-1- BepiColombo/MMO: MDP MMO-SWG #3 [March 2006] C. Noshi/RASC, Kyoto Univ. MMO Mercury Magnetospheric Orbite MDP (Mission Data Processor) for BepiColombo MMO Y. Kasaba, T. Takashima, H. Hayakawa (MDP Core Team = JAXA/BepiColombo Project Offi ce) [MDP team] Core Members PSU NTS & H. Hayakawa (JAXA) IPD NTS & Y. Kasaba (JAXA) DPU MHI & Y. Kasaba & T. Takashi ma (JAXA) MPPE (for MDP-1) incl. support to MGF-O T. Takashima, K. Asamura (JAXA) PWI (for MDP-2) incl. support to M GF-I/MSASI/MDM Y. Kasahara, T. Imachi (Kanazawa U) Supported by ISAS Data Handling Group

Transcript of BepiColombo/MMO: MDP MMO-SWG #3 [March 2006] -1- C. Noshi/RASC, Kyoto Univ. MMO Mercury...

Page 1: BepiColombo/MMO: MDP MMO-SWG #3 [March 2006] -1- C. Noshi/RASC, Kyoto Univ. MMO Mercury Magnetospheric Orbiter MDP (Mission Data Processor) for BepiColombo.

-1-

BepiColombo/MMO: MDPMMO-SWG #3 [March 2006]

C. Noshi/RASC, Kyoto Univ.

MMO

Mercury Magnetospheric Orbiter

MDP (Mission Data Processor)for BepiColombo MMO

Y. Kasaba, T. Takashima, H. Hayakawa(MDP Core Team = JAXA/BepiColombo Project Office)

[MDP team]Core Members PSU NTS & H. Hayakawa (JAXA) IPD NTS & Y. Kasaba (JAXA) DPU MHI & Y. Kasaba & T. Takashima (JAXA)

MPPE (for MDP-1) incl. support to MGF-O T. Takashima, K. Asamura (JAXA)

PWI (for MDP-2) incl. support to MGF-I/MSASI/MDM Y. Kasahara, T. Imachi (Kanazawa U) H. Kojima, Y. Ueda (RISH/Kyoto U) Y. Kasaba (JAXA)

Supported by ISAS Data Handling Group

Page 2: BepiColombo/MMO: MDP MMO-SWG #3 [March 2006] -1- C. Noshi/RASC, Kyoto Univ. MMO Mercury Magnetospheric Orbiter MDP (Mission Data Processor) for BepiColombo.

-2-

BepiColombo/MMO: MDPMMO-SWG #3 [March 2006]

[Meetings incl. Payload members] * Large meetings: before the next MMO-Design Meeting & MMO-SWG in May-June.

(with the update of “I-ICD FAQ” and “MMO-Payload Action Item List”)

[Electrical] * PSU might be independently prepared for the instruments outside of MDP. * Grounding Concept in MDP-2 : It will be fixed based on the EM test by PWI.

[Mechanical / Thermal] * Vertical style: It will be studied in detail in 2006FY.

[DPU] * SpaceWire I/F : Hardware design is progressed.

Test hardware (= E-GSE in future) is in development. * Software : Conceptual design is progressed.

[Development Schedule] *Schedule for MDP & Its I/F is updated.

Progress from Jan. 2006

Page 3: BepiColombo/MMO: MDP MMO-SWG #3 [March 2006] -1- C. Noshi/RASC, Kyoto Univ. MMO Mercury Magnetospheric Orbiter MDP (Mission Data Processor) for BepiColombo.

-3-

BepiColombo/MMO: MDPMMO-SWG #3 [March 2006]

PSU[DC/DC

Converter]

IPD[Switcher/

Limiter]

Sp

ace

cra

ft S

ys

tem

Mission Data Processor [MDP-1]

DPU: 9 clients[CPU+MEM]

PSU[DC/DC

Converter]

Mission Data Processor [MDP-2] MGF-in

MDM (elec)

Command

Telemetry

Power

Command

Telemetry

Power

MGF-out

MEA1 (sensor/elec.)

MGF-in (sensor)

MDM (sensor)

MSASI (sensor/elec.)

MGF-out (sensor)

PI instrumentsCommon instruments

PWIEWO-E/B (+AM2P)

MEFISTO-ESORBET

MEFISTO (pre/sensor)

SC (elec/sensor)

IPD[Switcher/

Limiter]

MEA2 (sensor/elec.)

MIA (sensor/elec.)

MSA (sensor/elec.)

HEP-ele (sensor/elec.)

HEP-i (sensor/elec.)

ENA (sensor/elec.)

