BEE’s response to the queries received on the RFP for Maintenance of existing Web portal & Mobile App, Implementation of QR Code and Designing of new portal(Last Date of submitting the proposal to BEE has been extended by a period of 3 weeks i.e. 7 th January, 2021) Table 1: Consolidated Reply S.No. Name of the Agency Pre-bid queries BEE’s response 1 Datamatics Point wise queries addressed in Table 2 2 Panamax Infotech Limited 1. We request the authority to count combined or any one partner's [in case of consortium] Microsoft developer license. 2. We request the authority to count combined or any one partner [in case of consortium] the experience. 3. We request the authority to allow the combined qualification of the Lead bidder and consortium partner [In case of consortium]. 4. Is there any exemption for MSME bidders in EMD payment, according to GFR 2017. 5. Is there any exemption for MSME bidders in Bid processing fee payment, according to GFR 2017 Point no. 1, 2 &3 may be accepted.EMD and Bid processing fee shall be exempted for the MSMEs. 3 DCG Data-Core Systems India Pvt. Ltd. 3. Pre-Eligibility Criteria: Point no. 1 Existing Clause: v) The lead partner should satisfy all the other pre- qualification criteria mentioned in the RfP. Query: Requesting for change as below: “The lead Partner or 1. The request in Point no. 1 is accepted.

Transcript of BEE’s response to the queries received on the RFP for … · 2020. 12. 17. · BEE’s response...

  • BEE’s response to the queries received on the RFP for “Maintenance of existing Web

    portal & Mobile App, Implementation of QR Code and Designing of new portal”

    (Last Date of submitting the proposal to BEE has been extended by a period of 3 weeks i.e.

    7th

    January, 2021)

    Table 1: Consolidated Reply

    S.No. Name of the Agency Pre-bid queries BEE’s response

    1 Datamatics Point wise queries addressed in Table 2

    2 Panamax Infotech Limited 1. We request the authority to count combined or

    any one partner's [in

    case of consortium]

    Microsoft developer

    license.

    2. We request the authority to count combined or

    any one partner [in case

    of consortium] the

    experience.

    3. We request the authority to allow the combined

    qualification of the Lead

    bidder and consortium

    partner [In case of

    consortium].

    4. Is there any exemption for MSME bidders in

    EMD payment,

    according to GFR 2017.

    5. Is there any exemption for MSME bidders in

    Bid processing fee

    payment, according to

    GFR 2017

    Point no. 1, 2 &3 may

    be accepted.EMD and

    Bid processing fee shall

    be exempted for the

    MSMEs.

    3 DCG Data-Core Systems

    India Pvt. Ltd.

    3. Pre-Eligibility Criteria:

    Point no. 1

    Existing Clause: v) The

    lead partner should satisfy

    all the other pre-

    qualification criteria

    mentioned in the RfP.

    Query:

    Requesting for change as

    below:

    “The lead Partner or

    1. The request in Point no. 1 is

    accepted.

  • Consortium member

    credentials can be used for

    Prequalification.”

    Point-2

    Existing Clause:

    In support of point 2 or 3

    above, the

    bidder/consortium should

    submit copies of the

    respective contract(s)/work

    order(s) of worth more than

    1.0 crore each duly attested

    by Notary Public along

    with the documentary

    evidence of satisfactory

    execution of each such

    contract. For the purpose of

    evidence of satisfactory

    completion, notarized

    copies of any one of the

    following may be provided

    (indicating the contract

    number and scope of work):

    Query:

    Requesting for change:

    “ Contact value of 20Lac to

    be complied by any of the

    consortium member”

    Point-3

    Requesting for extension of

    submission date by 2

    weeks.

    General Query:

    All the prequalification can

    be complied by any of the

    consortium partner.

    2. Not acceptable

    3. Extension of 3 weeks in the

    earlier timelines

    is granted. Last

    date of

    submitting the

    bids is 7th

    January, 2021

    4 NexusLink Services India

    Pvt Ltd

    1. “Implementation of QR code in a

    leading organization

    preferably in

    Government sector

    during the last 5

    1. Global experience

    regarding the

    implementation

    of QR code may

    be accepted.

