BCM BCM Eastern Inc. —————————' Engineers, Planners and Scientists The Birches, Suite 4 • 2275 Whitehorse-Mercerville Road Trenton, NJ 08619 (609)587-9777 January 19, 1988 Michael Mason United States Environmental Protection Agency Region III 841 Chestnut Building Philadelphia, Pennsylvania 19107 Subject: Dublin TCE Site Work Plan Implementation BCM Project No. 00-5681-01 Dear Michael: This letter serves to notify the United States Environmental Protection Agency (EPA) of the completion of Phase II and the implementation of Phase III of the Dublin TCE site Work Plan. The Work Plan was attached as Exhibit 1 of the Consent Agreement and Order (CAO) between Mr. John H. Thompson and the EPA (EPA Docket No. III-87-22-DC). Phase II of the Work Plan included the installation of treatment systems (or the delivery of bottled water) at selected Dublin Borough, Pennsylvania residences and businesses. Phase III of the Work Plan involves the monitoring of treat- ed and untreated well water at selected residential and business loca- tions. Tables 1 through 4 provide a summary of actions taken as part of Phase II at each of the locations listed in the Work Plan. Actions taken included the installation of twelve point of use treatment systems, eight total system treatment systems, and the evaluation of five existing treatment systems. As indicated by the tables, all Phase II work has been com- pleted with the following exceptions: The treatment system at the Dublin Hardware, 101 North Main Street, has not been evaluated. Dublin Hardware installed their own treatment system and did not allow BCM Eastern Inc. (BCM) to have a treatment system contractor inspect the system. The treatment system at the Boyle residence at 115 North Main Street, has been evaluated. BCM's treatment system subcontractor completed the evaluation and reported that the one-stage total system treatment system presently in place is not adequate. Because 115 North Main Street is a Tier II residence, BCM is authorized to deliver bottled water or install point of use treatment to this residence. However, BCM is not authorized to replace the total system 1—————————— A Member Firm of BCM Engineers Inc. —————————————

Transcript of BCM BCM Eastern Inc. - Records Collections · BCM BCM Eastern Inc. —————————'...

BCM BCM Eastern Inc.—————————' Engineers, Planners and Scientists

The Birches, Suite 4 • 2275 Whitehorse-Mercerville Road • Trenton, NJ 08619 • (609)587-9777

January 19, 1988

Michael MasonUnited States EnvironmentalProtection AgencyRegion III841 Chestnut BuildingPhiladelphia, Pennsylvania 19107

Subject: Dublin TCE SiteWork Plan ImplementationBCM Project No. 00-5681-01

Dear Michael:

This letter serves to notify the United States Environmental ProtectionAgency (EPA) of the completion of Phase II and the implementation ofPhase III of the Dublin TCE site Work Plan. The Work Plan was attachedas Exhibit 1 of the Consent Agreement and Order (CAO) between Mr. John H.Thompson and the EPA (EPA Docket No. III-87-22-DC). Phase II of the WorkPlan included the installation of treatment systems (or the delivery ofbottled water) at selected Dublin Borough, Pennsylvania residences andbusinesses. Phase III of the Work Plan involves the monitoring of treat-ed and untreated well water at selected residential and business loca-tions.

Tables 1 through 4 provide a summary of actions taken as part of Phase IIat each of the locations listed in the Work Plan. Actions taken includedthe installation of twelve point of use treatment systems, eight totalsystem treatment systems, and the evaluation of five existing treatmentsystems. As indicated by the tables, all Phase II work has been com-pleted with the following exceptions:

The treatment system at the Dublin Hardware, 101 North MainStreet, has not been evaluated. Dublin Hardware installedtheir own treatment system and did not allow BCM EasternInc. (BCM) to have a treatment system contractor inspectthe system.

The treatment system at the Boyle residence at 115 NorthMain Street, has been evaluated. BCM's treatment systemsubcontractor completed the evaluation and reported thatthe one-stage total system treatment system presently inplace is not adequate. Because 115 North Main Street is aTier II residence, BCM is authorized to deliver bottledwater or install point of use treatment to this residence.However, BCM is not authorized to replace the total system

1—————————— A Member Firm of BCM Engineers Inc. —————————————

BCMMichael Mason -2- January 19, 1988

treatment system. In addition, it would not be appropriateto install a point of use system while the present systemis in operation and possibly discharging elevated levels ofTCE to the water system. Because of continued difficultyin contacting the resident, this issue has not been re-solved. BCM's recommendation, however, is for the residentto remove the existing treatment system and to utilizeeither bottled water or a point of use system. Additionalefforts will be made to discuss the above with the resident.