MAST-AC/DCMAST/WPT-E

WPT (pre/sensor)     (motor/HK)

DPU: 10 clients[CPU+MEM]

Electrical concept (Old: Jan 2006)

1 Hz sync

Page 4: BepiColombo/MMO: MDP MMO-SWG #3 [March 2006] -1- C. Noshi/RASC, Kyoto Univ. MMO Mercury Magnetospheric Orbiter MDP (Mission Data Processor) for BepiColombo.

-4-

BepiColombo/MMO: MDPMMO-SWG #3 [March 2006]

Mission Data Processor [MDP-1]

Mission Data Processor [MDP-2]

PSU[DC/DC

Converter]

IPD[Switcher/

Limiter]

Sp

ace

cra

ft S

ys

tem

DPU: 9 clients[CPU+MEM]

PSU[DC/DC

Converter]

MGF-in

MDM (elec)

Command

Telemetry

Power

Command

Telemetry

Power

MGF-out

MEA1 (sensor/elec.)

MGF-in (sensor)

MDM (sensor)

MSASI (sensor/elec.)

MGF-out (sensor)

PI instrumentsCommon instruments

PWIEWO-E/B (+AM2P)

MEFISTO-ESORBET

MEFISTO (pre/sensor)

SC (elec/sensor)

IPD[Switcher/

Limiter]

MEA2 (sensor/elec.)

MIA (sensor/elec.)

MSA (sensor/elec.)

HEP-ele (sensor/elec.)

HEP-i (sensor/elec.)

ENA (sensor/elec.)

MAST-AC/DCMAST/WPT-E

WPT (pre/sensor)     (motor/HK)

DPU: 10 clients[CPU+MEM]

Electrical concept: New (Mar 2006)

1 Hz sync

Page 5: BepiColombo/MMO: MDP MMO-SWG #3 [March 2006] -1- C. Noshi/RASC, Kyoto Univ. MMO Mercury Magnetospheric Orbiter MDP (Mission Data Processor) for BepiColombo.

-5-

BepiColombo/MMO: MDPMMO-SWG #3 [March 2006]

Mechanical / ThermalMDP Chassis plan (Mar.2006)

Page 6: BepiColombo/MMO: MDP MMO-SWG #3 [March 2006] -1- C. Noshi/RASC, Kyoto Univ. MMO Mercury Magnetospheric Orbiter MDP (Mission Data Processor) for BepiColombo.

-6-

BepiColombo/MMO: MDPMMO-SWG #3 [March 2006]

MGF-O-E

IPD-1

DPU-CPU

DPU-I/F

IPD-2

MDP-1  PSU

16

2.5

mm

(TB

D)

25mm(TBD)

179mm(TBD)

MDP-2

All: <=A5-size

Mechanical / ThermalMDP Chassis plan (Mar.2006)

Digital / Power partshould be separated & insulated.

Page 7: BepiColombo/MMO: MDP MMO-SWG #3 [March 2006] -1- C. Noshi/RASC, Kyoto Univ. MMO Mercury Magnetospheric Orbiter MDP (Mission Data Processor) for BepiColombo.

-7-

BepiColombo/MMO: MDPMMO-SWG #3 [March 2006]

MGF-I-E

IPD-1

DPU-CPU

DPU-I/F

IPD-2

SORBET

AM2P

MEFISTO

MAST/WPT-E

MDP-2  PSU

30mm(TBD)25mm(TBD)

334mm(TBD)

16

2.5

mm

(TB

D)

50mm(TBD)

MDP-2

All: <=A5-size

Mechanical / ThermalMDP Chassis plan (Mar.2006)Order is free.

It will be defined by MHIbased on the simplification.

Digital / Power part: separated & insulated from PWI/MGF

EWO-E-fieldEWO-B-field

Page 8: BepiColombo/MMO: MDP MMO-SWG #3 [March 2006] -1- C. Noshi/RASC, Kyoto Univ. MMO Mercury Magnetospheric Orbiter MDP (Mission Data Processor) for BepiColombo.

-8-

BepiColombo/MMO: MDPMMO-SWG #3 [March 2006]

*Action Items in 2006FY

1) Establishment of “MDP-Chassis concept” = “Vertical style”Development & Test of “MDP MTM” & “MDP-STM” in Apr-Sep 2006.

(No support from each payload team is requested at the moment.)

2) Establishment of “PCB” inside MDP-1 & MDP-2.Following matters will be updated & discussed after the MDP-STM test.

- Frame concept- Heat Path concept- Harness & Connector concept

Mechanical / ThermalMDP Chassis plan (Mar.2006)