  • 26 November 2009 Valve Body # 1030416, 1030417, 1030418, 1030419 1

    BD Engine Brake, Inc. Plant Address: Unit A10, 33733 King Rd, Abbotsford, BC, Canada V2S 7M9

    U.S. Shipping Address: 88-446 Harrison St, Sumas, WA 98295 U.S. Mailing Address: P.O. Box 231, Sumas, WA 98295 Phone: 604-853-6096 Fax: 604-853-8749 Internet: www.bd-power.com

    BD VALVE BODY For 1996-2004 Dodge 5.9L 12V/24V Cummins Trucks - - I n s t a l l a t i o n I n s t r u c t i o n s - -

    1030416 1996-1998 Dodge 12V 47RE

    1030417 1998½-1999 Dodge 24V 47RE

    1030418 2000-2002 Dodge 24V 47RE

    1030419 2003-2004 Dodge 24V 47RE/48RE

    PLEASE READ ALL INSTRUCTIONS BEFORE INSTALLATION

  • 26 November 2009 Valve Body # 1030416, 1030417, 1030418, 1030419 2

    BD Engine Brake, Inc. Plant Address: Unit A10, 33733 King Rd, Abbotsford, BC, Canada V2S 7M9

    U.S. Shipping Address: 88-446 Harrison St, Sumas, WA 98295 U.S. Mailing Address: P.O. Box 231, Sumas, WA 98295 Phone: 604-853-6096 Fax: 604-853-8749 Internet: www.bd-power.com

    Tools Required • Inch Pound Torque Wrench • 3/8” or 1/2" drive socket sets including 7/16” & 1/2” sockets • #25 Torx Bit • Combination Wrench Set including 7/16” & 3/4” • High quality pressure gauge (0-300psi) • Voltmeter

    Additional Parts Required (Not included) • Mopar ATF+4 • 1 Bottle of Red Lube Guard (recommended)

    Installation Notes All Diesel Rams should be tested prior to engine or transmission performance tuning. Check transmission oil level prior to all work. Pressure testing will produce test results that can help to determine the ability of the transmission to prevent the clutch surfaces from slipping. Slippage will result in premature converter and transmission wearing characteristics (soft or severe shifting, high transmission temperature). NOTE - Transmission must be at operating temperature.

    47RE Transmissions Transmission Line Pressure OEM Pressure BD Pressure Test #1 Test #2

    Transmission in DRIVE w/Engine at idle

    55-65psi 90-110psi Transmission in DRIVE w/Convertor

    Locked up @ WOT 110-120psi 170-180psi

    48RE Transmissions Transmission Line Pressure OEM Pressure BD Pressure Test #1 Test #2

    Transmission in DRIVE w/Engine at idle

    55-65psi 90-110psi Transmission in DRIVE w/Convertor

    Locked up @ WOT 110-120psi 170-200psi

  • 26 November 2009 Valve Body # 1030416, 1030417, 1030418, 1030419 3

    BD Engine Brake, Inc. Plant Address: Unit A10, 33733 King Rd, Abbotsford, BC, Canada V2S 7M9

    U.S. Shipping Address: 88-446 Harrison St, Sumas, WA 98295 U.S. Mailing Address: P.O. Box 231, Sumas, WA 98295 Phone: 604-853-6096 Fax: 604-853-8749 Internet: www.bd-power.com

    Transmission Shift Points Transmission Shift Point (RPM) Before After

    2nd – 3rd Shift point (Normal Driving) 2nd – 3rd Shift point (Wide Open Throttle)

    IMPORTANT – IF PRESSURES AND/OR SHIFT POINTS ARE NOT TO SPECS, THE TRANSMISSION MUST BE REPAIRED OR SERVICED BEFORE MODIFICATIONS.

    Pressure Testing 1. Pressure testing is accomplished by inserting a fitting and hose assembly with a

    good quality gauge into the center 1/8” port on the passenger side of the transmission. Leave the gauge attached for testing later.

    2. VERY IMPORTANT – Road test with the pressure gauge in place and record

    pressures and shift point RPM’s BEFORE modifications are carried out to determine the condition of the transmission prior to installing this valve body. Pressure will only be indicated with the transmission in “Drive”.

    3. Secure the vehicle with wheel chocks and place the transmission in Neutral.

    4. Ensure the valve body has not been damaged in shipping and it is the proper part

    number for your vehicle.

