Bell Work: Reminder – your FSA Writing will be this Wednesday, March 2 nd. Verify (again) your...
-
Upload
everett-washington -
Category
Documents
-
view
212 -
download
0
description
Transcript of Bell Work: Reminder – your FSA Writing will be this Wednesday, March 2 nd. Verify (again) your...
![Page 1: Bell Work: Reminder – your FSA Writing will be this Wednesday, March 2 nd. Verify (again) your computer…](https://reader036.fdocuments.us/reader036/viewer/2022090107/5a4d1bd97f8b9ab0599dbd6d/html5/thumbnails/1.jpg)
Bell Work: Reminder – your FSA Writing will be this Wednesday, March 2nd. Verify (again) your computer lab. assignment posted on the bulletin board. You are to report to the testing room first thing on Wednesday.Agenda: • The Tragedy of Romeo and Juliet
• Finish reading Act II, Scenes 1-6 p. 207-226 of the play (if needed)
• Complete Act II Reading Guides: Romeo’s Busy Day and After Reading Questions (including Writing Prompt)
• Watch Act II of the play (DVD) • Introduce Love Sonnet Activity (See Smart Board on Desktop)• Act II Quiz on Friday, March 4th
English I HonorsFebruary 29, 2016
![Page 2: Bell Work: Reminder – your FSA Writing will be this Wednesday, March 2 nd. Verify (again) your computer…](https://reader036.fdocuments.us/reader036/viewer/2022090107/5a4d1bd97f8b9ab0599dbd6d/html5/thumbnails/2.jpg)
Bell Work: Reminder – your FSA Writing will be this Wednesday, March 2nd. Verify (again) your computer lab. assignment posted on the bulletin board. You are to report to the testing room first thing on Wednesday (tomorrow!)Agenda: • Literary Analysis (Research Paper): The Tragedy of Romeo and Juliet
• You should have the intro. and at least the first 2 body paragraphs now• Add 2 or more body paragraphs that support your thesis statement• Draft your conclusion• Verify all parenthetical citations• Check conventions• Reminder: Rough Draft is due by end of period to turnitin.com• Reminder: FSA Writing Assessment next week on Wed., March 2nd.
See posted test room list on Grades Bulletin Board.
English I HonorsMarch 1, 2016
Network down – lesson plans from Friday, February 26 replaced
today’s for Periods 1B, 2B, 3B, and 4B ONLY
Act II Quiz on Thursday, March 3rd
![Page 3: Bell Work: Reminder – your FSA Writing will be this Wednesday, March 2 nd. Verify (again) your computer…](https://reader036.fdocuments.us/reader036/viewer/2022090107/5a4d1bd97f8b9ab0599dbd6d/html5/thumbnails/3.jpg)
Bell work: FSA Writing TODAY!Third Period ONLY – Gather in groups from Monday
Agenda:• Report to designated computer lab. test room first thing in the morning.
• Do NOT report to your regular 1A class.• Third Period ONLY
• Begin working on Love Sonnet Activity
English I HonorsMarch 2, 2016
![Page 4: Bell Work: Reminder – your FSA Writing will be this Wednesday, March 2 nd. Verify (again) your computer…](https://reader036.fdocuments.us/reader036/viewer/2022090107/5a4d1bd97f8b9ab0599dbd6d/html5/thumbnails/4.jpg)
Bell work: Turn in Act II Reading Guides: Romeo’s Busy Day and After Reading Questions (including Writing Prompt) from Tuesday
Agenda: • The Tragedy of Romeo and Juliet
• Finish watching Act II of the play (if needed)• Take Act II Quiz• Begin/continue working on Love Sonnet Activity (in
designated groups)• Presentation due date will be determined by the end of the period
English I HonorsMarch 3, 2016
![Page 5: Bell Work: Reminder – your FSA Writing will be this Wednesday, March 2 nd. Verify (again) your computer…](https://reader036.fdocuments.us/reader036/viewer/2022090107/5a4d1bd97f8b9ab0599dbd6d/html5/thumbnails/5.jpg)
Bell work: Turn in Act II Reading Guides: Romeo’s Busy Day and After Reading Questions (including Writing Prompt) from Monday
Agenda: • The Tragedy of Romeo and Juliet
• Finish watching Act II of the play (if needed)• Take Act II Quiz• Begin/continue working on Love Sonnet Activity (in
designated groups)• Presentation due date will be determined by the end of the period
English I HonorsMarch 4, 2016