Bergstrom Spur Platinum Planning Study Central …...PowerPoint Presentation Author Stephanie Silver...

7
Bergstrom Spur Platinum Planning Study Central Segment: Congress Avenue to Todd Lane Central Segment

Transcript of Bergstrom Spur Platinum Planning Study Central …...PowerPoint Presentation Author Stephanie Silver...

Page 1: Bergstrom Spur Platinum Planning Study Central …...PowerPoint Presentation Author Stephanie Silver Created Date 7/20/2020 6:31:31 PM ...

Bergstrom Spur Platinum Planning Study

Central Segment:Congress Avenue to Todd Lane

Central Segment

Page 2: Bergstrom Spur Platinum Planning Study Central …...PowerPoint Presentation Author Stephanie Silver Created Date 7/20/2020 6:31:31 PM ...

✓Create access to nearby destinations

✓Improve safety along the I-35 underpass crossing

✓Provide safe crossings at major intersections

✓Make it easy to access nearby trails

✓Collaborate with local businesses to create a sense of place

✓Include benches and art to make corridor more attractive and useable

What We Heard: Central SegmentCongress Avenue to Todd Lane

Page 3: Bergstrom Spur Platinum Planning Study Central …...PowerPoint Presentation Author Stephanie Silver Created Date 7/20/2020 6:31:31 PM ...

Central Segment Concepts: Congress Avenue to Todd Lane

A

Mabel Davis Park

Country Club Creek

Trail

Co

ng

ress

Ave

nu

e

Sprin

gs

Terr

y-O

San

tia

go

Industrial Drive

Page 4: Bergstrom Spur Platinum Planning Study Central …...PowerPoint Presentation Author Stephanie Silver Created Date 7/20/2020 6:31:31 PM ...

Central Segment Concepts: Congress Avenue to Todd Lane

A

Page 5: Bergstrom Spur Platinum Planning Study Central …...PowerPoint Presentation Author Stephanie Silver Created Date 7/20/2020 6:31:31 PM ...

Central Segment Concepts: Congress Avenue to Todd Lane

AA

Page 6: Bergstrom Spur Platinum Planning Study Central …...PowerPoint Presentation Author Stephanie Silver Created Date 7/20/2020 6:31:31 PM ...

Future Transit Concepts: West of I-35 and I-35 Crossing

OPTIONS:

1. Produce a level crossing for both the trail and transit.

2. Underground crossing for transit with a street-level hike and bike path.

Page 7: Bergstrom Spur Platinum Planning Study Central …...PowerPoint Presentation Author Stephanie Silver Created Date 7/20/2020 6:31:31 PM ...

Take the survey atcampotexas.org/get-involved

Submit comments or request printed materials at 512-761-2224 or email [email protected]

Share Your Input