State-of-the-Art EMS System
Anders Hellkvist, VP Business Development Network Control
©2014 Ventyx, an ABB company | Confidential & Proprietary | 2
Market challenges and needs
ELIA delivery
ELES delivery
Summary
Lots of renewable production
Thermal production decommissioned
Excess production capacity
©2014 Ventyx, an ABB company | Confidential & Proprietary | 3
©2014 Ventyx, an ABB company | Confidential & Proprietary | 4
Dynamic line rating
Unpredictable production
DACF
Operator training DACF PiCTURE TO IN
CLUDE
Network Manager EMS
©2014 Ventyx, an ABB company | Confidential & Proprietary | 5
State-of-the-art EMS system
Enhances functionality
Reduce cost
Meet future evolution requirements
©2014 Ventyx, an ABB company | Confidential & Proprietary | 6
ELIA – Belgium and Germany
ELES – Slovenia
2014 – Elia Group
Implementing a state-of-the-art EMS systemto enhance functionality, reduce cost and meet future evolution requirements
Tomas GunstEMS Project Manager
8
Elia Group in a nutshell | Keys Figures
110 to 380 kV lines & cables 13,400km
30 to 70 kV lines & cables 4,760km
Number of substations 872
Area covered (km2) c.143,000
Direct customers c.130
Residents covered >29 million
Employees (FTE) c.1,800
Regulated Asset Base (RAB) €5,300m
Elia Group
Among the TOP 5 TSOs in Europe
Introduction – Main Drivers
Renewables (Wind, PV, ….) is challenging today's system operation for• ACE and frequency control• Congestion forecasting and localization• Voltage control and localization
9
Mixture of Volatile with Inflexible production a real challenge for Operations
Future needs: ICT technologies
• Automatic corrective control means• On-line system monitoring and calculating static and dynamic phenomena• Increasing amounts of data to handle due to more decentralized generation, new
technologies and more data exchange• Cyber security aspects
Þ Need for up-to-date, reliable and robust ICT tools
10
04/19/2023
Energy Management System: TO BE
Existing systemMultiple databases
Both SCADA and PAS unique and tailor
made
Evolution of functionality is 100% ELIA
driven
Unlimited customisation
New systemStandard product
Broad customer base of ABB: lower
maintenance cost and better client
support
Periodic product releases with new
functionalities (User Group)
Limited customisation is possible with
respect to product evolution (upgrade)
1 only EMS Datawarehouse linked to all
other Elia Databases (Open architecture)
Concept new EMS:
Standard product Fully integrated SCADA + PAS = EMS Data Warehouse Unique system for all Control Centres
Project focus on:
quality: functionality + migrated data reliability: redundancy, SLA, cyber performance: sizing & speed harmonisation and DB efficiency
New system architecture ( / per site)
Keybd
Mouse Vide
o
Serial A
1
2
3
4
5
6
7
8
KB/VDU
WAN
100 Mbps
PUB-LAN-A / B
IS500 WEB SERVERS A/B
Keybd
Mouse Vide
o
Serial A
1
2
3
4
5
6
7
8
KB/VDU
SYSTEM MAINT. CONSOLES
GFEs 212 RTUs
115 RTUs
120 RTUs
Existing systems
IEC 60870-5-104
External User Consoles
hp workstation xw40
00
input auto 1 2piphp 2035
hp workstation xw40
00
input auto 1 2piphp 2035
MCS Shaarbeek . SCADA/EMS System OverviewA: ON-Line System
Material inside the green fields is not
included in the Scope of Supply
Replicated Application Server
SCADA Servers A/B UDW Servers A/B SDB Servers A/BDE Servers A/B
TASE2/ELCOM Servers A/B
Active Directory andDNS Server
UTCE-LAN-A/B
PCU Servers A/B
14
SCADA
NordPAS
DBNEW EMS
Designers
Challenge migration old -> new EMS
SCADA
South
SCADA
DN+Center
Issue data migration
Measures taken
No harmonisation (data, use)
lack of PAS expertise
# substations, # schemes, configuration
designing, rework, updates old//new
standardisation
