Page 1: BCA Construction Quality Assessment System

 

R4 – 1 Oct 2021   

CONQUAS® 2019

 

 

 

 

 

                    

 

 

 

 

 

 

   

 

 

  BCA Construction Quality Assessment System

CONQUAS® 2019

Page 2: BCA Construction Quality Assessment System

 

 

R4 – 1 Oct 2021   

2

CONQUAS® 2019

 

 

CONQUAS® 

 

 

THE BCA 

CONSTRUCTION QUALITY ASSESSMENT SYSTEM 

 

Copyright @ 2019 by the Building and Construction Authority, Singapore. All rights reserved. No part may be reproduced, in any form or by any means, without permission in writing from the publisher.

While every effort has been made to ensure the accuracy of the information presented in this publication, neither the Authority nor its employees or agents can accept responsibility for any loss or damage incurred in connection with the use of the contents.

 

 

 

 

 

Page 3: BCA Construction Quality Assessment System

 

 

R4 – 1 Oct 2021   

3

CONQUAS® 2019

CONTENTS 

 

1.0  INTRODUCTION....................................................................................................4 

  1.1  Objectives of CONQUAS 

  1.2  Scope of CONQUAS 

  1.3  Derivation of CONQUAS 

  1.4  CONQUAS Assessor 

  

2.0  CONQUAS.............................................................................................................8 

2.1  Components to be assessed 

  2.2  The Weightages 

  2.3  Sampling   

3.0  THE ASSESSMENT................................................................................................11 

  3.1  Assessment Approach 

  3.2  Assessment 

  3.3  Bonus Points 

  3.4  Major Defects 

  3.5  Score Moderation Framework 

3.6  Computation of CONQUAS Score 

3.7  Publication of CONQUAS Scores 

 

 

APPENDICES 

Appendix 1  Quality Standards for Internal Finishes Works...........................................    31 

Appendix 2  Quality Standards for External Works........................................................    42 

Appendix 3  Quality Standards for Materials and Functional Tests...............................    50 

Appendix 4  Defects Grouping Guide for Assessment of Internal Finishes....................    52 

Appendix 5  Building Grouping Guide…………………………………………………………………………   53 

Revision Log  ……………………………………………………………………………………………………………….   54 

 

 

 

 

 

Page 4: BCA Construction Quality Assessment System

 

 

R4 – 1 Oct 2021   

4

CONQUAS® 2019

1.0 INTRODUCTION 

Construction Quality Assessment System (CONQUAS) 2019 is now the tenth edition of the CONQUAS assessment scheme after 30 years of implementation. 

The key changes are as follows: 

(a) A streamlined framework with 3 main building categories (b) Greater emphasis on architectural quality and water seepage issues (c) Introduction  of  factory  checks  for  projects  using  prefabricated  prefinished 

volumetric  construction  (PPVC) methods, which  recognizes  and  encourages good  practices  that  are  both  productive  and  facilitate  high  quality achievements  

1.1  Objectives of CONQUAS 

The Building  and Construction Authority  (BCA) developed  the Construction Quality 

Assessment System (CONQUAS) in conjunction with major public sector agencies and 

various leading industry professional bodies, organizations and firms to measure the 

quality level achieved in a completed project. 

CONQUAS was designed with three objectives: 

(a) To have a standard quality assessment system for construction projects. (b) To make quality assessment objective by: 

‐ measuring constructed works against workmanship standards and specification. 

‐ using  a  sampling  approach  to  suitably  represent  the  whole project. 

(c)  To  enable  quality  assessment  to  be  carried  out  systematically  within 

reasonable cost and time. 

CONQUAS  is an  independent assessment. Unless  specified  in  the building contract, 

project engineers or architects should not use CONQUAS to decide if the building or 

parts of the building project are acceptable. 

1.2  Scope of CONQUAS 

CONQUAS sets out  the standards  for  the various aspects of construction work and 

awards points for works that meet the standards.  These points are then summed up 

to give a total quality score called the CONQUAS Score for the building project. 

CONQUAS  covers  most  aspects  of  general  building  architectural  works  and 

assessments  shall  be  completed  prior  to  application  for  TOP  or  CSC  inspection, 

whichever comes first.   

   

Page 5: BCA Construction Quality Assessment System

 

 

R4 – 1 Oct 2021   

5

CONQUAS® 2019

The assessment consists of four components: (1) Internal Finishes, (2) Installation Methods Verification and Functional Tests, (3) External Finishes, and (4) Bonus Points 

Each component is further divided into different items for assessment.  However, the assessment excludes works such as piling, heavy foundation and sub‐structure works which  are  heavily  equipment‐based,  buried  or  covered  and  usually  called  under separate  contracts  or  sub‐contracts.  Design,  choice  of  materials  and  end  users’ aesthetic preferences are also excluded from the assessment. 

The  building  is  assessed  primarily  on  workmanship  standards  achieved  through factory and site inspection. For projects using Design for Manufacturing and Assembly (DfMA) technologies, assessments will be done throughout the construction process with the Installation Methods Verification and some of the Functional Tests carried out in the factory. 

The assessment on the functional performance of selected services and installations help to safeguard the interest of building occupants in relation to safety, comfort and aesthetic defects which surface only after some time. 

To ensure the robustness of the CONQUAS score, major defects (e.g. water seepages through wall/window, inter‐floor leakages, functionally deficient doors/windows etc.) detected during the internal finish assessments will be taken into consideration. The scoring will factor in the severity of these major defects. Adverse feedback from end‐users on major defects that surface during the defects liability period of a project will also be considered when finalising the CONQUAS score. 

In  addition,  the  3‐tier  CONQUAS  Scheme  (see  Table  A)  is  introduced  to  help developers/contractors  further  raise  the  quality  of  their  new  private  residential developments. This involves a higher sampling rate assessment where more samples will  be  covered  and more  areas  for  improvement  identified.  The  3‐tier  CONQUAS Scheme  will  apply  to  all  CONQUAS  applications  for  new  *private  residential developments. 

