BNI Presentation - Maximize SEO Benefits of Your BNI Membership
Benton and Franklin Counties - TRIDEC · •Treated 2.1 billion gallons of groundwater, removed 90...
Transcript of Benton and Franklin Counties - TRIDEC · •Treated 2.1 billion gallons of groundwater, removed 90...
![Page 1: Benton and Franklin Counties - TRIDEC · •Treated 2.1 billion gallons of groundwater, removed 90 tons of ... BNI Washington River Protection Solutions WRPS Hanford Prime Contracts.](https://reader033.fdocuments.us/reader033/viewer/2022050602/5fa9da571921174cbf26aec8/html5/thumbnails/1.jpg)
1
State of the labor market:Benton and Franklin Counties
(Kennewick-Pasco-Richland MSA)
Ajsa Suljic, Regional Labor Economist
Labor Market and Performance Analysis
February 1th, 2017
![Page 2: Benton and Franklin Counties - TRIDEC · •Treated 2.1 billion gallons of groundwater, removed 90 tons of ... BNI Washington River Protection Solutions WRPS Hanford Prime Contracts.](https://reader033.fdocuments.us/reader033/viewer/2022050602/5fa9da571921174cbf26aec8/html5/thumbnails/2.jpg)
2
Nonfarm employment
continued growth
Source: Employment Security Department/LMPA; U.S. Bureau of Labor Statistics/CES
![Page 3: Benton and Franklin Counties - TRIDEC · •Treated 2.1 billion gallons of groundwater, removed 90 tons of ... BNI Washington River Protection Solutions WRPS Hanford Prime Contracts.](https://reader033.fdocuments.us/reader033/viewer/2022050602/5fa9da571921174cbf26aec8/html5/thumbnails/3.jpg)
3
Goods-producing moving
ahead with growth
Source: Employment Security Department/LMPA; U.S. Bureau of Labor Statistics/CES
![Page 4: Benton and Franklin Counties - TRIDEC · •Treated 2.1 billion gallons of groundwater, removed 90 tons of ... BNI Washington River Protection Solutions WRPS Hanford Prime Contracts.](https://reader033.fdocuments.us/reader033/viewer/2022050602/5fa9da571921174cbf26aec8/html5/thumbnails/4.jpg)
4
Manufacturing
Source: Employment Security Department/LMPA; U.S. Bureau of Labor Statistics/CES
![Page 5: Benton and Franklin Counties - TRIDEC · •Treated 2.1 billion gallons of groundwater, removed 90 tons of ... BNI Washington River Protection Solutions WRPS Hanford Prime Contracts.](https://reader033.fdocuments.us/reader033/viewer/2022050602/5fa9da571921174cbf26aec8/html5/thumbnails/5.jpg)
5
Construction
Source: Employment Security Department/LMPA; U.S. Bureau of Labor Statistics/CES
![Page 6: Benton and Franklin Counties - TRIDEC · •Treated 2.1 billion gallons of groundwater, removed 90 tons of ... BNI Washington River Protection Solutions WRPS Hanford Prime Contracts.](https://reader033.fdocuments.us/reader033/viewer/2022050602/5fa9da571921174cbf26aec8/html5/thumbnails/6.jpg)
6
Service-providing industries
Source: Employment Security Department/LMPA; U.S. Bureau of Labor Statistics/CES
![Page 7: Benton and Franklin Counties - TRIDEC · •Treated 2.1 billion gallons of groundwater, removed 90 tons of ... BNI Washington River Protection Solutions WRPS Hanford Prime Contracts.](https://reader033.fdocuments.us/reader033/viewer/2022050602/5fa9da571921174cbf26aec8/html5/thumbnails/7.jpg)
7
Education and Healthcare
Source: Employment Security Department/LMPA; U.S. Bureau of Labor Statistics/CES
![Page 8: Benton and Franklin Counties - TRIDEC · •Treated 2.1 billion gallons of groundwater, removed 90 tons of ... BNI Washington River Protection Solutions WRPS Hanford Prime Contracts.](https://reader033.fdocuments.us/reader033/viewer/2022050602/5fa9da571921174cbf26aec8/html5/thumbnails/8.jpg)
8
Hanford employment vs.
