusri, A. (2007). Kesan Projek Pembangunan Loji Jana Kuasa Tanjung Bin Ke

    Atas Sosio-Ekonomi Penduduk. University of Technoology Malaysia.

    Mohd. Majid, K. (2000). Kaedah Penyelidikan Pendidikan. Kuala Lumpur: Dewan

    Bahasa dan Pustaka.

    Moran, P., & Ghoshal, S. (1996). Value Creation by Firms. Academy of Management

    Review, 21(1), p 58-72.

    Naum, S. G. (2002). Dissertation Research and Writting: For Construction Students.

    Butterworth-Heinemann: Elsevier Sience Ltd.

    Ng, S. T., Rose, T. M., Mak, M., and Chen, S. E. (2002). Problematic Issues Associated

    With Project PartneringThe Contractor Perspective. Int. J. Proj. Manage., (20),

    p 437449.

    Ng., K. L. (2006). Value Management in Construction Industry. Universiti Teknologi

    Malaysia.

    Nicolajsen, H. (2007). ICT use in inter-organizational collaboration: the field of

    construction. Proceedings of the 30th Information Systems Research Seminar in

    Scandinavia IRIS.

    Nooteboom, B., H. B. & N. G. N. (1997). Effects of trust and governance on relational

    risk.Academy of Management Journal, (40(2)), p 308-339.

    Ranjit Kumar. (1996). Research Methodology: A Step-By-Step Guide For Beginners.

    Addison Wesley: Longman Australia P. Limited.

    Sawhney, M. (2002). Dont Just Relate - Collaborate. MIT Sloan Management Review,43(3)(96).

  • 7/28/2019 Bespoke Contract_Mohd Norizam M.S._Thesis (Sypnosis)

    27/28

    97

    REFERENCES, continued

    Scott, B. T. (2001). Partnering in EuropeIncentive Based Alliancing for Projects.

    London: Telford.

    Sekaran, U. (2003). Research Methods for Business: A Skill- Building Approach (4th

    Editio.). USA: John Wiley & Sons, Inc.

    Smith, P.C., Kendall, L.M. & Hulin, C. L. (1969). The Mea- surement of Satisfaction in

    Work and Retirement: a Strategy for the Study of Attitudes. CA: Rand McNally &

    Company.

    Soetanto, R., & Proverbs, D. G. (2002). Modelling the satisfaction of contractors: the

    impact of client performance. Engineering Construction and Architectural

    Management, 9(5-6), 453-465. doi:10.1046/j.1365-232X.2002.00278.x

    Syed Arabi, I. (1992). Kaedah Penyelidikan Komunikasi dan Sains Sosial. Kuala

    Lumpur: Dewan Bahasa dan Pustaka & Kementerian Pendidikan Malaysia.

    Tang, W., Duffield, C. F., & Young, D. M. (2006). Partnering Mechanism in

    Construction: An Empirical Study on the Chinese Construction Industry, (March),217-230.

    Tu, R. (2004). Beyond Service Quality and Expectation: The critical Impact of

    Emotions and Service Experience on Customer Satisfaction.Unpublished doctoral

    dissertation,. Unpublished Phd Dissertation, University of North Carolina, Chapel

    Hill.

    Turner, J. R. (2009). Contracting for Project Management. England: Gower Publishing

    Limited.

    US Army Corps of Engineers. (1991). Construction Partnering: Joint Pursuit of

    Common Goals to Enhance Engineering Quality. US Army Corps of Engineers:

    Omaha, NB.

    Van Eyk, H., & Baum, F. (2002). Learning About Interagency Collaboration: TrialingCollaborative Projects Between Hospitals and Community Health Services.Health

    and Social Care in the Community, 10(4),, p 262-269.

    Wainer, H. & B. (1998). H. I. Test Validity. Hilldale, NJ: Lawrence Earlbaum

    Associates.

    Walker, D., and Hampson, K. B. S. (2003). Procurement StrategiesA Relationship-

    Based Approach. U.K.: Oxford.

    Wiersma, W. R. (1995). Methods in Education: An Introduction (6th ed.). Boston:

    Allyn and Bacon.

  • 7/28/2019 Bespoke Contract_Mohd Norizam M.S._Thesis (Sypnosis)

    28/28

    REFERENCES, continued

    Winter, G. (2000). A comparative discussion of the notion of validity in qualitative and

    quantitative research. The Qualitative Report. Retrieved February 25, 2000, fromfrom http://www.nova.edu/ssss/QR/QR4-3/winter.html

    Wong, S. F. (2009). A model for Minimizing Satisfaction Gap in Partnership

    Development. The Hong Kong Polytechnic University (Hong Kong). Retrieved

    from ProQuest Dissertations and Theses, Retrieved from

    http://search.proquest.com/docview/305146690?accountid=48462