The 3‐tier CONQUAS Scheme is applicable where: (a)  developers or main contractors, in the past 3 years, 

i. with no CONQUAS track record for *private residential development, or ii. has at  least one *private residential development with CONQUAS score 

below the threshold CONQUAS score4 or iii. has  at  least  one  *private  residential  development  with  major  defects 

affecting ≥ 20 units or 5% of all units, whichever is lower (Upon  the expiry of  the 3 year period, BCA  retains  the discretion  to  impose Tier 3 CONQUAS  assessment  if  BCA  assesses  that  the  major  defects  have  not  been reasonably addressed.) 

(b) all other developers or main contractors  i. to be decided after the initial CONQUAS score3 is generated 

*Note: Includes private mixed developments with residential component. 

Page 6: BCA Construction Quality Assessment System

 

 

R4 – 1 Oct 2021   

6

CONQUAS® 2019

Table A – 3‐Tier CONQUAS Scheme 

S/N  Applicants  Tier 1  Tier 2a  Tier 2b  Tier 3 

25%  sampling 

(25%  of  the 

units  will  be 

checked,  and 

sampling  will 

be  conducted 

within units) 

50% sampling1 

(50%  of  the 

units  will  be 

checked,  and 

sampling  will 

be  conducted 

within units) 

100% sampling  (all units  will  be checked,  and sampling  will be  conducted within units) 

100% checks2 

(all  locations within  all units  will  be checked) 

a)  Developers or main contractors i. with  no  CONQUAS  track 

record  for  *private residential  development  in the past 3 years, or 

‐  During 

CONQUAS 

application  

 

When  the initial CONQUAS score 3  is below  the threshold CONQUAS score4  set  by BCA 

‐ 

ii. has  at  least  one  *private residential  development  in the  past  3  years  with CONQUAS  Score  below  the threshold  CONQUAS  score4, or 

‐  ‐ 

  iii. has  at  least  one  *private residential  development  in the  past  3  years with major defects5 affecting  ≥  20  units or 5% of all units, whichever is lower 

Upon the expiry of the 3‐year period, 

BCA retains the discretion to  impose 

Tier  3  CONQUAS  assessment  if  BCA 

assesses that the major defects5 have 

not been reasonably addressed. 

‐  ‐  ‐  During 

CONQUAS 

application  

 

 

*Note: Includes private mixed developments with residential component. 

 1 Additional samples will be taken on: architectural internal finishes samples, wet areas water tightness tests for toilets/bathrooms, window water tightness tests. 

2 100% checks refer to the same regime of inspection as QM. Projects will be required to meet a higher score set at the bottom 40th percentile of industry average CONQUAS score of all private residential developments completed in the preceding year. 

3 The initial CONQUAS score will be derived after 20% (for tier 2a) and 50% (for tier 2b) of the required architectural internal finishes samples are completed. 

4 The threshold CONQUAS score is set at the bottom 10th percentile of industry average CONQUAS score for private residential projects in the preceding year.  

5 Major defects refer to defects that would generally not be acceptable to end‐users as specified in the guide on “Construction Quality Assessment System (CONQUAS)” available on BCA’s website.

Page 7: BCA Construction Quality Assessment System

 

 

R4 – 1 Oct 2021   

7

CONQUAS® 2019

1.3  Derivation of CONQUAS 

The minimum standards were derived from discussions with the major public sector 

agencies,  developers,  consultants  and  contractors  based  on  the  general 

specifications used in their projects. 

To  match  the  expectations  from  the  end  users,  feedback  through  complaints, 

homeowners’ survey findings and defects listings were also considered in refining the 

weightages and assessment standards. 

In developing CONQUAS, studies and numerous trials were conducted to fine‐tune its new test techniques and assessment standards. Moderation of the scoring system was carried out along with trials to ensure accuracy, consistency and alignment with end users expectations. 

 

1.4  CONQUAS Assessor 

BCA assessors undergo a rigorous training programme. They are required to attend 

BCA's in‐house CONQUAS training and calibration programme to ensure competency 

and consistency in the assessment. 

 

 

 

Page 8: BCA Construction Quality Assessment System

 

 

R4 – 1 Oct 2021   

CONQUAS® 2019

8 We shape a safe, high quality, sustainable and friendly built environment

2.0  CONQUAS 

2.1  Components to be assessed 

The CONQUAS assessment is divided into four main components – 

(a) Internal Finishes, (b) Installation Methods Verification and Functional Tests, (c) External Finishes, and (d) Bonus Points. 

 (a)  Internal Finishes 

Internal finishes deal mainly with the finishes and components. This is the part where  the  quality  and  standard  of  workmanship  are  most  visible.  The assessment covers: 

(i) architectural  finishes,  which  includes  floors,  internal  walls,  ceiling, doors,  windows  and  components.  Components  include  permanent internal fixtures (such as wardrobe, kitchen cabinet, vanity top, mirror, bathtub,  water  closet,  shower  screen,  basin  etc.),  and  permanent external fixtures (such signage, railings, unit number plates, lift fittings, letter box, lightings, metal gate, etc.). 

(ii) basic M&E  fittings, which  includes  taps  and mixers, WC,  floor  traps, electrical switches, trunkings, fan coil unit, air‐con diffuser, light fittings, CCTV camera, shower head, etc. At the lift lobby, lift display and call‐button panels are checked as M&E basic fittings.  

The quality standards for Internal Finishes are given in Appendix 1 

(b)  Installation Methods Verification and Functional Tests 

(i) Installation  methods  verification  on  the  following  4  trades  will  be carried out during the initial construction stage of the project: 

a) Waterproofing works to bathrooms/toilets b) Stone/tiling installation works c) Timber flooring installation d) Window installation 

The entire process for the above‐mentioned trades will be verified by 

BCA  against  the  submitted  approved  method  statements  and 

compared against BCA’s good industry practice guides.  

For  projects  that  adopt  prefabricated  prefinished  volumetric 

construction (PPVC), the verification of the above installation methods 

will be carried out in the factory. 

