BCDP AGENDA ITEMS
AGENDA ITEM 8. CONCEPTUAL DESIGN OFBAGH PUBLIC PARK
AGENDA ITEM 9. PRICED BOQs OF HULLARBRIDGE
-
7/31/2019 BCDP
3/24
PMU-BCDP
AGENDA ITEM 8CONCEPTUAL DESIGN OF BAGH PUBLIC PARK
PROJECT: Construction of Bagh Public Park LOCATION: South of Bypass Road across Mahal River NECESSITY:
Project is included in the indicative list of umbrella contract It is part of Priority I Projects of BCDP It is a recreation park meant for general public but will also attract the
tourists as there is no such type of park existing in Bagh The Govt land for the project is available
PRESENT PROGRESS/UPDATE: The users requirement has been approved by PSC The Conceptual Design has been vetted and cleared by NESPak The Conceptual Design has been cleared by PCC with the
recommendation to provide facilities of keeping local wildlife animals &birds in the park
SALIENT FEATURES OF THE PROJECT: TOTAL AREA OF PLOT 40 KANAL
WALK WAY AREA 4669 SQ M (9 KANAL)
BUILDING AREA 566 SQ M
TERRACES AREA 14500 SQ M (28 KANAL)
-
7/31/2019 BCDP
4/24
PMU-BCDP
FACILITIES Green Areas and Flower Beds Seating Clusters Concrete/Logwood
Gazebo Sitting Shelters
Play Land Jumping Castle
See-Saw Slide Ride on Toy Monkey Rider Swings Children Tunnel
Restaurant/Tuck Shop Public Lavatories Prayer Area Amphitheater Hiking Track/Walk Way Car Parking Police Post Administration Office and Watch/Ward Staff Accommodation
Mesh Wire fencing
CONCEPTUAL DESIGN OFBAGH PUBLIC PARK
-
7/31/2019 BCDP
5/24
PMU-BCDP
SITE OF BAGH PUBLIC PARK
BAGH CITY
CONCEPTUAL DESIGN OFBAGH PUBLIC PARK
-
7/31/2019 BCDP
6/24
PMU-BCDP
PARK LAYOUT
-
7/31/2019 BCDP
7/24PMU-BCDP
RESTAURANT
CONCEPTUAL DESIGN OFBAGH PUBLIC PARK
-
7/31/2019 BCDP
8/24PMU-BCDP
RESTAURANT
CONCEPTUAL DESIGN OFBAGH PUBLIC PARK
-
7/31/2019 BCDP
9/24PMU-BCDP
CONCEPTUAL DESIGN OFBAGH PUBLIC PARK
Administration Office
-
7/31/2019 BCDP
10/24PMU-BCDP
Staff Residence
CONCEPTUAL DESIGN OFBAGH PUBLIC PARK
-
7/31/2019 BCDP
11/24PMU-BCDP
CONCEPTUAL DESIGN OFBAGH PUBLIC PARK
Police Kiosk
-
7/31/2019 BCDP
12/24PMU-BCDP
CONCEPTUAL DESIGN OFBAGH PUBLIC PARK
PublicLavatories
-
7/31/2019 BCDP
13/24PMU-BCDP
Sitting Shelters
and
Gazebo
CONCEPTUAL DESIGN OFBAGH PUBLIC PARK
CONCEPTUAL DESIGN OF
-
7/31/2019 BCDP
14/24PMU-BCDP
CONCEPTUAL DESIGN OFBAGH PUBLIC PARK
RECOMMENDATION
Kind approval of conceptual designof Bagh Public Park is requested.
-
7/31/2019 BCDP
15/24PMU-BCDP
PROJECT: Construction of Girder type RCC Bridge LOCATION: Bagh City Near Hudda Bari on Mahal River. NECESSITY:
Project is included in the indicative list of umbrella contract It is part of Priority I Projects of BCDP The Bridge will connect Bagh city with Hullar area located on the South
and also provide access to the Bagh Public Park Land for the project is available
PRESENT PROGRESS/UPDATE: The Users Requirement, Conceptual Design and Detailed Design have
been approved The BOQs have been agreed for Rs. 371.755 Million after negotiation
between Contractor, Consultant and Employer
SALIENT FEATURES OF THE PROJECT: Length 210 meters Width 32 feet Height 52 feet Structure RCC/Pre Stressed
Footpath 4 feet both sides
AGENDA ITEM 9PRICED BOQs OF HULLAR BRIDGE
-
7/31/2019 BCDP
16/24PMU-BCDP
SUMMARY OF COST
SR. NO. DESCRIPTIONAMOUNT
(Rs. Million)
1 EARTH WORK 23.03
2 CONCRETE SUB STRUCTURE 184.03
3 CONCRETE SUPER STRUCTURE 126.53
4 WATER DIVERSION WORKS (LUMP SUM) 18.00
5 PROVISIONAL SUM (SOLAR LIGHTS) 5.32
6 GENERAL ITEMS (4.15 % TOTAL COST) 14.81
TOTAL PROJECT COST (Rs.) 371.75
PRICED BOQs OF HULLAR BRIDGE
-
7/31/2019 BCDP
17/24PMU-BCDP
RECOMMENDATION
Kind approval of Priced BOQs ofHullar Bridge is requested.
-
7/31/2019 BCDP
18/24PMU-BCDP
SHAMS BRIDGE BAGH
-
7/31/2019 BCDP
19/24PMU-BCDP
SHAMS BRIDGE BAGH
HULLAR BRIDGE BAGH
-
7/31/2019 BCDP
20/24
PMU-BCDP
HULLAR BRIDGE BAGH
-
7/31/2019 BCDP
21/24
PMU-BCDP
HULLAR BRIDGE BAGH-CROSS SECTION
-
7/31/2019 BCDP
22/24
PMU-BCDP
COMPARISON OF HULLAR BRIDGE ANDSHAMS BRIDGE (BAGH)
S/No Data Shams Bridge Hullar Bridge
1. Type RCC Girder RCC Girder
2. Length 173 meter 210 meter
3. Height 38 feet 52 feet
4. Width 23 feet 32 feet
5. No. of Piers 3 4
6. No. of Girders 12 20
7. Date of Contract 2009 2011
8. BOQ Cost 144.89 million 371.75 million
9. Escalation 36.47 million -10. Tax Factor (6%) 10.88 million -
11. Profit Margin Factor (3%) 5.44 million -
12. Total Cost 197.68 million 371.75 million
13. Cost per meter 1.14 million 1.77 million
14. Contractor M/S SKC (local) M/S CXB (Intl.)
-
7/31/2019 BCDP
23/24
PMU-BCDP
COMPARISON OF HULLAR BRIDGE ANDNUMANPURA BRIDGE (BAGH)
S/No Data Hullar Bridge
Numanpura
Bridge
1. Length 210 m 240 m
2. ROW/Width 10.5 m 9.6 m
3. Walkway 4 feet both sides 4 feet one side
4. No. of Span 5 85. Length of Span 42 m 30 m
6. No. of Girders 20 32
7. Height of Girder 2.60 m 2.25 m
8. Width of Girder 1.1/0.75 m 1.0/0.6 m
9. No. of Pier 4 7
10. Dia of Pier 2.0 m 1.5 m
11. Height of Pier 9.4 m 10 m
12. Dia of Pile 1.2 m 1.0 m
13. Height of Pile 28 m 30 m
-