  • years” Is it

    mandatory to have

    Indian government

    or would you allow

    it for foreign

    organization

    experience?

    2. As you have asked for “(i)ISO

    9001:2008 or higher

    (For Quality

    Management

    System) or ISO

    27001:2013 or

    higher (Information

    security

    Management

    System) and (ii)

    CMM Level 3 or

    higher” We do have

    ISO 9001:2015

    which we issued

    recently so will you

    please consider this?

    3. Is it compulsory to provide onsite

    Developer? And if

    Yes then How many

    developers do you

    require?

    4. We would like to know the process of

    generation of serial

    number or may be

    identify serial

    number.

    5. We would be needing XML

    format in which you

    want QR code for

    2. It shall also be considered.

    3. Yes, it is mandatory.

    Minimum 3 onsite

    developers shall be

    deputed.

    4. The process of generation would be

    communicated once

    the contract is

    awarded. This may

    be proposed by the

    bidder while

    submitting the

    proposal.

    5. The format would be provided to the

    successful bidder at

    the time of

    initiation of project.

  • serial number. So

    will you provide

    this?

    6. We would need different

    manufactures and

    parts serial number to

    identification process,

    so will you provide

    this?

    6. Same as reply to query no. 5 above.

    5 Aadish Technologies and

    Softwares

    We request you to pls

    confirm if Start-up and

    MSME companies are

    allowed to participate in the

    same.

    We would like to highlight

    that we are a start-up and

    team of professional who

    have worked on various

    government projects and

    delivered successfully.

    Yes, MSME companies

    are allowed to

    participate.

    6 Planetecom Solutions Point wise queries addressed in Table 3

    7 RV Solutions Pvt. Ltd. 1. Clause no. 3(i) given

    on page no. 6 as

    "The prime bidder and

    co-parties of

    consortium/joint venture

    should have experience in

    successfull completion of

    IT software application

    development, mobile

    application

    development/deployment,

    implementation of QR

    code in a leading

    organisation preferably in

    government sector during

    the last 5 years ending

    on 31st March, 2020".

    Request by the Bidder:

    As per this clause, both

    the prime bidder as well

    as the co-party should

    have complete relevant

    experience. However, we

    1. Point no. 1 may be accepted.

  • feel that consortium

    should be allowed for

    joint experience as well

    or the statement should

    be changed to "the prime

    bidder and co-parties

    should have combined

    relevant experience" as

    allowed for combined

    average annual turnover

    as mentioned in point

    3(ii) on the same page.

    2. Clause no. 3(v) given

    on page no. 7 as "The

    lead partner should

    satisfy all the other pre-

    qualification criteria

    mentioned in the RFP."

    Please clarify what states

    "other" in this statement.

    2. The lead partner should meet all

    the requirements

    except those

    requirements

    which have been

    given relaxation

    for joint

    venture/consortiu

    m

    Table 2: Reply to queries from Datamatics

    No. Text from RFP Query BEE's Response

    1 Maintenance of

    existing S&L

    web portal &

    Mobile

    Applications

    Kindly elaborate

    more on

    Maintenance of

    mobile.

    Mobile Application and Wep portal shall be in

    sync with each other. Under maintainence part,

    any technical issue related to Web portal and

    Mobile app, Devlopment pertaining to a

    particular equipment, Updations/ any change

    pertaining to general process flow would be

    covered.

    2 Maintenance of

    existing S&L

    web portal &

    Mobile

    Applications

    Kindly share

    technology used

    for existing

    mobile

    app(native/hybrid

    )

    Technology use for Mobile is native.

    3 Maintenance of

    existing S&L

    web portal &

    Mobile

    Applications

    Kindly share list

    of supporting

    devices/ios for

    existing mobile

    app, whether

    same app can be

    used for

    tablet/iPad

    Mobile App is available in Android and iOS,

    Similar App can be used for tablet and ipad.

  • 4 Maintenance of

    existing S&L

    web portal &

    Mobile

    Applications

    Kindly confirm

    whether there is

    any

    communication/i

    ntegration

    between mobile

    app & S&L web

    portal

    All the API are integrated with S&L web portal.