Page 9: BCA Construction Quality Assessment System

 

 

R4 – 1 Oct 2021   

CONQUAS® 2019

9 We shape a safe, high quality, sustainable and friendly built environment

a),  b),  c)  and  d)  will  be waived  if  the  PPVC manufacturer/factory  is 

Manufacturer Accreditation Scheme  (MAS) accredited and a) will  be 

waived if the waterproofing specialist is SCI accredited 

(ii) Functional  tests  check  on  window water‐tightness,  wet  area  water‐tightness  and  adhesion  of  internal wall  tiles will  be  carried  out.  For projects  that  adopt  PPVC,  a  maximum  of  30%  of  the  total  window water‐tightness  test  samples  and  20%  of  the  total  wet  area  water tightness test samples will be carried out in the factory. 

 

(c)  External Finishes 

(i) The assessment will cover the roofs, external walls and external works at the completion stage of the building.  

 

(d)  Bonus Points 

(i) Certified QM/CONQUAS Personnel  CONQUAS bonus point  is awarded  for projects  that employ certified 

QM/CONQUAS personnel. This is to facilitate quality achievement and 

encourage deployment of competent certified personnel on site.  

(ii) Design/Material Choices  Bonus points are given to projects using better buildable designs which 

facilitate higher quality achievement. 

(iii) Quality Mark (QM) Projects  Bonus points are given  to the project according to the quality  rating 

achieved under the QM tiered rating scheme.   

 

 

 

 

Page 10: BCA Construction Quality Assessment System

 

 

R4 – 1 Oct 2021   

CONQUAS® 2019

10 We shape a safe, high quality, sustainable and friendly built environment

2.2  The Weightages 

  In CONQUAS, the weightages for Internal Finishes, Installation Methods Verification 

and Functional Tests, External Finishes, and Bonus Points are allocated according to 

three categories of buildings as follows: 

Components to be 

Assessed 

Category of Development 

Weightage (%) 

 

Private Residential 

 

Public 

Residential 

Non‐

Residential 

1. Internal Finishes   60  55   50  

2. Installation Methods Verification and Functional Tests 

20   25   30  

3. External Finishes   20  20   20  

Sub Total 

CONQUAS Score  100  100  100  

4. Bonus Points  8  7  7 

Total 

CONQUAS Score 108  107  107 

Note : (i) For private mixed development with residential component, the project will follow 

the weightage under the private residential category.  

The  total  CONQUAS  score  of  a  building  is  the  sum  of  points  awarded  to  the  four 

components in each category of building. 

2.3  Sampling 

As  it  is  impractical  to  assess  all  elements  in  a building,  CONQUAS uses  a  sampling system for the assessment. The sampling system, which is based on the gross floor area of the building, will ensure that the assessment adequately represents the entire building. 

 

 

Page 11: BCA Construction Quality Assessment System

 

 

R4 – 1 Oct 2021   

CONQUAS® 2019

11 We shape a safe, high quality, sustainable and friendly built environment

3.0  THE ASSESSMENT 

3.1  Assessment Approach 

In general, the Assessor should select the actual locations to be assessed prior to each assessment. Selection of samples shall be based on drawings and location plans. The samples  shall  be  distributed  as  uniformly  as  possible  throughout  the  construction stages.  

The  scoring  will  be  done  on  the  works  that  are  inspected  for  the  first  time. Rectification and correction carried out after the assessment will not be re‐scored. The objective  of  this  practice  is  to  encourage  contractors  "doing  things  right  the  first time". 

When an assessed item does not comply with the corresponding CONQUAS standards, it is considered failed and an "X" will be noted in the assessment form. Likewise a "" is given for an item meeting the standards. A "blank" will indicate that the item is not applicable. The score is computed based on the number of "" over the total number of items assessed. 

3.2  Assessment 

Assessment  is  typically  carried  out  upon  completion  of  the  building  and  before 

handing  over  of  the  project  to  the  owner.  Only  the  verification  of  the  installation 

methods  and  functional  tests  would  be  carried  out  during  the  initial  stage  and 

progressive stages of the construction progress. 

The assessment consists of the following items: 

Assessment Items 

Category of Development 

Weightage (%) 

Private 

Residential 

Public 

Residential 

Non‐

Residential 

Internal Finishes   60 55 50

Floor  16.3  14.5  13.5 

Internal Wall  10.2  9.3  13.6 

Ceiling  10.1  9.4  5.1 

Door  7.2 6.8 5.1

Window  7.2  6.7  5.1 

Component  6  5.5  5.1 

Page 12: BCA Construction Quality Assessment System

 

 

R4 – 1 Oct 2021   

CONQUAS® 2019

12 We shape a safe, high quality, sustainable and friendly built environment

M&E basic Fittings  3 2.8 2.5

Installation  Methods  Verification  and 

Functional Tests 20  25   30 

Field Window Water‐Tightness Test (WTT)

(BCA Test) 9  11.5  14 

*Field  Window  Water‐Tightness  Test 

(WTT) (Self‐Testing) *Pre‐requisite  *Pre‐requisite  *Pre‐requisite 

Wet Area Water‐Tightness Test (BCA Test)  5  6.5  8 

*Wet Area Water‐Tightness Test (Self‐Testing)  *Pre‐requisite  *Pre‐requisite  *Pre‐requisite 

Pull‐Off‐Test for Internal Wall Tiles  4  5  6 

#Installation Method Verification  2  2  2 

External Finishes   20  20  20 

Roof  5  5  5 

External Wall  5  5  7.5 

External Works  10  10  7.5 

Sub Total CONQUAS Score   100  100  100 

Bonus Points  8  7  7 

Total CONQUAS Score  108  107  107 

 

Note: # These checks may be covered under QM assessment and PPVC projects under the MAS 

certification audits. These checks may be waived by BCA, if the PPVC system is already certified 

under MAS. Assessment for internal wet area waterproofing works will be waived and points 

allocated  if  the  appointed  contractor  for  such  works  is  accredited  under  the  Singapore 

Concrete  Institute  (SCI) Accreditation Scheme  for Waterproofing Specialist Contractors. The 

accredited waterproofing contractor must produce a valid SCI certificate that covers the entire 

contractual period of the installation works for the project.   