Other nonfarm employment
![Page 9: Benton and Franklin Counties - TRIDEC · •Treated 2.1 billion gallons of groundwater, removed 90 tons of ... BNI Washington River Protection Solutions WRPS Hanford Prime Contracts.](https://reader033.fdocuments.us/reader033/viewer/2022050602/5fa9da571921174cbf26aec8/html5/thumbnails/9.jpg)
9
Government employment
Source: Employment Security Department/LMPA; U.S. Bureau of Labor Statistics/CES
![Page 10: Benton and Franklin Counties - TRIDEC · •Treated 2.1 billion gallons of groundwater, removed 90 tons of ... BNI Washington River Protection Solutions WRPS Hanford Prime Contracts.](https://reader033.fdocuments.us/reader033/viewer/2022050602/5fa9da571921174cbf26aec8/html5/thumbnails/10.jpg)
10
Covered employment 2015
All Sectors
Average
Annual
Employment
% of Total
Employment Total Annual Wages % of Total Wages
Average
Annual Wage
All Industries 115,478 100.0% 5,479,152,071 100.0% $47,448
Ag., forestry, fishing & hunting 12,748 11.0% 341,820,737 6.2% $26,814
Mining * * * * *
Utilities * * * * *
Construction 6,347 5.5% 350,549,839 6.4% $55,231
Manufacturing 7,808 6.8% 359,067,817 6.6% $45,987
Wholesale trade 3,304 2.9% 175,789,956 3.2% $53,205
Retail trade 12,465 10.8% 356,739,525 6.5% $28,619
Transportation & warehousing 2,340 2.0% 97,070,224 1.8% $41,483
Information 853 0.7% 37,888,569 0.7% $44,418
Finance & insurance 2,036 1.8% 115,378,958 2.1% $56,669
Real estate & rental & leasing 1,588 1.4% 47,539,982 0.9% $29,937
Professional & technical services 9,978 8.6% 900,429,959 16.4% $90,242
Mgmt.of companies & enterprises 329 0.3% 33,548,839 0.6% *
Administrative & waste services 10,512 9.1% 771,215,312 14.1% $73,365
Educational services 795 0.7% 26,596,767 0.5% $33,455
Health care & social assistance 13,069 11.3% 566,665,985 10.3% $43,360
Arts, entertainment, & recreation 1,686 1.5% 22,887,169 0.4% $13,575
Accommodation & food services 8,477 7.3% 145,721,385 2.7% $17,190
Other services, ex. public admin. 2,391 2.1% 69,408,881 1.3% $29,029
Government 18,549 16.1% 1,035,345,159 18.9% $55,817
Source: U.S. Bureau of Labor Statistics-QCEW; Employment Security Department-LMPA
![Page 11: Benton and Franklin Counties - TRIDEC · •Treated 2.1 billion gallons of groundwater, removed 90 tons of ... BNI Washington River Protection Solutions WRPS Hanford Prime Contracts.](https://reader033.fdocuments.us/reader033/viewer/2022050602/5fa9da571921174cbf26aec8/html5/thumbnails/11.jpg)
11
Housing Index
(All-transactions)
Source: US. Federal Housing Finance Agency; Tri-City Realtor Association
![Page 12: Benton and Franklin Counties - TRIDEC · •Treated 2.1 billion gallons of groundwater, removed 90 tons of ... BNI Washington River Protection Solutions WRPS Hanford Prime Contracts.](https://reader033.fdocuments.us/reader033/viewer/2022050602/5fa9da571921174cbf26aec8/html5/thumbnails/12.jpg)
12
Population
Source: US Bureau of Economic Analysis
![Page 13: Benton and Franklin Counties - TRIDEC · •Treated 2.1 billion gallons of groundwater, removed 90 tons of ... BNI Washington River Protection Solutions WRPS Hanford Prime Contracts.](https://reader033.fdocuments.us/reader033/viewer/2022050602/5fa9da571921174cbf26aec8/html5/thumbnails/13.jpg)
13
Population distribution
by age group
Source: U.S. Census Bureau-American Community Survey 2015
![Page 14: Benton and Franklin Counties - TRIDEC · •Treated 2.1 billion gallons of groundwater, removed 90 tons of ... BNI Washington River Protection Solutions WRPS Hanford Prime Contracts.](https://reader033.fdocuments.us/reader033/viewer/2022050602/5fa9da571921174cbf26aec8/html5/thumbnails/14.jpg)