A treatment system has not been installed at the Graceresidence, 115 Elephant Road, at the owners request. Mrs.Grace did not allow BCM's treatment system subcontractor toinstall a point of use treatment system. Mrs. Grace wantsto wait until she receives results from the latest round ofsampling before she allows a system to be installed.

Also included in the tables are the dates when treated and/or untreatedwell water was sampled in the first round of the Phase III monitoringprogram. All of the 51 locations listed in the Work Plan were sampledwith the following exceptions:

The Dairy Queen located at the intersection of North MainStreet and Mill Street. The store is closed for the winter.

163 North Main Street because there is no such address.Slaymaker is located at 163 South Main Street.

In addition one location not listed in the Work Plan, 118 Elephant Road,was also sampled. This location was sampled because the well serving 116Elephant Road also serves 118 Elephant Road. 116 Elephant Road is listedin the Work Plan as a Tier II residence. For this reason, a point of usetreatment system was installed at 118 Elephant Road and a sample was col-lected to check the system.

Should you have any questions, please contact me.

Very truly yours ,

Steven F. KempGeologist

SFK/kkcc: B. McCullough, Esquire

S. He! big, BCMA. Robinson, BCMD. Varner, BCM

TABLE 1

TREATMENT SYSTEM INSTALLATION AND SAMPLING SUMMARYTIER I WELLS

DUBLIN TCE SITEDUBLIN, PENNSYLVANIA

Date DateName Address Treatment Installed Sampled

Hansel 116 N. Main St. NT NA 11/30/87

Slaymaker 163 N. Main St. NT1 NA NA

Louis Marks 169 N. Main St. NT NA - 12/1/87

Bunting 170 N. Main St. NT NA 11/30/87

Dublin F1re Co. 194 N. Main St. NT NA 11/30/87

Margaret MUler 113 Elephant Rd. NT NA 12/1/87

Slaymaker 114 Elephant Rd. TS NA2 11/30/87

Merrill Myers 139 Elephant Rd. NT NA 11/30/87

Irma DetweHer 150 Elephant Rd. NT NA 12/1/87

Rush 152 Elephant Rd. NT NA 12/1/87

Dublin Acres, Well 1 Rlcherts Rd. NT NA 12/1/873

Dublin Acres, Well 2 Rlcherts Rd. NT NA 12/21/873

Robert Ott 105 Middle Rd. NT NA 12/1/87

Wood Edge Apts. 126 Middle Rd/. Apt. D2 NT NA 12/21/87

Dairy Queen N. Main St., Mill St. NT NA NA4

Dublin Inn 101 S. Main St. NT NA 12/21/87

Harris 215 Frontier Rd. NT NA 12/1/87

NT No Treatment SystemNA Not Applicable

TS Total System1. Slaymaker 1s at 163 South Main Street. No sample was collected at this address.

There 1s no address of 163 North Main Street.

2. The treatment system was Installed by the owner. The Installation date is not known.

3. Samples were collected from a Dublin Acres Apartment rather than directly from wellNo. 1 and No. 2. According to the Apartment Manager, the sample collected on12/1/87 represents well No. 1 and the sample collected on 12/21/87 represents WellNo. 2.

4. The Dairy Queen is closed for the winter.

Source: BCM Esatern Inc. (BCM Project No. 00-5681-01)