Score will be prorated accordingly if any of the 4 trades are not applicable to the project. 

* Project Qualified Person to declare the results of the self‐testing carried out by the project. 

   

Page 13: BCA Construction Quality Assessment System

 

 

R4 – 1 Oct 2021   

CONQUAS® 2019

13 We shape a safe, high quality, sustainable and friendly built environment

Weightages for internal finishes and M&E fittings assessment of Private Residential 

projects are allocated at the defect level based on the guidelines set out below: 

Element  Element Weightage  Defect Category  Defect Weightage 

Floor 

    

16.3 points     

Finishing  4.9 

Alignment & Evenness  2.9 

Crack & Damages  4.9 

Hollowness  2 

Jointing  1.6 

Internal Wall 

    

10.2 points     

Finishing  2.6 

Alignment & Evenness  1.2 

Crack & Damages  4.6 

Hollowness  1 

Jointing  0.8 

Ceiling 

    

10.1 points     

Finishing  2 

Alignment & Evenness  2 

Crack & Damages  3.1 

Roughness  2.5 

Jointing  0.5 

Door  7.2 points 

Joint & Gap  0.7 

Alignment & Evenness  0.7 

Material & Damages  1.8 

Functionality  2.2 

Accessories Defects  1.8 

Window  7.2 points 

Joint & Gap  0.7 

Alignment & Evenness  0.7 

Material & Damages  1.8 

Functionality  2.9 

Accessories Defects  1.1 

Component  6 points 

Joint & Gap  0.6 

Alignment & Evenness  1.2 

Material & Damages  2.4 

Functionality  0.9 

Accessories Defects  0.9 

M&E Fitting  3 points 

Joint & Gap  0.3 

Alignment & Evenness  0.3 

Material & Damages  0.9 

Functionality  1.2 

Accessories Defects  0.3 

 

 

Page 14: BCA Construction Quality Assessment System

 

 

R4 – 1 Oct 2021   

CONQUAS® 2019

14 We shape a safe, high quality, sustainable and friendly built environment

Weightages  for  internal  finishes and M&E fittings assessment of Public Residential 

projects are allocated at the defect level based on the guidelines set out below: 

Element  Element Weightage  Defect Category  Defect Weightage 

Floor 

    

14.5 points     

Finishing  4.4 

Alignment & Evenness  2.5 

Crack & Damages  4.4 

Hollowness  1.8 

Jointing  1.4 

Internal Wall 

    

9.3 points     

Finishing  2.4 

Alignment & Evenness  1.1 

Crack & Damages  4.2 

Hollowness  0.9 

Jointing  0.7 

Ceiling 

    

9.4 points     

Finishing  1.9 

Alignment & Evenness  1.9 

Crack & Damages  2.8 

Roughness  2.3 

Jointing  0.5 

Door  6.8 points 

Joint & Gap  0.7 

Alignment & Evenness  0.7 

Material & Damages  1.7 

Functionality  2 

Accessories Defects  1.7 

Window  6.7 points 

Joint & Gap  0.7 

Alignment & Evenness  0.7 

Material & Damages  1.7 

Functionality  2.6 

Accessories Defects  1 

Component  5.5 points 

Joint & Gap  0.6 

Alignment & Evenness  1.1 

Material & Damages  2.2 

Functionality  0.8 

Accessories Defects  0.8 

M&E Fitting  2.8 points 

Joint & Gap  0.3 

Alignment & Evenness  0.3 

Material & Damages  0.8 

Functionality  1.1 

Accessories Defects  0.3 

 

 

Page 15: BCA Construction Quality Assessment System

 

 

R4 – 1 Oct 2021   

CONQUAS® 2019

15 We shape a safe, high quality, sustainable and friendly built environment

Weightages  for  internal  finishes  and  M&E  fittings  assessment  of Non  Residential 

projects are allocated at the defect level based on the guidelines set out below: 

Element  Element Weightage  Defect Category  Defect Weightage 

Floor 

    

13.5 points     

Finishing  4 

Alignment & Evenness  2.4 

Crack & Damages  4 

Hollowness  1.7 

Jointing  1.4 

Internal Wall 

    

13.6 points     

Finishing  3.4 

Alignment & Evenness  1.6 

Crack & Damages  6.1 

Hollowness  1.4 

Jointing  1.1 

Ceiling 

    

5.1 points     

Finishing  1 

Alignment & Evenness  1 

Crack & Damages  1.5 

Roughness  1.3 

Jointing  0.3 

Door  5.1 points 

Joint & Gap  0.5 

Alignment & Evenness  0.5 

Material & Damages  1.3 

Functionality  1.5 

Accessories Defects  1.3 

Window  5.1 points 

Joint & Gap  0.5 

Alignment & Evenness  0.5 

Material & Damages  1.3 

Functionality  2 

Accessories Defects  0.8 

Component  5.1 points 

Joint & Gap  0.5 

Alignment & Evenness  1 

Material & Damages  2 

Functionality  0.8 

Accessories Defects  0.8 

M&E Fitting  2.5 points 

Joint & Gap  0.25 

Alignment & Evenness  0.25 

Material & Damages  0.75 

Functionality  1 

Accessories Defects  0.25 

 

 

 

Page 16: BCA Construction Quality Assessment System

 

 

R4 – 1 Oct 2021   

CONQUAS® 2019

16 We shape a safe, high quality, sustainable and friendly built environment

The assessment is based on the sampling guidelines table as set out below: 

Sampling Guidelines Table 

  Items GFA per Sample 

MinSampl

MaxSampl

e Remarks 

1  Internal Finishes  500 m2  50  150 For Non‐Residential Project & Public Mixed Development Project with Non‐Residential GFA exceeding 50% 

1a  Internal Finishes  70 m2  90  800 

For all Private Residential Project & Mixed Development Project with Residential component. For Public Mixed Development Project with Residential GFA exceeding 50% 