    5 Task 2:

    Implementation

    of QR code on

    star labelled

    appliances

    Considering the

    same is there any

    development

    expected in

    existing Mobile

    application

    related to QR

    Code?

    Yes

    6 Transformation

    of the existing

    application in

    Hindi language.

    There should be

    an option for

    selecting

    language

    English/Hindi.

    Whether any

    multilingual

    support/develop

    ment is required

    at mobile

    application

    Yes

    7 Maintenance of

    existing S&L

    web portal &

    Mobile

    Applications

    Kindly share the

    list of open

    issue/bugs of

    existing mobile

    application

    Data synchronisation with regards to web portal

    lags sometime which need to be addressed.

    8 Maintenance of

    existing S&L

    web portal &

    Mobile

    Applications

    Kindly share the

    number users

    active logged in

    and accessing

    mobile app

    simultaneously?

    Average active users for mobile app are 200.

    9 Technology of

    the current

    systems

    What is the

    existing

    technology in

    which the current

    system is

    developed?

    Kindly provide

    IT landscape?

    Any preferance

    with respect to

    the Future

    system? We

    believe the

    current system is

    Current system is developed in ASP.net and

    MVC.

  • developed on Dot

    Net core?

    10 Business

    Intelligence/

    Reporting

    As you need to

    include Business

    Intelligence/Repo

    rting as a part of

    future solution?

    Do you have any

    preferance of tool

    for the

    development of

    reports Or vendor

    is open to choose

    any

    platform?How

    many number of

    users will access

    the reports?

    Vendor is open to choose the platform subject

    to its compatibility with S&L web portal and

    manufacturers portal.

    Approximate number of users can be 10.

    11 SLA Can you please

    provide the

    number of tickets

    logged in a

    month based on

    priority(

    P1/P2/P3)? Is

    there any SLA

    followed for

    current support

    and Maintenance

    activities?

    Ticket raising provision doesn't exist In present

    system however, it needs to be developed and

    integrated in the portal .

    12 Appliances Can you briefly

    explain, What do

    you expect from

    the QR

    mechanism

    functionality for

    the available

    appliances? How

    many Appliances

    are currently

    there? Are you

    looking for QR

    code mechanism

    for both

    mandatory and

    voluntarily

    Appliances?

    QR code would be required for the purpose of

    label verification and same will be affixed on

    star labeled products along with star label to

    begin with and may be incorporated in label at a

    later point in time.

    The QR code is to be set up for all mandatory

    appliances during the course of work order

    awarded. Presently, the no. of mandatory

    appliaces is 10, however, the count is likely to

    increase in next 1-2 years.

  • 13 Financial

    Proposal

    Do the vendor

    needs to provide

    a fixed price in

    the Financial

    Proposal which

    includes

    commercials for

    Task1, Task 2

    and Task 3? How

    vendor will

    quantify the

    scope and

    provide a fixed

    price for this

    engagement, as

    the task provided

    in the RFP is at a

    very high level?

    Fixed price is to be quoted only. Tasks have

    been elaborated in detail already.

    14 Team

    composition

    As mentioned in

    the RFP, the

    team

    composition is of

    Project Manager,

    Senior

    Developers,

    Technical

    speciliast,Networ

    k Admin? Do

    you expect

    vendor to provide

    the required

    resources on a

    T&M basis?

    Bidder may decide

    15 Reports/dashbo

    ard

    development,

    Data analytics

    and Big Data

    As with the

    future

    development,

    BEE is looking

    for

    reports/dashboar

    d development,

    Data analytics

    and Big Data,

    What do you

    expect from

    vendor to provide

    wrt to the same?

    The information with regards to the star rating

    applications, approvals, pendency . This shall

    include graphical representations and report

    generation of Technical data related to the

    registered appliances in BEE's data base ,

    ability to undertake basic statistical analysis on

    the registered data base etc.

  • 16 Financial

    proposal

    What do you

    expect from

    Vendor to

    provide in the

    Financial

    proposal? Will

    rate card for the

    applicable

    resources suffice

    the commercial

    proposal

    requirement?

    Price quote for the project.

    17 As the tasks

    mentioned in

    the RFP is at a

    very high level -

    1)Integration of

    new equipment

    on web portal

    which includes

    development of

    administrative /

    technical

    workflow for

    new appliances.