internalisation of competences
extra resources
Summary: underestimation of work volume
& complexity
To Be – System Architecture
Run time environmentMaintenance environment
Forms
Import
WS500DE400
Picture
files
Graphical Editor
Picture generator
Data loadingAvanti
PDB
Oracle
MDB
Customer’s
data source
SQL scripts
Migration chain: architecture
SCADA
PAS
Import Pre-processing
MigrationDecision
processing Export
EXTRACT
PAS_TRANSLATION
OVERLAP
1st/2nd PATHDEM
IOA
IOA (part 2)SCADA
ImportFileGenerator
ImportFileGenerator
NormalStatus
SystemObjects
AOR
LIMITS
PATTERNS
CALCULATIONS CALCULATIONS
BREAKER_RATINGS
© E
LIA
- 1
7
Architecture (1) Architecture (2)
Summary of main NM advantages for the end users (1)
One centralized db/server <> several independent db/servers
• All users can use the same displays, will see and share the full system acquired, computed or substituted information + notes/tags/..
• Harmonization of DB & business rules becomes a constraint but :
It will improve the quality of database/procedures It will make operators more interchangeable
• A user can work from any console (even remotely), what he will see or can do depends only from its own DB user rights.
• All users will share the same set of historical data & logbook (one common DWH db)
• Backup system for national control center is fully synchronized/consistent with Master system
All functional units (EMS, DWH, ELCOM/TASE2, PCU’s…) are redundant X 4 (Online/standby/synchronized/synchronized)
• robustness & availability increased
PAS, SCADA, DTS functions integrated in the same system (one common database)
• Same GUI tool (WS500) for using these functions• Same process displays (station/flow schemes, …) are
used to support these functions• Database always consistent between SCADA/PAS
(common network model)• No longer ELCOM link in between with risk of failure Test system available (with real time link) to test a
new DB before putting it into production (step included in DB population work flow)
A real Datawarehouse (UDW) with more reporting possibilities and interfaces developements perspectives (rich API’s library)
One replicated SCADA & DWH server + Web server • IS500 SCADA (limited) GUI application available on
intranet (with several functional improvements <> old WCS)
© E
LIA
- 1
8
User interface (1) User interface (2)
Summary of main NM advantages for the end users (2)
Set of std ABB displays (NMTAB) for displaying input and output data with functions such like AGC,PAS,ELCOM/TASE2,Control system,…) very detailed
Navigation in WS500 : Value select feature (display scada or PAS values) Zoom/layers/delcuttering functions are supported Overview window supported in zoom mode Advanced locate feature Dynamic functions keys Usefull Point information window (with up to 5
external keys available for each SCADA/PAS ID) Possible to apply different contexts (time select, DNC
mode, value select mode,..) in separated windows Possible to navigate through intranet WEB pages Possible to call an external application from a WS500
menu Possible to put a BMP/JPG in background of a
WS500 display. Auto filter of E&A lists based on navigation
Modern Look & feel of WS500 (GUI). WS500 is working under windows PC’s : Easier to exchange data with local PC (copy/past, save
file, export, …) Same navigation principles as in standard MDI windows
applications (minimize/maximize/… ) Possible to customize all toolbars/menus for the user Up to 6 24’ screens for an operator Powerfull tool “authority explorer” to manage user
rights for defining allowed operator actions and contents of event & alarms lists :
High granularity of allowed actions in WS500 Thousands of subsystems available (not only 9 zones !)
