Béatrice Couturier & Malorie CLERMONTLocal coordination - Grand Lyon & Hespul
RENAISSANCE LYONWP Progress and Plans
WP 0.2: National Management
RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework programme
RENAISSANCE - LYON -FRANCE
2
WP 1: Research, Technological and Innovation DevelopmentWP 1,1: finishedWP 1,3: technical and juridical assistance on heating systemsWP 1,4: study on the impacts of the Concerto programme in social housingWP 1,5: Local action plan: questionnaires and booklet
WP 2: Monitoring and AnalysisWP 2,1: impact of the PV systems on the electrical distribution networks WP 2,2: detailed monitoring and lab monitoringWP 2,3: exchange with Spanish partners
WP 3: Demonstration
WP 4: Dissemination and Promotion
WP 5: TrainingWP 5,1 & 5,2: organisation of the 1st training sessions for workers
WP 0.2: National Management
RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework programme
RENAISSANCE - LYON -FRANCE
3
WP 0.2: National ManagementState of progress year 3: 6 last
monthsThematic/transversal meetings :
- WP 1.5: work on the 1st questionnaires for inhabitants (step 2)
: work on the “Welcome and orientation booklet”: advices for a “green behaviour”
- WP 4 : dissemination protocol: updating and follow-up : “Welcome and orientation booklet”: addition of Concerto
information (2 pages)
- WP 5: preparation of the training sessions for on-site workers (May/June 2009)
RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework programme
RENAISSANCE - LYON -FRANCE
4
- CSG 11/12/2008- WP 1.5: conclusions step 1- WP 5: training sessions
- Delays in demonstration site / Concerto contract
- WP 4: dissemination protocol
- CSG 27/03/2008
- WP 5: training sessions- WP 1.5: step 2
- Inspection visits of the construction site: blocks A, B, C- 3rd Progress Report finished- Redaction of the document to ask for a prolongation of the Renaissance contract: drafted in Lyon
WP 0.2: National ManagementState of progress year 3: 6 last
months
RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework programme
RENAISSANCE - LYON -FRANCE
5
WP 0.2: National ManagementAnalysis of progress
-2 CSG meetings since the last PSG (Oct. 2008): with the objective of 4/year
In time
- 3rd annual progress report: some difficulties to be in time
For the 4th and successive reporting process, it is necessary to work on improving this process to finalise it in time
- Delays of construction impact on others WP such as WP2 and WP1.5 (WP1.4), WP4, WP5
RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework programme
RENAISSANCE - LYON -FRANCE
6
WP 0.2: National ManagementPlans for the next 6 months
- Organisation of 2 local meetings (CSG) at a minimum (ie: in June and September)
- Regional Site Visit of ConcertoPlus in Ajaccio (June 2009) with French and Swiss Concerto partners
- Next PSG in Zaragoza (to be determined)
- 4th Annual Progress Report …
RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework programme
RENAISSANCE - LYON -FRANCE
7
WP 0.2: National Management
WP 1: Research, Technological and Innovation Development
WP 1,3: ESCoWP 1,4: study on the impacts of the Concerto programme in social housing WP 1,5: to finish step 2, to begin step 3
WP 2: Monitoring and AnalysisWP 2,1: monitoring of PV systemsWP 2,2: detailed monitoring and lab monitoringWP 2,3: exchange with Spanish partners and ConcertoPlus team
WP 3: DemonstrationBlock A: Arrival of the 1st inhabitants (60 dwellings) –September 2009
WP 4: Dissemination and PromotionFollow up and up dating the Dissemination strategy
WP 5: TrainingWP 5,2: training sessions on outside insulation and ventilation (air tightness)
Overview : Plans for the next 6 months
RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework programme
RENAISSANCE - LYON -FRANCE