    5. Starting at the transmission, remove the kick down lever and spring.

  • 26 November 2009 Valve Body # 1030416, 1030417, 1030418, 1030419 4

    BD Engine Brake, Inc. Plant Address: Unit A10, 33733 King Rd, Abbotsford, BC, Canada V2S 7M9

    U.S. Shipping Address: 88-446 Harrison St, Sumas, WA 98295 U.S. Mailing Address: P.O. Box 231, Sumas, WA 98295 Phone: 604-853-6096 Fax: 604-853-8749 Internet: www.bd-power.com

    6. Rotate the shift lever to the rear

    of the vehicle to place the transmission in the PARK position.

    7. Loosen the shift lever bolt then rotate the lever towards the front of the truck shifting the transmission into 1st / LOW position. This allows for the removal of the Park Rod E-clip without dropping the valve body. Remove shift lever.

    8. Disconnect the wiring connectors

    from the Neutral Safety switch and Valve Body then remove the Neutral Safety switch from the transmission.

    9. Place a large drain pan under the transmission, remove the oil pan, drain the

    transmission oil and remove the filter. 10. Carefully remove the E-clip from the park rod, leaving the park rod in the

    transmission. 11. Remove the 10 valve body bolts, remembering the location of the different bolts.

    The bolts are different lengths and MUST be re-installed in the proper location.

  • 26 November 2009 Valve Body # 1030416, 1030417, 1030418, 1030419 5

    BD Engine Brake, Inc. Plant Address: Unit A10, 33733 King Rd, Abbotsford, BC, Canada V2S 7M9

    U.S. Shipping Address: 88-446 Harrison St, Sumas, WA 98295 U.S. Mailing Address: P.O. Box 231, Sumas, WA 98295 Phone: 604-853-6096 Fax: 604-853-8749 Internet: www.bd-power.com

    12. When lowering the valve body, gently work it around so that the park rod lever is left in the transmission and ensure that the electrical plug is not damaged in the removal process.

    13. CAUTION - As you lower the valve

    body, watch for the accumulator piston and spring falling out. Which is located above the governor solenoid housing.

    14. This is the time to change the 2nd gear band strut to the heavy duty one and install

    the additional 2nd gear servo spring we supply. First loosen the band adjusting screw lock nut with a 3/4” wrench, and then unscrew the adjuster until the stock strut can be removed.

    15. For the next step of the instructions you will need a 6” C Clamp. This 6” C clamp is available from Autozone (#QRCC6) or from Schucks / O’Reilly’s (#648641).

    The cost on this part is roughly $10.

    16. Using a 6” ‘C’ Clamp and a 1 5/16” socket (or 32mm), depress servo piston guide into bore of the transmission. This is a critical step and damage could ruin the

    transmission.

    DO NOT LET ANYTHING SCORE THE BORE OR THE SHAFT.

  • 26 November 2009 Valve Body # 1030416, 1030417, 1030418, 1030419 6

    BD Engine Brake, Inc. Plant Address: Unit A10, 33733 King Rd, Abbotsford, BC, Canada V2S 7M9

    U.S. Shipping Address: 88-446 Harrison St, Sumas, WA 98295 U.S. Mailing Address: P.O. Box 231, Sumas, WA 98295 Phone: 604-853-6096 Fax: 604-853-8749 Internet: www.bd-power.com

    17. Remove retaining clip. DO NOT LOSE.

    18. Loosen C clamp to allow servo piston guide to be removed from bore. Remove clamp, servo piston guide and spring.

    19. Add newly supplied spring to back of servo piston guide, along with the original.

  • 26 November 2009 Valve Body # 1030416, 1030417, 1030418, 1030419 7

    BD Engine Brake, Inc. Plant Address: Unit A10, 33733 King Rd, Abbotsford, BC, Canada V2S 7M9

    U.S. Shipping Address: 88-446 Harrison St, Sumas, WA 98295 U.S. Mailing Address: P.O. Box 231, Sumas, WA 98295 Phone: 604-853-6096 Fax: 604-853-8749 Internet: www.bd-power.com

    20. Re-install servo piston guide into bore with both springs. Hold the servo piston guide in place while slowly

    tightening the C clamp.

    Tighten C clamp very slowly up until the servo piston guide ring touches

    the bore taper.

    Help servo piston guide ring into bore with a small blunt screw driver. DO

    NOT DAMAGE SERVO PISTON GUIDE RING.

    If servo piston guide ring binds or

    catches retaining ring groove lightly tap the servo piston guide to release

    it.

    21. Once servo piston guide is depressed far enough you then can install the

    retaining ring. Once installed you can remove the C clamp.