    2)Implementati

    on of QR Code

    3)Development

    of Survey

    Management

    4)Ticketing

    Management

    5)Feedback

    Managment

    6)Ranking

    System

    7)Development

    of a dashboard

    for Standard &

    Labelling

    Programme

    8)Intelligent

    capturing of

    data under

    Standards &

    Labelling

    program

    9)Big Data

    Analytics

    We believe, BEE

    requires

    resources to

    complete the

    development for

    the above

    activities, for

    which the vendor

    is required to

    provide

    resources. Is this

    understanding

    correct?Will

    monthly rate card

    for the resources

    required suffice

    the financial

    commercials

    requirement?

    Kindly refer the payment terms given in RFP

  • 18 Business

    objectives of

    Big Data and

    analytics

    system?

    Please specify

    specific business

    objectives

    expected to be

    addressed from

    the proposed Big

    Data and

    analytics

    system?What is

    expected data

    volume(in

    GB/TBs ) for the

    big data platform

    ?

    This being a new development proposed in the

    RFP, the expected volume for the big data

    platform could not be provided. It would

    depend on the tool being used by the vendor.

    19 Environment

    Preference for

    the Big Data

    plaform

    Please specify

    Environment

    Preference for

    the Big Data

    plaform (On

    Cloud / On

    Premise)?

    On cloud.

    20 Data ingestion

    into the Big

    Data Platform

    Please specify

    the number of

    source systems to

    be considered for

    data ingestion

    into the Big Data

    Platform?

    Expected number is 10

    21 Data analytics What kind of

    data analytics is

    expected –

    descriptive

    /predictive

    /prescriptive?

    Descriptive however, depending on the need, it

    may be predictive based on BEE's requirement.

    22 General Please suggest

    the list of

    locations where

    resources need to

    deploy?

    Front end team at BEE office.

    23 General Please confirm,

    Number of

    sample profiles

    needed for each

    role and also list

    down the list of

    profiles and do

    we need to share

    the sample CV’s

    of resources at

    this stage.

    Yes , for the no. of resources to be deputed by

    the agency.

  • 24 General Please confirm,

    any technical

    details to be

    provided in terms

    of Architecture

    diagrams &

    explanation etc.

    is required during

    bid submission

    stage.

    Depends on the bidder understanding of the

    project.

    25 General What are the

    artefacts required

    to be part of the

    submission/propo

    sal, meaning do

    we need to give

    write-

    ups/methodologi

    es of

    RESOURCE

    Augmentation,

    Resources

    onboarding to

    deployment and

    Project execution

    write-up etc. or

    do we need to

    give only

    RESOURCE

    COST?

    Yes. A presentation may also be asked for by

    BEE for shortlisting .

    26 General We believe that

    the vendor will

    only be

    responsible for

    providing the

    resources with

    the required

    manpower days,

    and all the

    required

    software’s/hardw

    are’s required for

    the development

    will be provided

    by BEE. Is our

    understanding

    correct?

    BEE will not provide any hardware /software

    /logistic support to the vendor.

    However, Deployment enviornment would be

    NIC Cloud, that will be provided by BEE.

    27 General Could it be

    possible to share

    with us the

    Query not clear.

  • estimated amount

    of work to be

    done on Turn-

    key Modality and

    Temporary

    Resources

    Modality?

    28 General Request BEE to

    provide

    indicative

    demand forecast

    for each of the

    personnel

    profiles

    requested per

    region. This

    forecast is purely

    for Bidder

    planning,

    workforce

    availability and

    estimation

    purposes and

    does not construe

    any commitment

    for services

    purchased.

    No such demand forecast can be provided by

    BEE.

    29 Submission

    Format

    As per thye RFP

    document, We

    understand that

    BEE is looking

    for Hard copy

    and socy sub

    mission, Kindly

    calrify do we

    need to submit

    both or any one

    of them.

    Looking at the

    current scenario

    we suugest you

    to kindly accept

    of submission in

    the softcopy/

    Emails.

    The proposal has to be submitted in both Hard

    copy & Soft copy.