to define areas of responsabilities Possible to supervise and transfer roles between
operators Possible to define “MUST” roles Grid component “NMTAB” used in all tabular displays
(PAS, SCADA status lists, AGC, Control system, User defined displays….) very user friendly (sorting/filtering/exporting features…)
Cyber security
© E
LIA
- 1
9
SCADA functions (1) SCADA functions (2)
Summary of main NM advantages for the end users (3)
Dynamic Network Coloring function• color equipments in process displays depending on the
current topology/energized state and according to different optional criteria (Node, voltage level, subsystem, island, …coulouring )
Limits management• Up to 5 levels of SCADA limits• Limit manager function can update dynamically SCADA
(& PAS) limit values (according to seasons, time or TM signal)
• Possibility to activate or deactivate the supervision of limits thresholds
Event & alarm processing More possibilities to categorize events/alarms (based
on point class, reason criteria, priorities concepts) and therefore more flexibility to :
to filter/extract them afterwards To define alarm summary lists
Rate of change/gradients limits Mobile alarm function (function sending sms/mails
automatically or manually)
Historical data (trending/time select/post
disturbance review/..)• No limit on historical period (up to 5 years)• Accuracy of 1s (by default) for all
measurands/indications • Play back function supported• Default trending (without need of any engineering) for
for all points available in WS500 display. SX reports • Possibility to define & use XLS reports refreshed with
RT and/or UDW data. Calculation• More flexibility (advanced programming language)
to define calculations (SPL)• User defined online ARTC (Matlab) calculations (based
on UDW or RT data)• Composite objets supported. • Generic interlock rules• Std Equipments statistics counters• Advanced ELIA station global indicators
© E
LIA
- 2
0
SCADA functions (3) SCADA functions (4)
Summary of main NM advantages for the end users (4)
Operator actions• Sequence control supported • Edit tags & symbol operator notes (& notebook?)• Comments events• Define online and share with other users :
Filters to be applied to event/alarm lists Status lists
Possible to send several commands in // on objets related to the same PU
Apply button supported for commands Expiration delay supported for blocking actions Alarm Lists features Possible to color alarm records according to
categories& priorities of events Possible to see/distinguish “partially” acknowledged
alarms Alarm summary lists indicators in tool bars Communication with external partners
TASE2 protocol ssupporting controls/setpoints +
Acquisition• Feed back supervision on set point and incremental
controls• State change Jitter quality flag for indications AGC/ITS :• Fully standard tool <> customized calculations into
old SCADA field proven and more reliable.(TBC)• Set of standard displays very detailed• Design of std AGC function offers a lot of nice user
features, (difficult to be exhaustive) • Prodplan and ITS standard user interfaces (integrated
with WS500) allows the operator to navigate (and overwrite) scheduled data coming from Nxpro & Prores applications
• Full archiving into UDW of all relevant variables involved into AGC regulation mechanism. All these archive data available in trends/sxreports/….
© E
LIA
- 2
1
PAS functions (1) PAS functions (2)
Summary of main NM advantages for the end users (5)
Real time sequence (NAC) : • Event triggered real time sequence• Validity time of output related to each EMS
application BTD : new function to identify suspected bad
measurands SE improvements: • 2 levels of limits for violations (75% & 100%) in line
with SCADA limits. (= project config)• In case of violations, “Orange” and “Red” colors are
presented on 1-L diagramas and in violation output displays
• In output displays, possible to see violations related to each control centers or to full ELIA network
• Beter performances SA improvements: • Possible to define load/unit rescheduling into outage
definition• Possible to define Remedial action schemes• User friendly SA dialog to edit online contingencies
• Automatic “propagation” of contingencies (propagation stops when a breaker is found) in line with new UCTE rules
• In case of violations, “Red” colors are presented in violation output displays
• In output displays, possible to see combined severities related to each control center or to full ELIA network
• Output display exists to show for each monitored equipment the sublist of contingencies that puts this equipement in violation.