  • 26 November 2009 Valve Body # 1030416, 1030417, 1030418, 1030419 8

    BD Engine Brake, Inc. Plant Address: Unit A10, 33733 King Rd, Abbotsford, BC, Canada V2S 7M9

    U.S. Shipping Address: 88-446 Harrison St, Sumas, WA 98295 U.S. Mailing Address: P.O. Box 231, Sumas, WA 98295 Phone: 604-853-6096 Fax: 604-853-8749 Internet: www.bd-power.com

    Stock Band Strut in place New BD Band Strut in place

    22. Install the new BD strut with tapered side down, towards the pan, and center in the

    guides. Torque the band adjustment to 72 lbs-in., then back out 2 1/4 turns and tighten lock nut. The measurement for the air gap between the band lever and servo piston is 5/16”.

    23. From the old valve body, remove the

    solenoid /wiring harness assembly. Also remove the governor solenoid & pressure transducer. (NOTE – it is recommended that a new gov. solenoid & pressure transducer be installed at this time.

    VERY IMPORTANT Install the supplied 150 ohm ½ watt resistor into the red wire of the valve body wire harness assembly. SEE ILLUSTRATIONS. This will prevent the computer from setting a governor volts too high P1763 code. *Slide the supplied heat shrink tube onto the wire before crimping the connections.*

  • 26 November 2009 Valve Body # 1030416, 1030417, 1030418, 1030419 9

    BD Engine Brake, Inc. Plant Address: Unit A10, 33733 King Rd, Abbotsford, BC, Canada V2S 7M9

    U.S. Shipping Address: 88-446 Harrison St, Sumas, WA 98295 U.S. Mailing Address: P.O. Box 231, Sumas, WA 98295 Phone: 604-853-6096 Fax: 604-853-8749 Internet: www.bd-power.com

    Be sure to solder your crimp connections.

    Then apply heat to secure the shrink tube over the resistor.

    Once completed your valve body wiring harness assembly should have the resistor firmly soldered into place along with a heat shrink to help protect the connection from the elements. FINISHED ILLUSTRATION SHOWN

  • 26 November 2009 Valve Body # 1030416, 1030417, 1030418, 1030419 10

    BD Engine Brake, Inc. Plant Address: Unit A10, 33733 King Rd, Abbotsford, BC, Canada V2S 7M9

    U.S. Shipping Address: 88-446 Harrison St, Sumas, WA 98295 U.S. Mailing Address: P.O. Box 231, Sumas, WA 98295 Phone: 604-853-6096 Fax: 604-853-8749 Internet: www.bd-power.com

    VERY IMPORTANT A modification needs to be made to the pressure transducer switch (the black plastic style switch) for the 2000-2007 model year trucks, before it is installed on the valve body. To prevent over pressure damage to the transducer, it will need to have a .040 pressure relief hole drilled. SEE ILLUSTRATION.

  • 26 November 2009 Valve Body # 1030416, 1030417, 1030418, 1030419 11

    BD Engine Brake, Inc. Plant Address: Unit A10, 33733 King Rd, Abbotsford, BC, Canada V2S 7M9

    U.S. Shipping Address: 88-446 Harrison St, Sumas, WA 98295 U.S. Mailing Address: P.O. Box 231, Sumas, WA 98295 Phone: 604-853-6096 Fax: 604-853-8749 Internet: www.bd-power.com

    24. IMPORTANT - Before installing the BD Valve Body, lubricate the manual-shifting shaft and the O-ring on the electrical connector that fits into the transmission case. Rotate the shift lever all the way forward to place the valve body into 1st / Low gear position so that the park rod and E-clip can be attached later.

    25. Place the accumulator piston and spring into the BD Valve Body. If you cannot balance these parts on the valve body, hold them in place with a supporting tool or wire until the Valve Body is installed.

    26. Once the valve body is in position, insert

    the park rod into the manual shift lever and hold the valve body in place with a couple of bolts.

  • 26 November 2009 Valve Body # 1030416, 1030417, 1030

    Plant Address: Unit A10, 33733 King Rd, Abbotsford, BC, Canada V2S 7M9U.S. Shipping Address: 88-446 Harrison St, Sumas, WA 98295 U.S. Mailing Address: P.O. Box 231, Sumas, WA 98295

    Phone: 604-853

    27. Install the E-clip on the park rod using the flat, slotted end of the Canadian micro-hockey stick.

    “Hockey Stick” Tool

    28. Install the valve body mounting bolts, ensuring that the varying length bolts are

    installed into the proper positions, and then torque evenly to 10 lbs 29. Install the manual lever on the outside of the transmission and

    movement of the detent shift. There must be 5 distinct positions that are felt from Low (1st) to Park. Leave the transmission in the neutral position and tighten the retaining bolt. Re-install the kick down lever and spring.