14
Labor force has recovered
as of Jan. ‘16
Source: Employment Security Department/LMPA; U.S. Bureau of Labor Statistics/LAUS
![Page 15: Benton and Franklin Counties - TRIDEC · •Treated 2.1 billion gallons of groundwater, removed 90 tons of ... BNI Washington River Protection Solutions WRPS Hanford Prime Contracts.](https://reader033.fdocuments.us/reader033/viewer/2022050602/5fa9da571921174cbf26aec8/html5/thumbnails/15.jpg)
15
Unemployment around the state
Source: Employment Security Department/LMPA; U.S. Bureau of Labor Statistics/LAUS
![Page 16: Benton and Franklin Counties - TRIDEC · •Treated 2.1 billion gallons of groundwater, removed 90 tons of ... BNI Washington River Protection Solutions WRPS Hanford Prime Contracts.](https://reader033.fdocuments.us/reader033/viewer/2022050602/5fa9da571921174cbf26aec8/html5/thumbnails/16.jpg)
16
Unemployment rate
continues to decrease
Source: Employment Security Department/LMPA; U.S. Bureau of Labor Statistics/LAUS
![Page 17: Benton and Franklin Counties - TRIDEC · •Treated 2.1 billion gallons of groundwater, removed 90 tons of ... BNI Washington River Protection Solutions WRPS Hanford Prime Contracts.](https://reader033.fdocuments.us/reader033/viewer/2022050602/5fa9da571921174cbf26aec8/html5/thumbnails/17.jpg)
17
Outlook for 2017
Another good year in employment for bi-county
area is expected in 2017.
Labor force rebound to shape the supply and
demand and to continue expansion.
Consumer expended incomes and increased
confidence in spending to drive much of the growth
for many industries.
Industries to look for in 2017 are: Healthcare,
Education, Construction, Manufacturing,
Transportation and Warehousing, and Leisure and
Hospitality
![Page 18: Benton and Franklin Counties - TRIDEC · •Treated 2.1 billion gallons of groundwater, removed 90 tons of ... BNI Washington River Protection Solutions WRPS Hanford Prime Contracts.](https://reader033.fdocuments.us/reader033/viewer/2022050602/5fa9da571921174cbf26aec8/html5/thumbnails/18.jpg)
18
Ajša Suljić
Regional Labor Economist
509-734-5928
esd.wa.gov/employmentdata
Thank you
![Page 19: Benton and Franklin Counties - TRIDEC · •Treated 2.1 billion gallons of groundwater, removed 90 tons of ... BNI Washington River Protection Solutions WRPS Hanford Prime Contracts.](https://reader033.fdocuments.us/reader033/viewer/2022050602/5fa9da571921174cbf26aec8/html5/thumbnails/19.jpg)
1
Presented by:
Hanford Site Outlook
2017 Tri-Cities RegionalEconomic Outlook
Tom Fletcher, Deputy Manager, Richland Operations Office
![Page 20: Benton and Franklin Counties - TRIDEC · •Treated 2.1 billion gallons of groundwater, removed 90 tons of ... BNI Washington River Protection Solutions WRPS Hanford Prime Contracts.](https://reader033.fdocuments.us/reader033/viewer/2022050602/5fa9da571921174cbf26aec8/html5/thumbnails/20.jpg)
2
Hanford Cleanup Overview
Three components
• Tank Waste
• Central Plateau
• River Corridor
Cleanup work
• Empty underground tank waste
• Treat waste for safe disposal
• Treat contaminated groundwater
• Demolish facilities
• Remove buried waste, contaminated soil near Columbia for safe disposal away from the river
![Page 21: Benton and Franklin Counties - TRIDEC · •Treated 2.1 billion gallons of groundwater, removed 90 tons of ... BNI Washington River Protection Solutions WRPS Hanford Prime Contracts.](https://reader033.fdocuments.us/reader033/viewer/2022050602/5fa9da571921174cbf26aec8/html5/thumbnails/21.jpg)
3
million gallons of waste retrieved from
underground storage tanks
million gallons of waste retrieved
from C Farm tanks
million gallons of waste retrieved
