Beaufort-Sector1-Charrette-FinalPresentation

66

description

This is the original version of the final presentation, given March 28, 2011 at City Hall Council Chambers.

Transcript of Beaufort-Sector1-Charrette-FinalPresentation

Page 1: Beaufort-Sector1-Charrette-FinalPresentation
Page 2: Beaufort-Sector1-Charrette-FinalPresentation
Page 3: Beaufort-Sector1-Charrette-FinalPresentation
Page 4: Beaufort-Sector1-Charrette-FinalPresentation
Page 5: Beaufort-Sector1-Charrette-FinalPresentation
Page 6: Beaufort-Sector1-Charrette-FinalPresentation
Page 7: Beaufort-Sector1-Charrette-FinalPresentation
Page 8: Beaufort-Sector1-Charrette-FinalPresentation
Page 9: Beaufort-Sector1-Charrette-FinalPresentation
Page 10: Beaufort-Sector1-Charrette-FinalPresentation
Page 11: Beaufort-Sector1-Charrette-FinalPresentation
Page 12: Beaufort-Sector1-Charrette-FinalPresentation
Page 13: Beaufort-Sector1-Charrette-FinalPresentation
Page 14: Beaufort-Sector1-Charrette-FinalPresentation

Downtown & Marina Plan

Page 15: Beaufort-Sector1-Charrette-FinalPresentation

Spot Improvements to Enhance the Pedestrian Experience

Page 16: Beaufort-Sector1-Charrette-FinalPresentation

Spot Building Improvements to Add Color and Interest

Page 17: Beaufort-Sector1-Charrette-FinalPresentation

Conceptual Marina Area Plan

Page 18: Beaufort-Sector1-Charrette-FinalPresentation

Proposed View of the Future Redevelopment of the Marina

Page 19: Beaufort-Sector1-Charrette-FinalPresentation

View Looking West Along Bay Street with a Terminating Vista

Page 20: Beaufort-Sector1-Charrette-FinalPresentation

Proposed Parking Deck and Liner Buildings

Page 21: Beaufort-Sector1-Charrette-FinalPresentation

Liner Buildings Around the Parking Deck on Craven Street

Page 22: Beaufort-Sector1-Charrette-FinalPresentation

Parking Deck Liner Buildings Along Craven Street

Page 23: Beaufort-Sector1-Charrette-FinalPresentation

Parking Deck Liner Buildings Along Port Republic Street

Page 24: Beaufort-Sector1-Charrette-FinalPresentation

Proposed Infill Along Port Republic Street

Page 25: Beaufort-Sector1-Charrette-FinalPresentation

Conceptual Redevelopment of the Post Office Block

Page 26: Beaufort-Sector1-Charrette-FinalPresentation

Waterfront Park Extension Boardwalk

Page 27: Beaufort-Sector1-Charrette-FinalPresentation

Proposed Boardwalk Along Bay Street at Bladen Street

Page 28: Beaufort-Sector1-Charrette-FinalPresentation

Waterfront Plan

Page 29: Beaufort-Sector1-Charrette-FinalPresentation

Whitehall Plan

Page 30: Beaufort-Sector1-Charrette-FinalPresentation

Conceptual Plan of Whitehall

Page 31: Beaufort-Sector1-Charrette-FinalPresentation

Mixed Use Infill Carteret St

Page 32: Beaufort-Sector1-Charrette-FinalPresentation

Façade Improvement for the Von Harten Building

Page 33: Beaufort-Sector1-Charrette-FinalPresentation

City Hall photo

Page 34: Beaufort-Sector1-Charrette-FinalPresentation

USCB Plan

Page 35: Beaufort-Sector1-Charrette-FinalPresentation

Conceptual Build-out of the USC-Beaufort Campus

Page 36: Beaufort-Sector1-Charrette-FinalPresentation

View of Bellamy Curve Looking Southwest

Page 37: Beaufort-Sector1-Charrette-FinalPresentation

Small Increment Student Housing in Mansion House Buildings

Page 38: Beaufort-Sector1-Charrette-FinalPresentation

Cuthbert Street Plans

Page 39: Beaufort-Sector1-Charrette-FinalPresentation

Conceptual Artist-led Neighborhood in Higgonsonville

Page 40: Beaufort-Sector1-Charrette-FinalPresentation

Shared Studio/Gallery Space in Artist’s Cluster

Page 41: Beaufort-Sector1-Charrette-FinalPresentation

National Street Infill

Page 42: Beaufort-Sector1-Charrette-FinalPresentation

Conceptual Bungalow Court in Pigeon Point & Higgonsonville

Page 43: Beaufort-Sector1-Charrette-FinalPresentation

Ribaut Road, Piggly Wiggly, and Boundary Street Plans

Page 44: Beaufort-Sector1-Charrette-FinalPresentation

Conceptual Piggly Wiggly Store Anchoring a Redeveloped Center

Page 45: Beaufort-Sector1-Charrette-FinalPresentation

Bladen Street Infill

Page 46: Beaufort-Sector1-Charrette-FinalPresentation

Conceptual Senior Housing and Infill at Bladen and Bay

Page 47: Beaufort-Sector1-Charrette-FinalPresentation

The Old Jail District

Page 48: Beaufort-Sector1-Charrette-FinalPresentation

Infill Development around the Old Jail

Page 49: Beaufort-Sector1-Charrette-FinalPresentation

Existing Urban Fabric

Page 50: Beaufort-Sector1-Charrette-FinalPresentation

Existing Urban Fabric

Page 51: Beaufort-Sector1-Charrette-FinalPresentation

Phase 1 Infill and Redevelopment (1-10 Years)

Page 52: Beaufort-Sector1-Charrette-FinalPresentation

New Infill and Redevelopment (11-30 Years)

Page 53: Beaufort-Sector1-Charrette-FinalPresentation

Full Build-Out with Green Infrastructure

Page 54: Beaufort-Sector1-Charrette-FinalPresentation

Green Infrastructure

Page 55: Beaufort-Sector1-Charrette-FinalPresentation

Existing Urban Fabric

Page 56: Beaufort-Sector1-Charrette-FinalPresentation

Full Build-Out (30 Year Plan)

Page 57: Beaufort-Sector1-Charrette-FinalPresentation

Regional Greenway System

Page 58: Beaufort-Sector1-Charrette-FinalPresentation

Regional Water Taxi System

Page 59: Beaufort-Sector1-Charrette-FinalPresentation

Regional Rail-Trail

Page 60: Beaufort-Sector1-Charrette-FinalPresentation

Regional Transit System

Page 61: Beaufort-Sector1-Charrette-FinalPresentation

Pedestrian and Bicycle Circulation Plan

Page 62: Beaufort-Sector1-Charrette-FinalPresentation

Pedestrian Intensity Analysis

Page 63: Beaufort-Sector1-Charrette-FinalPresentation

Proposed Regulating Plan

Page 64: Beaufort-Sector1-Charrette-FinalPresentation

Typical Transect/Form-Based Code Calibration

Page 65: Beaufort-Sector1-Charrette-FinalPresentation

Existing Zoning to Form Based Coding

Page 66: Beaufort-Sector1-Charrette-FinalPresentation

Next Steps

Refine the Plans and Drawings Focus on implementation, timelines, and

responsibility Show where public intervention is

necessary and where the market can handle things

Adopt the Form-based Code with our recommended Calibrations

Advocate, Implement, Assist, and Construct