1a(i) Internal Finishes  (Tier 2a)  

‐  90  1,440 

50% Sampling (50% coverage for all units): Max Principal samples: 640 Max Service samples: 640 Max Circulation samples: 160 

1a(ii) Internal Finishes  (Tier 2b) 

‐  90  2,160 

100% Sampling (100% coverage for all units): Max Principal samples: 1000 Max Service samples: 1000 Max Circulation samples: 160 

1b  Internal Finishes  70 m2  90  600  For Public Residential Project 

2  External Wall  ‐  100%  ‐  100% of the blocks or units 

3  External Work  ‐  1  ‐  1 for each type of external work 

4  Roof  ‐  50%  ‐  Minimum 50% of the blocks or units  

5a Field Window Water‐tightness Test (WTT) 

‐   20  100 

Conducted by BCA.  A sample is defined as 2m length of joint.  5% of total number of window panels or 5% of total curtain wall area, whichever is applicable 

Page 17: BCA Construction Quality Assessment System

 

 

R4 – 1 Oct 2021   

CONQUAS® 2019

17 We shape a safe, high quality, sustainable and friendly built environment

5b(i) Field Window Water‐tightness Test (WTT) (Tier 2a) 

‐  40  200 

50% Sampling  10% of total number of window panels or 10% of total curtain wall area, whichever is applicable  For all Private Residential Project & Mixed Development Project with Residential component  

5b(ii) Field Window Water‐tightness Test (WTT) (Tier 2b & Tier 3) 

‐  40  200 

100% Sampling  20% of total number of window panels or 20% of total curtain wall area, whichever is applicable   For all Private Residential Project & Mixed Development Project with Residential component   

5c Field Window Water‐tightness Self‐Test (WTT) 

‐  25%  ‐ Self‐Testing with declaration by project Qualified Person 

 6a 

Wet Area Water‐tightness Test: 

Non‐Residential Projects 

  

Residential Projects 

 

‐    ‐ 

20    

60 

 100    

300  

Conducted by BCA: Non‐Residential Projects:   • 20% of all bathrooms and/or toilets (by location)  Residential projects: • 30% of all bathrooms and/or toilets (by location) • all will be tested if less than the minimum sample (for all projects)  

7b(i) Wet Area Water‐tightness Test  (Tier 2a) 

‐  100  600 

50% Sampling (50% of all bathrooms and/or toilets): Based on number of bathrooms and/or toilets  For all Private Residential Project & Mixed Development Project with Residential component  All will be tested if less than  the minimum sample 

Page 18: BCA Construction Quality Assessment System

 

 

R4 – 1 Oct 2021   

CONQUAS® 2019

18 We shape a safe, high quality, sustainable and friendly built environment

7b(ii) Wet Area Water‐tightness Test  (Tier 2b) 

‐  120  1000 

100% Sampling (100% coverage for all units): Based on number of bathrooms and/or toilets  For all Private Residential Project & Mixed Development Project with Residential component  All will be tested if less than the minimum sample 

7c Wet Area Water‐tightness Self‐Test 

  100%   • Self‐Testing with declaration by project Qualified Person • Including flat roof 

Installation methods of following trades,  (i)   Waterproofing works (ii)  Marble/tiling works (iii) Timber flooring works,  and (iv) Window Installation works 

‐  ‐  ‐ Assessment based on approved Method Statement, where applicable 

9 Pull‐Off‐Test for Internal Wall tiles 

10,000 m2 

1 set 

5 sets 

5 tiles per set (by location) 

 

A location for internal finishes assessment is a functional space of a building such 

as  a  room,  hall,  toilet,  kitchen,  yard,  corridor  or  lobby.  Locations  are  further 

categorized into three types: 

Principal locations are major functional places such as halls and rooms. 

Circulation locations include lift lobbies, corridors and staircases. 

Service locations are utility areas such as toilets, kitchens, balconies and 

yards.  

The  computed  number  of  locations  will  be  distributed  according  to  "Principal", 

"Circulation" and "Service" based on the percentages set out in the two categories of 

buildings as below: 

Locations 

Building Categories 

Residential* Non‐

Residential 

Principal  40%  60% 

Service  40%  15% 

Circulation  20%  25% 

*Note: For private residential under the 3‐Tier CONQUAS scheme, please refer to the above sampling guidelines table. 

Page 19: BCA Construction Quality Assessment System

 

 

R4 – 1 Oct 2021   

CONQUAS® 2019

19 We shape a safe, high quality, sustainable and friendly built environment

Scoring of  internal  finishes  is based on  the defects groups as  shown  in Appendix 4 'Defects Grouping Guide for Assessment of Internal Finishes'.  

In  general,  any  item which  is  not  available  in  a  project will  not  be  considered  for scoring. For such case, the architectural score will be pro‐rated accordingly. However, any available item that is not offered for assessment will be considered as failed and no points awarded. 

An item under assessment will be considered failed if it does not meet the standards. In addition,  any  item  found  to be defective  functionally  such as evidence of water seepage  in  the window, wall,  slab,  ceiling or  roof,  is  considered  to have  failed  the assessment. Likewise, for a particular defect that  is found excessive in an item (say excessive cracks on a wall). 

For the assessment of roof, a minimum 50% of the total number of buildings will be assessed. For the assessment of external walls, 100% of the total number of buildings will  be  assessed.  For  a  building,  the  external  wall  will  be  divided  into  4  walls  for assessment. 

The External Works assessment consists of the following locations: 

(a)  Link‐way / Shelter  ‐ 10m length section per sample and minimum 2 samples 

(b)  Apron & Drain  ‐ 10m length section per sample and minimum 2 samples 

(c)  Roadwork & Carpark   ‐ 10m length section per sample and minimum 1 sample 

(d)  Footpaths & Turfing   ‐ 10m length section per sample and minimum 2 samples 

(e)  Playground  ‐ 1 location 

(f)  Court  ‐ 1 location 

(g)  Fencing & Gate  ‐ 10m length section per sample and minimum 1 sample 

(h)  Swimming Pool  ‐ 10m length section per sample and minimum 1 sample 

(i)  Club House  ‐ 1 location 

(j)  Guard House  ‐ 1 location 

(k)  Electrical Substation  ‐ 1 location 

 

Each item in the External Works will be assessed separately and all the locations listed above must be assessed where applicable. 