from S Farm tanks
million gallons tank space created in double-shell tanks
since 242-A Evaporator restarted in September, 2014
million gallons of liquid removed from DSTs since the
242-A Evaporator began operations in 1977
acres – the size of the WTP complex, which requires 263,000 cubic yards of concrete, 41,000 tons of structural steel, 900,000 feet of piping among other materials
3.43
1.62
1.083
2.2
70
16single-shell tanks retrieved to regulatory standards
65
By The Numbers – Office of River Protection
![Page 22: Benton and Franklin Counties - TRIDEC · •Treated 2.1 billion gallons of groundwater, removed 90 tons of ... BNI Washington River Protection Solutions WRPS Hanford Prime Contracts.](https://reader033.fdocuments.us/reader033/viewer/2022050602/5fa9da571921174cbf26aec8/html5/thumbnails/22.jpg)
4
of Hanford’s nine reactors have been “cocooned”
more reactors will be cocooned in the
coming years
percent of the site’s spent fuel has been moved
to dry storage
waste sites have been remediated
cubic meters of underground waste have been removed
SIX
TWO
100
1,303
12K
877facilities have
been demolished
billion gallons of groundwater have been treated, removing 300 tons of contamination
16
By The Numbers – Richland Operations Office
![Page 23: Benton and Franklin Counties - TRIDEC · •Treated 2.1 billion gallons of groundwater, removed 90 tons of ... BNI Washington River Protection Solutions WRPS Hanford Prime Contracts.](https://reader033.fdocuments.us/reader033/viewer/2022050602/5fa9da571921174cbf26aec8/html5/thumbnails/23.jpg)
5
Office of River Protection Progress
• Implemented actions to improve Tank Farms worker safety
• Completed 16th SST retrieval with tank C-111
• Continued infrastructure upgrades to support Tank Farms of the future
• Restarted Effluent Treatment Facility; processed 5 million gallons to date
• Initiated actions to start Direct Feed Low Activity Waste by 2022
• Resumed production engineering at High Level Waste facility AP Tank Farm Exhauster Stacks
Effluent Treatment Facility
Liquid Effluent Retention Facility Basins
Low Activity Waste FacilityCaustic Scrubber
![Page 24: Benton and Franklin Counties - TRIDEC · •Treated 2.1 billion gallons of groundwater, removed 90 tons of ... BNI Washington River Protection Solutions WRPS Hanford Prime Contracts.](https://reader033.fdocuments.us/reader033/viewer/2022050602/5fa9da571921174cbf26aec8/html5/thumbnails/24.jpg)
6
Richland Operations Office Progress
• Demolishing the site’s most hazardous facility, the Plutonium Finishing Plant
• Treated 2.1 billion gallons of groundwater, removed 90 tons of hazardous and radioactive contamination, last year
• Preparing to move radioactive sludge away from the Columbia River
• Finishing up projects near Columbia River to put full focus on large volume of work in center of Hanford Site
![Page 25: Benton and Franklin Counties - TRIDEC · •Treated 2.1 billion gallons of groundwater, removed 90 tons of ... BNI Washington River Protection Solutions WRPS Hanford Prime Contracts.](https://reader033.fdocuments.us/reader033/viewer/2022050602/5fa9da571921174cbf26aec8/html5/thumbnails/25.jpg)
7
Plateau Remediation Contract
PRCMission Support Contract
MSC
Facility and waste site cleanupgroundwater remediation and waste disposal
Cost-effective infrastructure and site services to support the cleanup mission
Design, Construction, and Commissioning of the Hanford Tank Waste Treatment & Immobilization Plant (WTP)
Tank Operations Contract
Monitor and manage the 177 underground storage tanks at Hanford, prepare for and provide waste feed delivery to the WTP.