  • 30 In support of

    point 2 or 3

    above, the

    bidder/consortiu

    m should

    submit copies

    of the respective

    contract(s)/work

    order(s) of

    worth more than

    1.0 crore each

    duly attested by

    Notary Public

    along with the

    documentary

    evidence of

    satisfactory

    execution of

    each such

    contract. For the

    purpose of

    evidence of

    satisfactory

    completion,

    notarized copies

    of any one of

    the following

    may be

    provided

    (indicating the

    contract number

    and scope of

    work):

    a) Satisfactory

    Completion/Per

    formance

    Report,

    OR

    b) Proof of

    release of

    Performance

    Security after

    completion of

    the contract,

    OR

    c) Proof of

    Settlement/Rele

    ase of Final

    payment against

    the contract,

    Is it mandatory to

    submit a

    notorised PO/

    Completion letter

    or In absence of

    Completion letter

    can we only

    submit PO/

    Contract copy.

    Mandatory

  • OR

    d) Any other

    documentary

    evidence that

    can substantiate

    the satisfactory

    execution of the

    contract(s) cited

    above (like

    agreements,

    Memorandum

    of

    understanding,

    payment

    vouchers etc.)

    31 Project details When do you

    expect the

    contract award

    and project start

    date?

    Likely date of Start of Project: 19th January,

    2021.

    32 What is the

    current team size

    supporting

    application

    stack/technology

    stack as

    described?

    This information may be provided during the

    Knowledge Transfer phase.

    33 Are there any

    existing vendors

    supporting

    current

    application

    stack/technology

    stack services? If

    so, what are the

    common issues

    or areas of

    improvement

    where the new

  • vendors can

    improve upon?

    How many

    vendors are?

    34 Can we get the

    exact list of skills

    along with Job

    Description also

    let us know the

    resource

    experience in

    terms of

    experience

    needed by Bank

    of India?

    No

    35 Stage 3:

    Presentation/De

    mo

    Kindly clarify the

    expected date of

    the presentation

    after the bid

    submisison.

    Will be conveyed

    36 Performance

    Security Format

    Kindly clarify,

    Format for

    Performance

    Security to be

    submitted once

    the contract is

    being awarded,

    Hope we bidders

    do not need to

    submit this at

    bidding stage.

    Kindly note that EMD submitted by the selected

    bidder during submission of bids shall be

    returned after submission of performance

    security only.

    Table 3: Reply to queries from Planetecom Solutions

    S.N

    o.

    RF

    P

    Pag

    e

    No.

    RFP

    Clause

    Name

    & No.

    RFP Clause Bidder’s

    Query/Suggestion/Re

    marks

    BEE's Response

    1 6 3. Pre-

    Eligibili

    ty

    Criteria

    ii) The prime

    bidder and co-

    parties of

    consortium/joi

    nt venture

    should have a

    combined

    minimum

    average annual

    turnover of Rs.

    Please reduce the

    average annual

    turnover of Rs. 20

    crores to 3 crores in

    the financial years

    2017-18, 2018-19 and

    2019-20.

    Not acceptable

  • 20 crores in

    the financial

    years 2017-18,

    2018-19 and

    2019-20.

    2 7 3. Pre-

    Eligibili

    ty

    Criteria

    4. In support

    of point 2 or 3

    above, the

    bidder/consorti

    um should

    submit copies

    of the

    respective

    contract(s)/wor

    k order(s) of

    worth more

    than 1.0 crore

    each duly

    attested by

    Notary Public

    along with the

    documentary

    evidence of

    satisfactory

    execution of

    each such

    contract.

    Please remove the

    value of work order

    because it is specific

    requirement.

    Not acceptable

    3 7 3. Pre-

    Eligibili

    ty

    Criteria

    5. Notarized

    copy of valid

    certificate of

    registration of

    service tax of

    the bidder, or

    of each of the

    partners (in the

    case of

    consortium/joi

    nt venture), is

    to be

    submitted

    along with the

    Technical Bid.

    Please amend this

    clause - Service Tax is

    not applicable now,

    GST should be

    acceptable.

    Accepted

    4 Additional Please share current

    website Technology

    details

    Current system is

    developed in ASP.net and

    MVC.