What You Need to Know About MSE Berms

March 27, 2017

Page 2: Berms mass swana march 2017

Overview

• MSE Berm Design

• MSE Berm Construction

• MSE Berm Monitoring

ARM Group Inc. A Technically Oriented Earth Sciences & Engineering Firm 2

Page 3: Berms mass swana march 2017

3

MSE Berm Design

ARM Group Inc. Vision. Partnership. Results.

Page 4: Berms mass swana march 2017

MSE Berm Design

4

Conceptual Layout: • Geometric optimization

Thorough Site Investigation: • Soil borings/test pits • Laboratory testing • Groundwater

characterization • Field reconnaissance

ARM Group Inc. Vision. Partnership. Results.

Page 5: Berms mass swana march 2017

MSE Berm Design

5 ARM Group Inc. Vision. Partnership. Results.

How Tall to Make Berm

Costs & Losses Total Harms

Page 6: Berms mass swana march 2017

MSE Berm Design

6

Design Considerations

Soil specifications: • What soil is available and from where will it be sourced? Soil can greatly impact

project economics. • Does soil require special processing or drainage features to be installed within

MSE berm? • Any special conformance testing? • What is the strength of the soil? • What stress conditions will be present?

Geosynthetic reinforcement specifications:

• What are the appropriate reduction factors? • Any special conformance testing?

Subgrade/Subsurface conditions:

• Any subgrade requirements? Drainage? Rate of construction and/or consolidation?

ARM Group Inc. Vision. Partnership. Results.

Page 7: Berms mass swana march 2017

MSE Berm Design

7 ARM Group Inc.

• Determine “critical” stability sections based upon geometry, existing conditions, loading conditions, etc.

• Iterative process to ensure adequate factors of safety for internal, global, and compound stability.

• Geosynthetic reinforcement elements are lengthened, shortened, or strengths are changed to get adequate factors of safety.

• Great advancements in slope stability software in the past 10 years.

Slope Stability Analysis

Page 8: Berms mass swana march 2017

MSE Berm Design

8

• Additional cross-sections can optimize geosynthetic reinforcement design (i.e., reduce required length and/or spacing requirements and consequently, costs).

• Optimize design for a consistent factor of safety throughout the length of the berm.

• Review design for conflicts with infrastructure.

Geogrid Optimization

ARM Group Inc. Vision. Partnership. Results.

DRAINAGE! DRAINAGE! DRAINAGE!

Page 9: Berms mass swana march 2017

MSE Berm Design

9

Design Insights Experienced geotechnical engineers familiar with MSE berm design are critically

important. Additionally, experienced design engineers can save client significant money in Total Project Cost.

If geosynthetic reinforcement vendors are used during the design, global & compound stability must be independently confirmed by geotechnical engineer.

Design guidance provided by FHWA Publications: • Slopes vs. Walls • Fine vs. Coarse Grained Soils • Performance Criteria • Design Life

ARM Group Inc.

Vision. Partnership. Results.

Page 10: Berms mass swana march 2017

MSE Berm Design

10

Unique ARM Designs

• Solar Integrated MSE Berm (patented) • MSE Berm on Waste Subgrade • Alternative Backfill (crushed

asphalt/brick/concrete) [ABC Material] • Shored MSE Berms • Soft, Saturated Subgrade • Ash Backfill MSE Berm

ARM Group Inc. Vision. Partnership. Results.

Page 11: Berms mass swana march 2017

Innovation

11

ARM patented technology.

Anchors for the solar panels are installed within the MSE berm.

Photovoltaic solar panels are attached

to the anchors along the face of the MSE berm.

Important environmental benefits.

Maximization of the revenue

generating area at a facility.

Solar-integrated MSE Berms

ARM Group Inc. Vision. Partnership. Results.

Page 12: Berms mass swana march 2017

Innovation

12

The availability and cost of suitable structural fill will significantly impact the bottom-line of an MSE berm project.

Crushed concrete, asphalt, and masonry may be a suitable backfill source.

ARM designed an MSE berm using

incinerator ash as backfill for a landfill in Pennsylvania.

Alternative Backfill / Beneficial Reuse

ARM Group Inc. Vision. Partnership. Results.

Page 13: Berms mass swana march 2017

MSE BERM CONSTRUCTION

13 ARM Group Inc. Vision. Partnership. Results.

Page 14: Berms mass swana march 2017

MSE Berm Construction

14

Typical Facing Detail

ARM Group Inc. Vision. Partnership. Results.

Page 15: Berms mass swana march 2017

MSE Berm Construction

15

Subgrade Preparation and MSE Berm Construction

ARM Group Inc. Vision. Partnership. Results.