Total Contract Value: $5.8B
Contract Term: 5 year with 5 year option
Total Contract Value: $3.6B
Contract Term: 5 year with 2 and 3 year option
Total Contract Value: $14.7B Total Contract Value: $6.1B
Contract Term: 5 year with 3 and 2 year options, ending in September, 2018
• Total contract fee $241M
• Cost plus award fee based on an annual fee determination composed primarily of multi-year project activities
• $1.3B in ARRA funds added to the contract
• Total Contract Fee: $210M
• Cost plus award fee with annual performance incentives, including objective and subjective measures
• Cost-Plus Award-Fee with Award and Multiple Fee Incentives
• Total Maximum Available Fee To Go $360M
Total contract fee: $209M
Cost plus award fee with annual award fee performance measure and multi-year performance incentives; 95% quantitative, 5% qualitative
Plateau Remediation Contract PRC
Mission Support ContractMSC
Bechtel National Inc.
BNI
Washington River Protection Solutions
WRPS
Hanford Prime Contracts
![Page 26: Benton and Franklin Counties - TRIDEC · •Treated 2.1 billion gallons of groundwater, removed 90 tons of ... BNI Washington River Protection Solutions WRPS Hanford Prime Contracts.](https://reader033.fdocuments.us/reader033/viewer/2022050602/5fa9da571921174cbf26aec8/html5/thumbnails/26.jpg)
8
Economic Benefits to Washington
• Hanford Site budget is about $2.3 billion per year
• DOE prime contractors reported $626 million of subcontracting in fiscal year 2016
• 9,175 total DOE federal and contractor employees
• Budget outlook
Continued need for cleanup at current funding levels in fore-seeable future
Cleanup mission continues to 2050-2060
![Page 27: Benton and Franklin Counties - TRIDEC · •Treated 2.1 billion gallons of groundwater, removed 90 tons of ... BNI Washington River Protection Solutions WRPS Hanford Prime Contracts.](https://reader033.fdocuments.us/reader033/viewer/2022050602/5fa9da571921174cbf26aec8/html5/thumbnails/27.jpg)
9
$0.00
$0.20
$0.40
$0.60
$0.80
$1.00
$1.20
$1.40
$1.60
FY2011 FY2012 FY2013 FY2014 FY2015 FY2016
RL
ORP
$ in
Bill
ion
s
Hanford Budget: Recent History and Current
![Page 28: Benton and Franklin Counties - TRIDEC · •Treated 2.1 billion gallons of groundwater, removed 90 tons of ... BNI Washington River Protection Solutions WRPS Hanford Prime Contracts.](https://reader033.fdocuments.us/reader033/viewer/2022050602/5fa9da571921174cbf26aec8/html5/thumbnails/28.jpg)
10
Hanford Subcontracts, First Quarter, FY2017
$0
$100
$200
$300
$400
$500
$600
$700
$800
Total Small Local WA
$720
$451 $445
$494
$626
$391
$238
$284
FY15 FY16
Hanford Subcontract Spending in Previous Fiscal Years
$ in
mill
ion
s
$ in
mill
ion
s
$-
$50
$100
$150
$200
$250
Total Small Local WA
$215
$106
$152
$138
0
FY17, First Quarter
Hanford Site’s Future
![Page 29: Benton and Franklin Counties - TRIDEC · •Treated 2.1 billion gallons of groundwater, removed 90 tons of ... BNI Washington River Protection Solutions WRPS Hanford Prime Contracts.](https://reader033.fdocuments.us/reader033/viewer/2022050602/5fa9da571921174cbf26aec8/html5/thumbnails/29.jpg)
11
Community Impact
• Supporting advanced education programs
Welding program at CBC
