Béatrice Couturier & Malorie CLERMONT Local coordination - Grand Lyon & Hespul RENAISSANCE LYON WP...

8
Béatrice Couturier & Malorie CLERMONT Local coordination - Grand Lyon & Hespul RENAISSANCE LYON WP Progress and Plans WP 0.2: National Management

Transcript of Béatrice Couturier & Malorie CLERMONT Local coordination - Grand Lyon & Hespul RENAISSANCE LYON WP...

Page 1: Béatrice Couturier & Malorie CLERMONT Local coordination - Grand Lyon & Hespul RENAISSANCE LYON WP Progress and Plans WP 0.2: National Management.

Béatrice Couturier & Malorie CLERMONTLocal coordination - Grand Lyon & Hespul

RENAISSANCE LYONWP Progress and Plans

WP 0.2: National Management

Page 2: Béatrice Couturier & Malorie CLERMONT Local coordination - Grand Lyon & Hespul RENAISSANCE LYON WP Progress and Plans WP 0.2: National Management.

RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework programme

RENAISSANCE - LYON -FRANCE

2

WP 1: Research, Technological and Innovation DevelopmentWP 1,1: finishedWP 1,3: technical and juridical assistance on heating systemsWP 1,4: study on the impacts of the Concerto programme in social housingWP 1,5: Local action plan: questionnaires and booklet

WP 2: Monitoring and AnalysisWP 2,1: impact of the PV systems on the electrical distribution networks WP 2,2: detailed monitoring and lab monitoringWP 2,3: exchange with Spanish partners

WP 3: Demonstration

WP 4: Dissemination and Promotion

WP 5: TrainingWP 5,1 & 5,2: organisation of the 1st training sessions for workers

WP 0.2: National Management

Page 3: Béatrice Couturier & Malorie CLERMONT Local coordination - Grand Lyon & Hespul RENAISSANCE LYON WP Progress and Plans WP 0.2: National Management.

RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework programme

RENAISSANCE - LYON -FRANCE

3

WP 0.2: National ManagementState of progress year 3: 6 last

monthsThematic/transversal meetings :

- WP 1.5: work on the 1st questionnaires for inhabitants (step 2)

: work on the “Welcome and orientation booklet”: advices for a “green behaviour”

- WP 4 : dissemination protocol: updating and follow-up : “Welcome and orientation booklet”: addition of Concerto

information (2 pages)

- WP 5: preparation of the training sessions for on-site workers (May/June 2009)

Page 4: Béatrice Couturier & Malorie CLERMONT Local coordination - Grand Lyon & Hespul RENAISSANCE LYON WP Progress and Plans WP 0.2: National Management.

RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework programme

RENAISSANCE - LYON -FRANCE

4

- CSG 11/12/2008- WP 1.5: conclusions step 1- WP 5: training sessions

- Delays in demonstration site / Concerto contract

- WP 4: dissemination protocol

- CSG 27/03/2008

- WP 5: training sessions- WP 1.5: step 2

- Inspection visits of the construction site: blocks A, B, C- 3rd Progress Report finished- Redaction of the document to ask for a prolongation of the Renaissance contract: drafted in Lyon

WP 0.2: National ManagementState of progress year 3: 6 last

months

Page 5: Béatrice Couturier & Malorie CLERMONT Local coordination - Grand Lyon & Hespul RENAISSANCE LYON WP Progress and Plans WP 0.2: National Management.

RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework programme

RENAISSANCE - LYON -FRANCE

5

WP 0.2: National ManagementAnalysis of progress

-2 CSG meetings since the last PSG (Oct. 2008): with the objective of 4/year

In time

- 3rd annual progress report: some difficulties to be in time

For the 4th and successive reporting process, it is necessary to work on improving this process to finalise it in time

- Delays of construction impact on others WP such as WP2 and WP1.5 (WP1.4), WP4, WP5

Page 6: Béatrice Couturier & Malorie CLERMONT Local coordination - Grand Lyon & Hespul RENAISSANCE LYON WP Progress and Plans WP 0.2: National Management.

RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework programme

RENAISSANCE - LYON -FRANCE

6

WP 0.2: National ManagementPlans for the next 6 months

- Organisation of 2 local meetings (CSG) at a minimum (ie: in June and September)

- Regional Site Visit of ConcertoPlus in Ajaccio (June 2009) with French and Swiss Concerto partners

- Next PSG in Zaragoza (to be determined)

- 4th Annual Progress Report …

Page 7: Béatrice Couturier & Malorie CLERMONT Local coordination - Grand Lyon & Hespul RENAISSANCE LYON WP Progress and Plans WP 0.2: National Management.

RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework programme

RENAISSANCE - LYON -FRANCE

7

WP 0.2: National Management

WP 1: Research, Technological and Innovation Development

WP 1,3: ESCoWP 1,4: study on the impacts of the Concerto programme in social housing WP 1,5: to finish step 2, to begin step 3

WP 2: Monitoring and AnalysisWP 2,1: monitoring of PV systemsWP 2,2: detailed monitoring and lab monitoringWP 2,3: exchange with Spanish partners and ConcertoPlus team

WP 3: DemonstrationBlock A: Arrival of the 1st inhabitants (60 dwellings) –September 2009

WP 4: Dissemination and PromotionFollow up and up dating the Dissemination strategy

WP 5: TrainingWP 5,2: training sessions on outside insulation and ventilation (air tightness)

Overview : Plans for the next 6 months

Page 8: Béatrice Couturier & Malorie CLERMONT Local coordination - Grand Lyon & Hespul RENAISSANCE LYON WP Progress and Plans WP 0.2: National Management.

RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework programme

RENAISSANCE - LYON -FRANCE

Contacts

8

Béatrice [email protected]

Malorie [email protected]

ENERTECH