Under the material & functional tests, self‐test items like field window water‐tightness 

test for 25% of windows and 100% wet area water‐tightness test (including flat roof) 

are set as pre‐requisites and based on declaration by the project Qualified Person (QP).  

 

Page 20: BCA Construction Quality Assessment System

 

 

R4 – 1 Oct 2021   

CONQUAS® 2019

20 We shape a safe, high quality, sustainable and friendly built environment

3.3  Bonus Points 

(a) Design/Material Choices Bonus  points  are  given  to  projects  using  better  buildable  designs  which  facilitate 

higher quality achievement. 

Requirement  Bonus Point

Use of advance precast concrete system (*APCS) elements supplied 

by SCI Accredited Precasters  

0.5 

 

Use of prefabricated MEP plant modules  0.5 

Use of Prefabricated Bathroom Unit (PBU) 

at least 65% of toilets) 

{The PBU system has to be accredited under the PBU Manufacturer 

Accreditation Scheme (MAS)} 

1.0 

 

Use of Prefabricated Prefinished Volumetric Construction (PPVC) (at 

least 65% of coverage) 

{The PPVC system has to be accredited under the PPVC Manufacturer 

Accreditation Scheme (MAS)} 

2.0 

 

Use of Mass Engineered Timber (e.g. Cross Laminated Timber, Glued 

Laminated Timber, etc.) (at least 65% of coverage) 

 {A building is deemed constructed using engineered timber if both 

the floor (including roof) and wall are constructed using engineered 

timber.} 

1.0 

 

Use  of  productive  materials,  which  facilitate  higher  quality 

achievement(at least 65% of coverage) – 0.3 points each e.g. 

i. Engineered wood/ Stone flooring ii. Vinyl flooring  iii. Other productive material   

Max. 1.0 

 

 

   *  APCS  refers  to  a  precast  construction  method  that  applies  the  3S  principles  of   Standardisation,  Simplicity  and  Single  Integrated  elements.  For  areas  to  be   considered  as  APCS,  (i)  slabs  shall  be  of  precast;  and  (ii)  adopt  at  least  4  out  of  6   features,  with  coverage  of  at  least  65%.  (refer  to   https://bca.gov.sg/buildableDesign/advanced‐precast‐concrete‐system.html ).  

  

Page 21: BCA Construction Quality Assessment System

 

 

R4 – 1 Oct 2021   

CONQUAS® 2019

21 We shape a safe, high quality, sustainable and friendly built environment

(b) Certified QM/CONQUAS Personnel  

CONQUAS bonus point is awarded for projects that employ certified QM/CONQUAS 

personnel.  This  is  to  facilitate  quality  achievement  and  encourage  deployment  of 

competent certified personnel on site. 

Requirement  Bonus Point 

Certified CONQUAS Supervisor  0.15 

Certified QM Supervisor 0.3  A supervisor can only be deployed on one project at any time 

Supervisor must be deployed fulltime during the project duration 

Certified CONQUAS Manager  0.4 

Certified QM Manager 0.6  A manager can be deployed for maximum of 2 projects at any 

time Maximum  1.0 

 

Note: 

1. QM/CONQUAS Personnel must be certified and deployed minimally for the period 

between  commencement  of  the  superstructure  works  and  completion  of  the 

project. 

2.   Both employer and employee must declare the personnel was deployed for the 

minimum duration as specified. 

3.  The  QM/CONQUAS  manager/supervisor  shall  demonstrate  commitment  and 

satisfactory  performance  during  the  project  duration  pertaining  to  quality  and        

CONQUAS assessment issues. It is the responsibility of the certified personnel to        

ensure the project personnel attend all allocated CONQUAS training, assessments 

are completed, and submission of documents done timely.  They should conduct 

themselves  in  a  professional  manner  when  dealing  with  feedback  on  defects 

related to workmanship quality, failing which, CONQUAS bonus points will not be 

awarded. 

4.  Where  required,  additional  documents  and  records  shall  be  furnished  for 

verification. 

 

 

   

Page 22: BCA Construction Quality Assessment System

 

 

R4 – 1 Oct 2021   

CONQUAS® 2019

22 We shape a safe, high quality, sustainable and friendly built environment

(c) Quality Mark (QM) Projects  

Bonus points are given to the project according to the quality rating achieved under 

the QM tiered rating scheme.   

Requirement  Bonus Point* 

QM STAR  1.0 

QM EXCELLENT  0.5 

 

3.4  Major Defects 

Major defects are largely classified as defects that would generally not be acceptable 

to end‐users. Examples are as follows: 

a) Any missing/ broken accessories for the architectural items assessed  b) Any cracked/ chipped/ broken window panes,  shower screens, mirrors and any 

glass items; c) Any visually visible cracked tiles/ stones, timber doors & flooring, ceiling boards 

and cracks on painted walls, etc.; d) Functionally deficient doors, windows, wardrobes and cabinets, tap, water closet, 

switches, etc.; e) Fan coil unit leaking, water seepage through walls or windows, etc.; f) Misaligned door frame – only for cases where verticality tolerance > 3mm per door 

frame height.  

When a major defect is identified during the assessment by BCA, it is considered failed 

and two "X" instead of one will be noted in the assessment form. 

Declaration by the project QP shall be required on the satisfactory rectification of these 

major defects before the issue of the CONQUAS score. 

 

   

Page 23: BCA Construction Quality Assessment System

 

 

R4 – 1 Oct 2021   

CONQUAS® 2019

23 We shape a safe, high quality, sustainable and friendly built environment

3.5   Score Moderation Framework 

(a) Adverse Feedback  

This is to allow for fine‐tuning of score for any valid negative feedback, received during 

a project‘s defect liability period e.g. major workmanship issues that are surfaced or 

reported questionable / unacceptable practices, etc. 