Donation of technology building to WSU
Internships
• Donating time, resources
Combined Federal Campaign
Feds Feed Families
Habitat for Humanity
• Support and leadership to local agencies including
United Way
Junior Achievement
TRIDEC
Boys & Girls Club
Reading Foundation
![Page 30: Benton and Franklin Counties - TRIDEC · •Treated 2.1 billion gallons of groundwater, removed 90 tons of ... BNI Washington River Protection Solutions WRPS Hanford Prime Contracts.](https://reader033.fdocuments.us/reader033/viewer/2022050602/5fa9da571921174cbf26aec8/html5/thumbnails/30.jpg)
12
Future footprint
Current footprint
Plutonium Finishing Plant
![Page 31: Benton and Franklin Counties - TRIDEC · •Treated 2.1 billion gallons of groundwater, removed 90 tons of ... BNI Washington River Protection Solutions WRPS Hanford Prime Contracts.](https://reader033.fdocuments.us/reader033/viewer/2022050602/5fa9da571921174cbf26aec8/html5/thumbnails/31.jpg)
13
Tank Retrievals
![Page 32: Benton and Franklin Counties - TRIDEC · •Treated 2.1 billion gallons of groundwater, removed 90 tons of ... BNI Washington River Protection Solutions WRPS Hanford Prime Contracts.](https://reader033.fdocuments.us/reader033/viewer/2022050602/5fa9da571921174cbf26aec8/html5/thumbnails/32.jpg)
14
Visit www.Hanford.gov
to learn about
• News on Hanford Cleanup
• Hanford Advisory Board
• Opportunities to comment on decisions
• Public events & cleanup tours
Follow us on Facebook & Twitter
• @HanfordSite & @RiverProtection
• www.facebook.com/riverprotection
• www.facebook.com/hanfordsite
Find Out More
![Page 33: Benton and Franklin Counties - TRIDEC · •Treated 2.1 billion gallons of groundwater, removed 90 tons of ... BNI Washington River Protection Solutions WRPS Hanford Prime Contracts.](https://reader033.fdocuments.us/reader033/viewer/2022050602/5fa9da571921174cbf26aec8/html5/thumbnails/33.jpg)
Roger Snyder, Site Office Manager1 February, 2017 TRIDEC Economic Outlook
![Page 34: Benton and Franklin Counties - TRIDEC · •Treated 2.1 billion gallons of groundwater, removed 90 tons of ... BNI Washington River Protection Solutions WRPS Hanford Prime Contracts.](https://reader033.fdocuments.us/reader033/viewer/2022050602/5fa9da571921174cbf26aec8/html5/thumbnails/34.jpg)
• Hanford Site• HAMMER
• Waste Treatment Plant• Tank Waste
• PNNL
Three Offices Three Missions
![Page 35: Benton and Franklin Counties - TRIDEC · •Treated 2.1 billion gallons of groundwater, removed 90 tons of ... BNI Washington River Protection Solutions WRPS Hanford Prime Contracts.](https://reader033.fdocuments.us/reader033/viewer/2022050602/5fa9da571921174cbf26aec8/html5/thumbnails/35.jpg)
![Page 36: Benton and Franklin Counties - TRIDEC · •Treated 2.1 billion gallons of groundwater, removed 90 tons of ... BNI Washington River Protection Solutions WRPS Hanford Prime Contracts.](https://reader033.fdocuments.us/reader033/viewer/2022050602/5fa9da571921174cbf26aec8/html5/thumbnails/36.jpg)
Grid
Remediation
Climate
Nonproliferation
PNNL leverages a strong science base
to provide national leadership