TABLE 2 ,;y/-.-..,' v,?/ t\f ftn. '''U

TREATMENT SYSTEM INSTALLATION AND SAMPLING SUMMARY •**(!!TIER II WELLS

DUBLIN TCE SITEDUBLIN, PENNSYLVANIA

DateName Address Treatment Date Installed Sampled

Dublin Hardware 105 N. Main St. TS In Operation 1 12/1/87

Rhines Gulf 112 N. Main St. POU Installed 10/22/87 12/1/87

Terry Hinsdale 113 N. Main St. BW Regular Delivery 2 12/1/87

Boyle 115 N. Main St. TS In Operation 3 12/1/87

Buchanan 117 N. Main St. POU Installed 12/1/87 12/1/87

Hirst 119 N. Main St. TS In Operation 4 12/1/87

Moyer Auto Body 130 N. Main St. POU Installed 10/22/87 11/30/87

Moyer Home 130 N. Main St. POU Installed 11/27/87 12/1/87

Dublin Garage 139 N. Main St. POU Installed 11/27/87 12/21/87

First Federal Bank 142 N. Main St. POU Installed 10/29/87 11/30/87

Dublin Diner N. Main St. TS Modified 11/16/87 5 11/30/87

Lloyd Myrick 153 N. Main St. POU Installed 10/29/87 11/30/87

Dublin Village Plaza 161 N. Main St. TS Installed 11/24/87 11/30/87

Doylestown Federal 174 N. Main St. BW Regular Delivery 2 11/30/87

Dublin Post Office N. Main St. POU Installed 10/29/87 11/30/87

Jacobs Auto Supply 133 W. Main St. BW Regular Delivery 2 11/30/87

Grace 115 Elephant Rd. NT6 NA 12/1/87

Black 116 Elephant Rd. POU Installed 10/29/87 12/1/87

Labs 118 Elephant Rd. POU Installed 10/29/87 12/1/87

Dudley Sports Office 112 Maple Ave. BW Regular Delivery 2 11/30/87

Drake 118 Maple Ave. TS Installed 10/13/87 12/1/87

Table 2 {continued)

NA Not Applicable

NT No Treatment

BW Bottled Water delivery

POU Point of Use Treatment

TS Total System Treatment

1. Dublin Hardware installed their own treatment system. The owner did not allow BCM'streatment system subcontractor to evaluate the system.

2. Delivery of bottled water will continue uninterrupted.

3. The treatment system at 115 North Main Street has been evaluated. BCM's treatmentsystem subcontractor feels the system is not adequate and recommends that the systembe replaced.

4. The owner has installed a total system treatment unit. BCM's treatment systemsubcontractor has inspected the unit and does not recommend any modifications.

5. The owner has installed a total system treatment unit. BCM's treatment systemsubcontractor inspected the unit and completed modifications as necessary.

6. The owner did not allow BCM's treatment system subcontractor to install a pointuse treatment system.

Source: BCM Eastern Inc. (Project No. 00-5681-01)

TABLE 3

TREATMENT SYSTEM INSTALLATION AND SAMPLING SUMMARYTIER III WELLS

DUBLIN TCE SITEDUBLIN, PENNSYLVANIA

Name

Bishop

Myers

Myers

Moyer Flower Shop(Tenant)

Bucks County Bank

Schnell

Moyer Home

Beauty Shop

Address

128 N. Main St.

124 N. Main St.

126 N. Main St.

138 N. Main St.

145 N. Main St.

149 N. Main St.

146 Elephant Rd.

104 Maple Ave.

Treatment

TS

TS

TS

TS

POU

TS

TS

TS

Date Installed

Modified 11/16/871

Installed 10/26/87

Installed 10/26/87

Installed 9/30/87

Installed 10/29/87

Modified 11/16/871

Installed 9/30/87

Installed 11/23/87

DateSampled

12/1/87

11/30/87

11/30/87

11/30/87

12/1/87

12/1/87

11/30/87

12/1/87

POU Point of Use Treatemnt

TS Total System Treatment

1. System was installed by owner.the system and made modifications

Source: BCM Eastern Inc. (Project No.

BCM' s treatmentas necessary.

00-5681-01)

system, subcontractor has inspected

HR 1*001*50

TABLE 4

TREATMENT SYSTEM INSTALLATION AND SAMPLING SUMMARYTIER IV WELLS

DUBLIN TCE SITEDUBLIN, PENSSYLVANIA

DateName Address Treatment Date Installed Sampled

Whistlewood Apts. 107 N. Main St. TS NA ] 12/22/87

Robert Rufe 122 N. Main St. TS Installed 9/30/87 11/30/87

Emico, Inc. 123 N. Main St. BW Regular Delivery 2 12/1/87

Emico, Inc. 123 N. Main St.q BW Regular Delivery 2 12/1/87

Farm Bureau 104 Mill St. POU Installed 10/22/87 11/30/87

Thompson PlantWell No. 1 120 Mill St. BW Regular Delivery 3 11/30/87

Thompson PlantWell No. 2 120 Mill St. BW Regular Delivery 3 11/30/87

NA Not Applicable

POU Point of Use Treatment

TS Total System Treatment

BW Bottled water will be supplied

1. Owner installed Air Striper. Evaluation of the system is not scheduled.

2. Delivery of bottled water will continue uninterupted.

3. Delivery of bottled water will continue uninterrupted. Treatment alternatives forwell No. 2 are being considered.

Source: BCM Eastern Inc. (project No. 00-5681-01)