Page 16: Berms mass swana march 2017

MSE Berm Construction

16

Welded wire form and biaxial (facing) geogrid installation

ARM Group Inc. Vision. Partnership. Results.

Page 17: Berms mass swana march 2017

MSE Berm Construction

17

Installation of ECM following biaxial geogrid.

ARM Group Inc. Vision. Partnership. Results.

Page 18: Berms mass swana march 2017

MSE Berm Construction

18

Setting uniaxial geogrid following installation of ECM and biaxial geogrid.

ARM Group Inc. Vision. Partnership. Results.

Page 19: Berms mass swana march 2017

MSE Berm Construction

19

Uniaxial geogrid, ECM, and bodkin connection installation

Page 20: Berms mass swana march 2017

MSE Berm Construction

ARM Group Inc. 20

Separation of uniaxial geogrid and reinforced backfill installation.

Page 21: Berms mass swana march 2017

MSE Berm Construction

21

Progression of reinforced backfill installation and interior slope grading

ARM Group Inc. Vision. Partnership. Results.

Page 22: Berms mass swana march 2017

MSE Berm Construction

22

Liner installation on interior slope of MSE berm.

ARM Group Inc. Vision. Partnership. Results.

Page 23: Berms mass swana march 2017

MSE Berm Construction

23

Utilities atop MSE berm crest and access road. Protective cover visible on slope, leachate pump system riser pipes, valve vault, anchor trench low-perm soil, litter control fence poles, and stormwater management channel.

ARM Group Inc. Vision. Partnership. Results.

Page 24: Berms mass swana march 2017

MSE Berm Construction

24

Utilities atop MSE berm crest and access road. Litter control fence poles, and stormwater management drop inlet channel with trash rack – future tie-in for final cover system downchute.

ARM Group Inc. Vision. Partnership. Results.

Page 25: Berms mass swana march 2017

MSE Berm Construction

25

Options:

45’ tall steel litter control fence poles, heavy duty guiderail, security fence, and access road pavement.

ARM Group Inc. Vision. Partnership. Results.

Page 26: Berms mass swana march 2017

MSE Berm Construction

26

Vegetated MSE berm facing

ARM Group Inc. Vision. Partnership. Results.

Page 27: Berms mass swana march 2017

MSE Berm Construction

27 ARM Group Inc. Vision. Partnership. Results.

Page 28: Berms mass swana march 2017

MSE Berm Construction

28

Construction inspection and testing are critical for MSE berm projects

Experienced construction monitors are essential

Experienced contractors can make a large difference in project success

Quality construction materials are important

Construction inspection certification provides added assurance to stakeholders

Construction-Phase Engineering and Construction Quality Assurance Experienced construction-phase engineering and CQA are essential for MSE berm projects to be completed on-time, within budget, and in accordance with the permitted design and CQA Plan.

ARM Group Inc. Vision. Partnership. Results.

Page 29: Berms mass swana march 2017

MSE BERM MONITORING

29 ARM Group Inc. Vision. Partnership. Results.

Page 30: Berms mass swana march 2017

MSE Berm Monitoring

30

Possible Instrumentation:

Settlement Plates Survey Monuments Inclinometers

MSE berms should be inspected on a regular basis.

Inclinometers are the most prevalent. Provide continuous monitoring of displacement

throughout the MSE berm and subgrade profile.

Visual Inspections Should be completed by a PE with MSE berm

experience.

ARM Group Inc. Vision. Partnership. Results.

Page 31: Berms mass swana march 2017

MSE Berm Monitoring

31

Projects should develop a comprehensive Monitoring, Maintenance, & Inspection Plan. Monitoring Program:

• Instrumentation Readings • Data Analyzation

Inspection Program:

• Routine site inspections • PE inspections • Erosion, vegetation, geogrid

assessment, movement, etc. • Annual alignment survey

Maintenance Program:

• Vegetation maintenance • Stormwater channel maintenance • Roadway maintenance

ARM Group Inc. Vision. Partnership. Results.

Page 32: Berms mass swana march 2017

Thank You

32

Questions?

Benjamin S. Allen, P.E. ARM Group Inc.

[email protected] Phone: (717) 250-5581

ARM Group Inc. Vision. Partnership. Results.

Page 33: Berms mass swana march 2017

ARM Group Inc.

33

Established in 1998 Civil and Environmental Engineering Firm Full suite of services to support the solid waste industry Office & Personnel Locations:

o Hershey, PA (HQ) o State College, PA o Wilkes-Barre, PA o Pittsburgh, PA o Columbia, MD

MSE berm designs at landfills in PA, CT, & MA

ARM Group Inc. Vision. Partnership. Results.