![Page 37: Benton and Franklin Counties - TRIDEC · •Treated 2.1 billion gallons of groundwater, removed 90 tons of ... BNI Washington River Protection Solutions WRPS Hanford Prime Contracts.](https://reader033.fdocuments.us/reader033/viewer/2022050602/5fa9da571921174cbf26aec8/html5/thumbnails/37.jpg)
FY16 At A Glance
• 4,400 scientists, engineers
and non-technical staff
• $920.4M in R&D
expenditures
• 104 U.S. & foreign patents
granted
• 2 FLC Awards, 2 R&D 100
• 1,058 peer-reviewed
publications
![Page 38: Benton and Franklin Counties - TRIDEC · •Treated 2.1 billion gallons of groundwater, removed 90 tons of ... BNI Washington River Protection Solutions WRPS Hanford Prime Contracts.](https://reader033.fdocuments.us/reader033/viewer/2022050602/5fa9da571921174cbf26aec8/html5/thumbnails/38.jpg)
PNNL Across the Region
![Page 39: Benton and Franklin Counties - TRIDEC · •Treated 2.1 billion gallons of groundwater, removed 90 tons of ... BNI Washington River Protection Solutions WRPS Hanford Prime Contracts.](https://reader033.fdocuments.us/reader033/viewer/2022050602/5fa9da571921174cbf26aec8/html5/thumbnails/39.jpg)
Partnering to increase impact
Building strategic academic
alliances, especially with
UW and WSU
Strengthening PNNL’s presence
in–and raising the visibility of–the
Northwest region
Working with DOE and industry to
move technology to market
State investments enable new
opportunities for collaboration
![Page 40: Benton and Franklin Counties - TRIDEC · •Treated 2.1 billion gallons of groundwater, removed 90 tons of ... BNI Washington River Protection Solutions WRPS Hanford Prime Contracts.](https://reader033.fdocuments.us/reader033/viewer/2022050602/5fa9da571921174cbf26aec8/html5/thumbnails/40.jpg)
Using our capabilities to enable
sustainable hydroelectricity
Partnering with BPA and the
Army Corps of Engineers to study
fish behavior and survivability for
next-generation turbine design
![Page 41: Benton and Franklin Counties - TRIDEC · •Treated 2.1 billion gallons of groundwater, removed 90 tons of ... BNI Washington River Protection Solutions WRPS Hanford Prime Contracts.](https://reader033.fdocuments.us/reader033/viewer/2022050602/5fa9da571921174cbf26aec8/html5/thumbnails/41.jpg)
Increasing Awareness and External Engagement
• To better inform and engage community stakeholders regarding PNNL, what action or events would you find the most impactful?
A. Community Open House
B. More Community Lecture Series Events
C. Increased Social Media Presence and Updates
D. Science and Technology Mission Seminars
9
![Page 42: Benton and Franklin Counties - TRIDEC · •Treated 2.1 billion gallons of groundwater, removed 90 tons of ... BNI Washington River Protection Solutions WRPS Hanford Prime Contracts.](https://reader033.fdocuments.us/reader033/viewer/2022050602/5fa9da571921174cbf26aec8/html5/thumbnails/42.jpg)
Furnishing Facilities of the Future
![Page 43: Benton and Franklin Counties - TRIDEC · •Treated 2.1 billion gallons of groundwater, removed 90 tons of ... BNI Washington River Protection Solutions WRPS Hanford Prime Contracts.](https://reader033.fdocuments.us/reader033/viewer/2022050602/5fa9da571921174cbf26aec8/html5/thumbnails/43.jpg)
Pacific Northwest Site Office
We provide support for world leading science conducted by PNNL