    30. Install the neutral safety switch. The reverse lights at the rear of vehicle should

    illuminate when the shift lever is in the reverse position (key on).

    Valve Body # 1030416, 1030417, 1030418, 1030419

    BD Engine Brake, Inc. Plant Address: Unit A10, 33733 King Rd, Abbotsford, BC, Canada V2S 7M9

    446 Harrison St, Sumas, WA 98295 U.S. Mailing Address: P.O. Box 231, Sumas, WA 98295853-6096 Fax: 604-853-8749 Internet: www.bd-power.com

    clip on the park rod using the flat, slotted end of the Canadian

    Install the valve body mounting bolts, ensuring that the varying length bolts are installed into the proper positions, and then torque evenly to 10 lbs

    Install the manual lever on the outside of the transmission and movement of the detent shift. There must be 5 distinct positions that are felt from

    ) to Park. Leave the transmission in the neutral position and tighten the install the kick down lever and spring.

    neutral safety switch. The reverse lights at the rear of vehicle should illuminate when the shift lever is in the reverse position (key on).

    12

    446 Harrison St, Sumas, WA 98295 U.S. Mailing Address: P.O. Box 231, Sumas, WA 98295

    Install the valve body mounting bolts, ensuring that the varying length bolts are installed into the proper positions, and then torque evenly to 10 lbs-ft.

    Install the manual lever on the outside of the transmission and check for full movement of the detent shift. There must be 5 distinct positions that are felt from

    ) to Park. Leave the transmission in the neutral position and tighten the

    neutral safety switch. The reverse lights at the rear of vehicle should

  • 26 November 2009 Valve Body # 1030416, 1030417, 1030418, 1030419 13

    BD Engine Brake, Inc. Plant Address: Unit A10, 33733 King Rd, Abbotsford, BC, Canada V2S 7M9

    U.S. Shipping Address: 88-446 Harrison St, Sumas, WA 98295 U.S. Mailing Address: P.O. Box 231, Sumas, WA 98295 Phone: 604-853-6096 Fax: 604-853-8749 Internet: www.bd-power.com

    31. Install the new supplied filter on the valve body. 32. We suggest that you install a BD HD oil pan, which has extra oil capacity, cooling

    fins, a magnetic drain plug, and adds strength to the transmission case to prevent flexing.

    33. Install the shift linkage to the manual lever on the transmission be sure manual shift

    linkage is adjusted correctly. The kick-down cable can now be attached to the ball socket. Ensure that the wiring harness has some dielectric grease on it and connect it. Ensure not to bend the pins when attaching the plug.

    34. When just the valve body is being replaced, the transmission will need ~8-9 quarts

    of ATF+4. When both the valve body and torque converter are being replaced, ~15-17 quarts are required. IMPORTANT: After 8 quarts have been added, start the engine and shift through all gears, and then check the transmission oil level with the shifter in neutral. Top up and check as required. DO NOT OVERFILL!

    35. After your test drive, check the oil levels again. Air locks are common in this

    transmission. 36. Road test the vehicle to verify pressures and to check for the wide-open shift points

    to ensure that they are correct. These pressures will vary according to the position of the kick down cable adjustment. Engine RPM DOES NOT affect line pressure. CAUTION – PRESSURE SETTINGS THAT ARE TOO HIGH CAN RESULT IN SEVERE SHIFTS, LIMP MODE, or 2ND OR 3RD GEAR STARTS.

  • 26 November 2009 Valve Body # 1030416, 1030417, 1030418, 1030419 14

    BD Engine Brake, Inc. Plant Address: Unit A10, 33733 King Rd, Abbotsford, BC, Canada V2S 7M9

    U.S. Shipping Address: 88-446 Harrison St, Sumas, WA 98295 U.S. Mailing Address: P.O. Box 231, Sumas, WA 98295 Phone: 604-853-6096 Fax: 604-853-8749 Internet: www.bd-power.com

    Kick Down Cable Adjustment The adjustment of the kick down cable is one of the most critical adjustments that affect the operation of the transmission. The BD Performance Valve Body is not stock, therefore the factory specifications for this adjustment are used only as a guide. Your drivability and performance demands will determine your shift points and pressure adjustments. Kick down cable adjustments are for Full Throttle shift points & passing gear only. Light throttle shift points should be adjusted on the valve body throttle valve stop.

    The kick down cable is located underneath the plastic cover as indicated above. The plastic cover is held in place by 2 plastic Phillips head screws. Only light pressure is required to remove them. Do not lose the screws or washers when you remove them.