A Review Committee will evaluate and approve points to be deducted for such cases: 

Major Defects/ Issues Reported CONQUAS Point Deduction

1. Major Defects a) Water seepage through walls and/ windows; 

b) Water seepage in the bathrooms/ toilets. 

Up to 4 points 

2. Questionable/ Unacceptable practices, e.g. cardboards found under timber flooring 

Up to 5 points  

3. Major defects/ Questionable/ Unacceptable practices with significant social impact, e.g. cement bags/ newspaper found in door frames, national iconic projects with leakages in roof/ façade, etc.  

Up to 10 points  

 

(b) Restricted Samples Given for Assessment  

To ensure that  the sampling system adequately represent  the quality of  the whole 

project, CONQUAS score will be adjusted based on the areas provided for assessment, 

as follows: 

Average *Areas Offered for Assessment  CONQUAS Point Deduction 

90 ~ 95%  2 points 

75 ~ 90%  4 points 

50 ~ 75%  6 points 

Less than 50%  10 points 

Note: *Based on number of units for residential projects and blocks/floors for other projects 

   A project may  not  be  issued  the  CONQUAS  score  if  less  than  90% of  the  required 

internal finish samples were assessed.  

Page 24: BCA Construction Quality Assessment System

 

 

R4 – 1 Oct 2021   

CONQUAS® 2019

24 We shape a safe, high quality, sustainable and friendly built environment

3.6  Computation of CONQUAS Score 

Below are two examples of how a project’s CONQUAS score will be computed: 

Scenario 1: 

Project Type       ‐   Commercial (Non‐Residential) 

Structural System  ‐   70% coverage for APCS 

Roofing System     ‐   Flat Roof 

Nos of Toilet            ‐  10  nos  (100%  Prefabricated  Bathrooms 

accredited under the PPVC MAS and supplied by 

an Accredited Precaster) 

Fulltime Certified Personnel   ‐  2 CONQUAS supervisors, 1 CONQUAS Manager  

 

Step 1: Main Assessment Score 

Assessment Items Weightage 

(%) Score  Remarks 

Internal Finishes   50  41.1   

    Floor  13.5 10.8

    Internal Wall  13.6 10.5

    Ceiling  5.1 4.4

    Door  5.1 4.5

    Window  5.1 4.6

    Component  5.1 4.3

    M&E basic Fittings  2.5 2

Installation Methods 

Verification and 

Functional Tests 

30  29    

Field Window Water‐

Tightness  Test  (WTT) 

(BCA Test) 

14 14

Page 25: BCA Construction Quality Assessment System

 

 

R4 – 1 Oct 2021   

CONQUAS® 2019

25 We shape a safe, high quality, sustainable and friendly built environment

*Field Window 

Water‐Tightness Test 

(WTT) (Self‐Testing) 

Pre‐requisite submitted

Wet Area Water‐

Tightness Test 

(BCA Test) 

8 8

*Wet Area Water‐

Tightness Test 

(Self‐Testing) 

Pre‐requisite submitted

Pull‐Off‐Test for 

Internal Wall Tiles 6 5

 Installation Method 

Verification 2 2

No tiling, no timber 

flooring, prorated for 

waterproofing, and 

windows installation 

methods. 

External Finishes   20  13   

Roof  5 3

External Wall  7.5 5

External Works  7.5 5

Sub Total 

CONQUAS Score  100  83.1   

 

Step 2: Computation of Bonus Points 

Requirement  Bonus Point ScoreUse of advance precast concrete system 

(APCS)  elements  supplied  by  SCI 

Accredited Precasters  

0.5

 

0.5 

 

Use of prefabricated MEP plant modules  0.5  0 

Use  of  Prefabricated  Bathroom Unit  (at 

least 65% of toilets) 

1.0 

 

1.0 

 

Page 26: BCA Construction Quality Assessment System

 

 

R4 – 1 Oct 2021   

CONQUAS® 2019

26 We shape a safe, high quality, sustainable and friendly built environment

Use  of  Prefabricated  Prefinished 

Volumetric Construction (PPVC) (at least 

65% of coverage) 

{The  PPVC  system  has  to  be  accredited 

under  the  PPVC  Manufacturer 

Accreditation Scheme (MAS)} 

2.0 

 

 

Use  of  Mass  Engineered  Timber  (e.g. 

Cross  Laminated  Timber,  Glued 

Laminated Timber, etc.) (at  least 65% of 

coverage)  

{A building is deemed to be constructed 

using engineered timber if both the floor 

(including roof) and wall are constructed 

using engineered timber.} 

1.0 

 

 

Use  of  productive  materials,  which 

facilitate higher quality achievement  (at 

least 65% of coverage) – 0.3 points each 

e.g. 

i. Engineered wood/ Stone flooring ii.  Vinyl flooring  iii.  Other productive material  

Max. 1.0 

 

 

 

 

 

Certified Personnel Deployed  Bonus Point 

Certified CONQUAS Supervisor x1  0.15 x 2 

Certified CONQUAS Manager x1 0.60 

Total  0.9 

 

Step 3: Computation of Final CONQUAS Score 

 

Area of Works/Component Project Score

Main assessment score  83.1 

Bonus  2.4 

CONQUAS Score  85.5 

Page 27: BCA Construction Quality Assessment System

 

 

R4 – 1 Oct 2021   

CONQUAS® 2019

27 We shape a safe, high quality, sustainable and friendly built environment

Scenario 2: 

Project Type      ‐   Private Residential  

Roofing System     ‐   Flat Roof 

Structural System         ‐  PPVC  system  (70%  coverage)  accredited  under 

the PPVC MAS and supplied by a SCI Accredited 

Precaster  

Toilets  ‐  70% Prefabricated Bathrooms accredited under 

the  PPVC MAS  and  supplied  by  an  Accredited 

Precaster  (including  bathrooms  within  PPVC 

modules) 