• Beter performances SCA improvements: • Possible to simulate unbalanced faults (if data are
provided)• Possible to simulate line faults• Possible to have full post incident electrical state
presented in output display or on 1-L diagram for one specified fault
• Possible to have all bus CC results displayed at the same time on the 1-L diagrams
• Violations are on breakers (and not on buses)
© E
LIA
- 2
2
PAS functions (3) PAS functions (4)
Summary of main NM advantages for the end users (6)
New PAS interlock function : • Possible in real time to apply automatically network
changes to SE solution and compute periodically SA & SCA output based on this new base case.
Study mode : • 2 X 15 for operators on EMS/SCADA servers• 3 X 15 for user profiles like planners• Initialization of a study mode possible from:
LF save case (automatic SE savecases or manaul DPF save cases)
CIM/NSI file NPU database (based on a study date) (rem :
Equipment Outage scheduling function supported) Beter performances DPF : • LF comparison feature (DPF solution <> savecase)• 2 PAS limits (75% & 100%) with orange/red colors
presented in 1_L diagrams and in violation displays in case of violations
Others :• NMTAB displays for all tabular output very user
friendly sort, search, find, export feature, ..(event if some of them need to be simplified for the operator)
• ID of PAS equipments (displayed into= PUTM (40 ch)• EMS Network model extended in Belgium (MT) and
in external countries (FR) to be inline with SCADA DB (= Project config)
© E
LIA
- 2
3
FAST-DTS Maintenance aspects
Summary of main NM advantages for the end users (7)
Possible to update DTS database very easely from RT (no longer need of several weeks of engineering work !)
Closed loop with AGC supported All types of relays can toggle an alarm indication into
SCADA when triggered Dedicated DWH for DTS (to support
trending/reporting,..) Possible to define in DTS MMI what are the variables to
be recorderd by FAST (for trending after the simulation) Some new improvements into the User interface (i.e
library of DTS base cases available in WS500)
Product evoluates due to other customer requests. Same SLA for PAS and for SCADA (support 24 X 7)
New flux schemes
Substation schemes
System Operation: Real time ampacity and forecast ampacity
19 april 202326
Dynamic Line Rating (e.g. Ampacimon) and Dynamic Cable Rating
27
G-FLEX and DLR (Ampacimon)
ELES, Slovenia
©2014 Ventyx, an ABB company | Confidential & Proprietary | 29
Slovenian Transmission System Operator
©2014 Ventyx, an ABB company | Confidential & Proprietary | 30
Old systems was using many platforms, hard to maintain and getting of age
Data transfer from old to new system
Congestion forecast
Simulation and data exchange
Cyber security
New NCC – challenges & concerns
©2014 Ventyx, an ABB company | Confidential & Proprietary | 31
New NCC - solution
©2014 Ventyx, an ABB company | Confidential & Proprietary | 32
RTU(ELES, Others)
UCTEPartners Schedules
ICCP DACF-DEF
The New ELESEMS System
SchedulingSystem
MeteringSystem
PlanningTools
Protective DeviceSimulator
Business Users,External Systems
WeatherData
WAMS
New NCC - solution
©2014 Ventyx, an ABB company | Confidential & Proprietary | 33
RTU
ICCP
LFC
Tertiary
Meter
Weather
Results Input
LFC
AGC
RM
Scheduling Load Forecast
UCTE
Partners
WAMS
SCADA/EMS
(AVANTI)
REAL - TIME
DATA BASE
STUDY
DATA BASE
ESS
Network Analysis
VVCSystemAnalysis
UDW
(ORACLE)
HISTORICAL
DATA
SCHEDULE
DATA
Save
Cases
Sche
dule
s
”Sna
psho
t”
SX-Report
EOS STLF BLF
SCADA/EMS
(AVANTI)
New NCC - Results
©2014 Ventyx, an ABB company | Confidential & Proprietary | 34
One of the most modern SCADA/EMS systems in Europe!
Integral SCADA/EMS system
Powerful data engineering and export/import using CIM
Powerful Congestion forecast (DACF)
Integral Operator Training System (OTS)
Cyber Security implemented when interfacing with other systems
New NCC – benefits