Behzisti Amphitheatre Interior Design

4
16 Behzisti Amphitheatre Interior Design Mashhad, Iran PROJECT DETAILS: Type: Cultural Location: 250 Shohada St., Mashhad, Iran. Client: Iranian Healthcare Organization Areas: Ceiling Height: 4 meters Total area: 189 square meters Program: Amphitheatre salon, Scene, Audio Control Room, Entrance, Emergency Exit, VIP Entrance, Salon Storage Design/Build start: May 2009 Construction start: June 2009 Inauguration start: October 10, 2009 Estimated cost: 37000$ Cost at completion: 37700$ Estimated schedule: 5 months Time at completion: 5 months and 10 days PROJECT CREDITS: Designers: Project Architect: Babak Manouchehri, Eng., P. Ar. Structural Engineer: Majid Tayyarani Toosi, Eng., P. Eng. Mechanical/Plumbing: Alireza Fakour, Eng., P. Eng. Electrical: Reza Moridasadi, Eng., P. Eng. Project Manager: Babak Manouchehri, Eng., P. Ar. General Contractor: Banaei and Partners Group Paneling Consultant: Iran KNAUF Consulting Group Architectural Supervisor: Babak Manouchehri, Eng., P. Ar. Structural Supervisor: Majid Tayyarani Toosi, Eng., P. Eng. Mechanical/Electrical/Plumbing Supervisor: Alireza Fakour, Eng., P. Eng. PROJECT SPECIFICATIONS: Structural System: Steel structural frame Floor System: Reinforced composite floor system Interior Partitioning: KNAUF paneling system Suspended Ceilings: KNAUF paneling system

Transcript of Behzisti Amphitheatre Interior Design

Page 1: Behzisti Amphitheatre Interior Design

16

Behzisti Amphitheatre Interior Design Mashhad, Iran

PROJECT DETAILS:

Type: Cultural

Location: 250 Shohada St., Mashhad, Iran.

Client: Iranian Healthcare Organization

Areas:

Ceiling Height: 4 meters

Total area: 189 square meters

Program:

Amphitheatre salon, Scene, Audio

Control Room, Entrance, Emergency Exit, VIP Entrance, Salon Storage

Design/Build start: May 2009

Construction start: June 2009

Inauguration start: October 10, 2009

Estimated cost: 37000$

Cost at completion: 37700$

Estimated schedule: 5 months

Time at completion: 5 months and 10 days

PROJECT CREDITS:

Designers:

Project Architect: Babak Manouchehri, Eng., P. Ar.

Structural Engineer: Majid Tayyarani Toosi, Eng., P. Eng.

Mechanical/Plumbing: Alireza Fakour, Eng., P. Eng.

Electrical: Reza Moridasadi, Eng., P. Eng.

Project Manager: Babak Manouchehri, Eng., P. Ar.

General Contractor: Banaei and Partners Group

Paneling Consultant: Iran KNAUF Consulting Group

Architectural Supervisor: Babak Manouchehri, Eng., P. Ar.

Structural Supervisor: Majid Tayyarani Toosi, Eng., P. Eng.

Mechanical/Electrical/Plumbing Supervisor: Alireza Fakour, Eng., P. Eng.

PROJECT SPECIFICATIONS:

Structural System: Steel structural frame Floor System: Reinforced composite floor system Interior Partitioning: KNAUF paneling system Suspended Ceilings: KNAUF paneling system

Page 2: Behzisti Amphitheatre Interior Design

17

Internal sections and elevations

Page 3: Behzisti Amphitheatre Interior Design

18

Internal elevations construction process

Page 4: Behzisti Amphitheatre Interior Design

19

Knauf partition construction process

The designed Knauf suspended ceiling

(Curves, shapes, and lighting)