BCM BCM Eastern Inc.Engineers, Planners and Scientists

One Plymouth Meeting • Plymouth Meeting, PA 19462 • Phone: (215) 825-3800

November 17, 1987

Michael Mason c/.̂.!v V~". «United States Environmental Gti&A i:.;ku-.-L i..; • .a.-c-.iProtection Agency _ ̂ „_Region III NOV If 1887841 Chestnut BuildingPhiladelphia, Pennsylvania 19107

Subject: Dublin Boro TreatmentSystem Installation SummaryBCM Project No. 00-5681-01

Dear Michael:

This letter provides a summary of work completed in Dublin Boro,Pennsylvania, in response to the Consent Agreement and Order (CAO)entered into between the United States Environmental Protection Agency(EPA) and John H. Thompson (EPA Docket No. Ill - 87-22-DC).

As outlined in the Work Plan which was attached to the CAO as Exhibit I,several residences and businesses in Dublin Boro were to receive partialor total well water treatment systems or bottled water delivery. Theattached tables provide a preliminary summary of work completed to date.As you requested in our November 4, 1987 telephone conversation, thisinformation is being provided to you only for review in advance of ourFriday, November 20, 1987 status meeting. Please keep in mind that thisis preliminary verbal information which has not yet been field verified.

If you have any questions or require additional information, pleasecontact me.

Very truly yours,

Steen F. KempGeologist

SFK/kkcc: B.J. McCullough, Esq.

S.R.' Helbig, BCMA.M. Robinson, BCMD.J. Varner, BCM

A Member Firm of BCM Engineers Inc. -————fl D/ fl i'll CO

TABLE 1

TREATMENT SYSTEM INSTALLATION SUMMARYTIER II WELLS

NOVEMBER 17, 1987

DUBLIN TCE SITEDUBLIN, PENNSYLVANIA

Schedule ofName Address Treatment Installation

Dublin Hardware 105 N. Main St. T.S. In Operation *

Rhines Gulf 112 N. Main St. P.O.U. Installed 10/22/87

Terry Hinsdale 113 N. Main St. B.W. Week of 11/30/87 2

Boyle 115 N. Main St. T.S. In Operation 3

Buchanan 117 N. Main St. P.O.U. Week of 11/16/87

Hirst 119 N. Main St. T.S. In Operation 3

Moyer Auto Body 130 N. Main St. P.O.U. Installed 10/22/87

Moyer Home 130 N. Main St. P.O.U. Week of 11/23/87 "

Dublin Garage 139 N. Main St. P.O.U. Week of 11/23/87

First Federal Bank 142 N. Main St. P.O.U. Installed 10/29/87

Dublin Diner N. Main St. T.S. In Operation 4

Detweiler 153 N. Main St. P.O.U. Installed 10/29/87

Dublin Village Plaza 161 N. Main St. T.S. Week of 11/23/87

Doylestown Federal 174 N. Main St. B.W. Week of 11/30/87 .?

Dublin Post Office N. Main St. P.O.U. Installed 10/29/87

Jacobs Auto Supply 133 W. Main St. B.W. Week of 11/30/87 2

Grace 115 Elephant Rd. P.O.U. Installed 11/23/87

Black 116 Elephant Rd. P.O.U. Installed 10/29/87,

Labs 118 Elephant Rd. P.O.U. Installed 10/29/87"

Dudley Sports Office 112 Maple Ave. B.W. Week of 11/30/87

Drake 118 Maple Ave. T.S. Installed 10/13/87

Table 1 (continued)

B.W. Bottled Water delivery

P.O.U. Point of Use (kitchen tap) Treatment

T.S. Total System Treatment

1. Dublin Hardware installed their own treatment system. The owner did not wantCulligan to evaluate the system.

2. Delivery of bottled water is tentatively scheduled to begin the week of 11/30/87.

3. The owner has installed a total system treatment unit. Culligan will inspect theunit, however, an inspection date has not yet been scheduled.

