Beach Haven Drainage and Sewer Improvement Project
Escambia County Public Works Engineering Division
Beach Haven Public Meeting – June 4, 2015
Emerald Coast Utilities Authority
Jehle-halstead, inc. Civil Engineering & Surveying
Meeting Agenda • Introductions
• Background
• Project Phasing
• Southwest Greenway Extension
• Project Schedule
• Q&A
Introductions • Escambia County
– Commissioner Underhill, District 2, 595-4920 – Joy D. Blackmon, P.E. County Engineer, Public Works Dept Director – Terri Berry, Project Coordinator, 595-3421 – Chris Curb, Stormwater Engineering Manager, 595-3419 – Brent Wipf, Community & Environment, Program Manager, 595-3445
• ECUA – John Seymour, P.E. Manager of Engineer Projects, 969-6643 – Tim Haag, Director of Government Affairs, 969-3304
• Jehle-halstead – Glenn Halstead, P.E., Engineer of Record, 994-9503 – Don Jehle, P.E., Chief Executive Officer, 994-9503 – Don Richmond, Quality Assurance Manager, 994-9503
Background • Master Plan
– Drainage and Stormwater Management • Developed by Jehle-Halstead, Inc due to problems with
flooding and roadway maintenance • Conveyance System, Flood Control, and Water Quality
– Sanitary Sewer Service • Area is primarily served by septic tanks • Joined with Escambia County on project to add sanitary
sewer collection system. – Roadway Improvements
• Roadway reconstruction and resurfacing • Curb and gutter; primary for Northeast Phase • Shallow roadside shoulder swales where practical
– Southwest Greenway Extension
Northeast Phase 1 Location
Northeast Phase 2 Location
Southwest Greenway Extension
Photos
BARTOW AVENUE AFTER RE-CONSTRUCTED
Funding • National Fish & Wildlife Foundation (NFWF) Grant • Florida Dept. of Environmental Protection (FDEP) 319 Grant • Emerald Coast Utilities Authority (ECUA) Funds • Local Option Sales Tax (LOST) • Gulf Coast Ecosystem Restoration Council grant pending • Community Redevelopment Agency (CRA) -50% match
available for individual sewer connections
• Beach Haven NE Estimated Cost Phase I = $ 10.1 Million • Estimated Beach Haven NE Cost Phase II = $ 7.8 Million • Southwest Greenway Extension = $ 255 Thousand
Project Schedule
• Permits – Applied for FDEP and ACOE Permits April 2015
• Design – 90% Construction Plans May 2015, Phase 1 – 100% Construction Plans August 2015
• Construction – Solicit Bids September 2015 – Construction Start January 2016
• Beach Haven NE Phase 2 expected in 2020 pending funding
Future Project Phases • Beach Haven Project will be constructed in Phases
Northeast Phase
Northwest Phase
South Phase