  • 26 November 2009 Valve Body # 1030416, 1030417, 1030418, 1030419 15

    BD Engine Brake, Inc. Plant Address: Unit A10, 33733 King Rd, Abbotsford, BC, Canada V2S 7M9

    U.S. Shipping Address: 88-446 Harrison St, Sumas, WA 98295 U.S. Mailing Address: P.O. Box 231, Sumas, WA 98295 Phone: 604-853-6096 Fax: 604-853-8749 Internet: www.bd-power.com

    Adjust cable so the kickdown lever is pulled all the way back, to it’s furthest travel, at wide open throttle. Check this with engine off & pushing throttle pedal to floor.

    Adjust the cable forward (towards the radiator), to make the transmission shift earlier. Adjust the cable back to the rear (towards the firewall), to make the transmission shift later.

    Install the plastic cover when complete. Cable should be set midway or with an 1/8” of deflection. Any further adjustment can be made from the starting point.

  • 26 November 2009 Valve Body # 1030416, 1030417, 1030418, 1030419 16

    BD Engine Brake, Inc. Plant Address: Unit A10, 33733 King Rd, Abbotsford, BC, Canada V2S 7M9

    U.S. Shipping Address: 88-446 Harrison St, Sumas, WA 98295 U.S. Mailing Address: P.O. Box 231, Sumas, WA 98295 Phone: 604-853-6096 Fax: 604-853-8749 Internet: www.bd-power.com

    Gear Shift Cable Adjustment – Very Important 48re 2003-2007

    ADJUSTMENTS - GEARSHIFT CABLE THIS MUST BE DONE!!

    Check adjustment by starting the engine in PARK and NEUTRAL. Adjustment is CORRECT if the engine starts

    only in these positions. Adjustment is INCORRECT if the engine starts in one but not both positions. If the engine

    starts in any position other than PARK or NEUTRAL, or if the engine will not start at all, the transmission range

    sensor may be faulty.

    Gearshift Adjustment Procedure

    1. Shift transmission into PARK. 2. Release cable adjuster lock tab (3) (underneath the steering column) to unlock

    cable. 3. Raise vehicle. 4. Disengage the cable eyelet from the transmission manual shift lever. 5. Verify transmission shift lever is in PARK detent by moving lever fully rearward.

    Last rearward detent is PARK position. 6. Verify positive engagement of transmission park lock by attempting to rotate

    propeller shaft. Shaft will not rotate when park lock is engaged. 7. Snap the cable eyelet onto the transmission manual shift lever. 8. Lower vehicle. 9. Lock shift cable by pressing cable adjuster lock tab (3) downward until it snaps into

    place. 10. Check engine starting. Engine should start only in PARK and NEUTRAL.

  • 26 November 2009 Valve Body # 1030416, 1030417, 1030

    Plant Address: Unit A10, 33733 King Rd, Abbotsford, BC, Canada V2S 7M9U.S. Shipping Address: 88-446 Harrison St, Sumas, WA 98295 U.S. Mailing Address: P.O. Box 231, Sumas, WA 98295

    Phone: 604-853

    1 - STEERING COLUMN

    2 - GEARSHIFT CABLE

    3 - GEARSHIFT CABLE LOCK TAB

    4 - BTSI SOLENOID LOCK TAB

    5 - BTSI CONNECTOR

    Valve Body # 1030416, 1030417, 1030418, 1030419

    BD Engine Brake, Inc. Plant Address: Unit A10, 33733 King Rd, Abbotsford, BC, Canada V2S 7M9

    446 Harrison St, Sumas, WA 98295 U.S. Mailing Address: P.O. Box 231, Sumas, WA 98295853-6096 Fax: 604-853-8749 Internet: www.bd-power.com

    GEARSHIFT CABLE LOCK TAB

    BTSI SOLENOID LOCK TAB

    17

    446 Harrison St, Sumas, WA 98295 U.S. Mailing Address: P.O. Box 231, Sumas, WA 98295

  • 26 November 2009 Valve Body # 1030416, 1030417, 1030418, 1030419 18

    BD Engine Brake, Inc. Plant Address: Unit A10, 33733 King Rd, Abbotsford, BC, Canada V2S 7M9

    U.S. Shipping Address: 88-446 Harrison St, Sumas, WA 98295 U.S. Mailing Address: P.O. Box 231, Sumas, WA 98295 Phone: 604-853-6096 Fax: 604-853-8749 Internet: www.bd-power.com

    Questions? If you require assistance with this kit, please call our Transmission Technical Support Line at (800) 887-5030, Monday to Friday from 8:00-4:00pm Pacific Standard Time (PST). As an alternative, you can post a support question on our technical forum, located at http://www.bd-power.com/forum/ .