4. The owner has installed a total system treatment unit. Culligan has evaluated thesystem and feels a few modifications are necessary. Modification work wasscheduled for the week of 10/26/87, however the owner, possibly a new owner,refused entry to the Culligan Technician.

rT

BCMTABLE 2

TREATMENT SYSTEM INSTALLATION SUMMARYTIER III WELLS

NOVEMBER 17, 1987

DUBLIN TCE SITEDUBLIN, PENNSYLVANIA

Schedule ofName Address Treatment Installation

Bishop 128 N. Main St. T.S. Modified 11/87 1

Myers 124 N. Main St. T.S. Installed 10/26/87

Myers 126 N. Main St. T.S. Installed 10/26/87

Mover Flower Shop(Tenant) 138 N. Main St. T.S. Installed 9/30/87

Bucks County Bank 145 N. Main St. P.O.U. Installed 10/29/87

Schnell 149 N. Main St. T.S. Modified 11/87 1

Moyer Home 146 Elephant Rd. T.S. Installed 9/30/87

Beauty Shop 104 Maple Ave. T.S. 11/23/87 2

P.O.U. Point of Use (kitchen tap) Treatment

T.S. Total System Treatment

1. System was installed by owner. Culligan has inspected the system and mademodifications as necessary.

2. The Beauty Shop has an upstairs and downstairs apartment. Culligan has evaluatedwater use and feels a full treatment is necessary. Installation has beenscheduled for 11/23/87.

-

BCM]TABLE 2

TREATMENT SYSTEM INST/iTIER IV WE

NOVEMBER 17,

DUBLIN TCEDUBLIN, PENNS1

Name Address

Whistlewood Apts. 107 N. Main St.

Robert Rufe 122 N. Main St.

Emico, Inc. 123 N. Main St.

Farm Bureau 104 M i l l St.

Thompson PlantWell No. 1 120 M i l l St.

Thompson PlantWell No. 2 120 Mill St.

NA Not Applicable

T.S. Total System Treatment

B.W. Bottled water w i l l be supplied

1. Owner installed Air Striper. Evaluation

•V-̂ .-t. :,-•••'•k;. j -;i

LLATION SUMMARYLLS1987

SITELVANIA

Schedule ofTreatment Installation

T.S. NA 1

T.S. Installed 9/30/87

B.W. Week of 11/30/87

P.O.U. Installed 10/22/87

B.W. Week of 11/30/87

T.S. Week of 11/30/87

f the system is not scheduled.

*

'5;''4i

BCM BCM Eastern Inc. "'""' •_——————' Engineers, Planners and Scientists

One Plymouth Meeting • Plymouth Meeting, PA 19462 • Phone: (215) 825-3800September 11, 1987

Michael MasonUnited States Environmental Protection AgencyRegion III841 Chestnut BuildingPhiladelphia, Pennsylvania 19107

Subject: Completion of Phase I of theDublin Work PlanBCM Project No. 00-5681-01

Dear Michael:

This letter is to inform you of BCM's completion of all Phase I require-ments for the subject project. They are as follows:

- Determination of the accessibility of each available residentand business known to be affected by TCE contamination andrequiring a treatment system or bottled water delivery inDublin, Pennsylvania.

. LA,

- Determination of the preference of the above mentioned resi-dents and businesses for bottled water or kitchen tap &-treatment. /*=*

- Obtain bids from contractors who can provide and installappropriate treatment systems within a specified time table.

- Retain a contractor who will provide bottled water on a ,demand basis. J>

4W.(f

- Prepare a sampling schedule for treatment systems and wells. ^ ^

Work on Phase II requirements has commenced and, at its completion, aletter will be sent to you summarizing the finalized treatment systeminstallations and bottled water delivery programs. Should you have anyquestions regarding this matter please do not hesitate to contact SteveKemp or me at 609-587-9777.

Sincerely,

RJW/kkcc: S. Kemp, BCM

S. Helbig, BCMA. Robinson, BCM

Roller t J. WyattGeologist

A Member Firm of BCM Engineers Inc. r>