  QM rating      ‐  QM Merit 

Fulltime Certified Personnel  ‐  1 CONQUAS supervisor, 1 QM supervisor, 1 QM 

Manager 

Step 1: Main Assessment Score 

Assessment Items Weightage 

(%) Score  Remarks 

Internal Finishes   60  56.6   

    Floor  16.3 15.8 

    Internal Wall  10.2 9.7 

    Ceiling  10.1 9.5 

    Door  7.2 6.5 

    Window  7.2 6.6 

    Component  6 6.3 

    M&E basic Fittings  3 2.2 

Installation Methods 

Verification and Functional Tests 20  20    

Field  Window  Water‐Tightness 

Test (WTT) (BCA Test) 

 

9 9 

Page 28: BCA Construction Quality Assessment System

 

 

R4 – 1 Oct 2021   

CONQUAS® 2019

28 We shape a safe, high quality, sustainable and friendly built environment

*Field Window Water‐Tightness 

Test (WTT) (Self‐Testing) *Pre‐requisite submitted 

Wet Area Water‐Tightness Test 

(BCA Test) 5 5 

*Wet Area Water‐Tightness Test

(Self‐Testing) *Pre‐requisite submitted 

Pull‐Off‐Test for Internal Wall 

Tiles 4 4 

 Installation Method Verification  2 2  .

External Finishes   20 15.5

Roof  5 3 

External Wall  5 4.5 

External Works  10 8 

Sub Total 

CONQUAS Score  100  92.1   

 

Step 2: Computation of Bonus Points 

Requirement  Bonus Point  Score

Use  of  advance  precast  concrete  system  (APCS) 

elements supplied by SCI Accredited Precasters  

0.5 

 

 

Use of prefabricated MEP plant modules  0.5  0 

Use of Prefabricated Bathroom Unit (at least 65% of 

toilets) 

1.0 

 

1.0 

 

Use  of  Prefabricated  Prefinished  Volumetric 

Construction (PPVC) (at least 65% of coverage) 

{The  PPVC  system  has  to  be  accredited  under  the 

PPVC Manufacturer Accreditation Scheme (MAS)} 

2.0 

 

2.0 

 

Page 29: BCA Construction Quality Assessment System

 

 

R4 – 1 Oct 2021   

CONQUAS® 2019

29 We shape a safe, high quality, sustainable and friendly built environment

Use  of  Mass  Engineered  Timber  (e.g.  Cross 

Laminated Timber, Glued Laminated Timber, etc.) (at 

least 65% of coverage)  

{A  building  is  deemed  to  be  constructed  using 

engineered timber  if both the  floor  (including roof) 

and wall are constructed using engineered timber.} 

1.0 

 

 

Use of productive materials, which  facilitate higher 

quality achievement (at least 65% of coverage) – 0.3 

points each 

e.g. 

i. Engineered wood/ Stone flooring 

ii. Vinyl flooring  

iii. Other productive material  

Max. 1.0 

 

 

 

 

 

Certified Personnel Deployed  Bonus Point 

Certified CONQUAS Supervisor x1  0.15 

Certified QM Supervisor x1 0.30 Certified QM Manager x1 0.60 

Total  1.05  

 

Requirement  Bonus Point 

QM STAR  ‐ 

QM EXCELLENT  ‐ 

QM MERIT  0 

 

Step 3: Computation of Final CONQUAS Score 

Area of Works/Component  Project Score

Main assessment score  92.1 

Bonus  4.0 

CONQUAS Score  96.1 

   

Note: Project will be published as CONQUAS  

Page 30: BCA Construction Quality Assessment System

 

 

R4 – 1 Oct 2021   

CONQUAS® 2019

30 We shape a safe, high quality, sustainable and friendly built environment

3.7  Publication of CONQUAS Scores 

The overall CONQUAS scores of projects are published and accessible for viewing on the  IQUAS  (Information  on  Construction Quality)  Portal  at  BCA’s website.  Projects 

scoring 95 CONQUAS points or higher will only be shown as “CONQUAS    ”. Higher CONQUAS scores generally reflect better workmanship. However, scores beyond 95 points  are  often  achieved  at  significant  cost  and  effort  disproportionate  to  the 

incremental  achievement  in  quality.  The  “CONQUAS      ”  rating  facilitates  setting realistic quality benchmarks balanced with productivity and cost considerations.      

 

 

 

 

 

 

 

 

 

   

Page 31: BCA Construction Quality Assessment System

 

R4 – 1 Oct 2021   

31 

CONQUAS® 2019

We shape a safe, high quality, sustainable and friendly built environment

Appendix 1 

QUALITY STANDARDS FOR INTERNAL FINISHES WORKS 

Architectural Finishes 

  Item*    Standards      1  Floors        1a  General Requirements  1) Finishing      No stain marks       Consistent colour tone       Floor divider provided where required          2) Alignments & Evenness      Evenness of surface (not more than 3mm per 1.2m)       Falls in wet areas should be in right direction       No ponding in falls for wet area       For staircases, the variance in lengths of threads and risers 

must not exceed 5 mm; nosing must be straight       Skirting size and joint aligned with floor if of same material          3) Crack & Damages      No visible damage / defects          4) Hollowness / Delamination      No hollow sound when tapped with a hard object       No sign of delamination          5) Jointing      Consistent skirting thickness       No visible gap between wall & skirting      1b  Screed finish  1) Surfaces should not be unduly rough or patchy          2) No visible trowel marks         3) Expansion joints should be provided at interval as stated by 

architect      1c  Tiled finish  1) Consistent colour and neat pointing         2) No hollow sound when tapped with a hard object          3) Joints are aligned and consistent with skirting and wall tiles         4) Consistent joint size         5) Lippage between 2 tiles should not be more than 0.5 mm         6) Expansion joints should be provided at interval as stated by 

architect 

* An item is deemed to have failed if any one of the standards is not met 

Page 32: BCA Construction Quality Assessment System

 

R4 – 1 Oct 2021   

32 

CONQUAS® 2019

We shape a safe, high quality, sustainable and friendly built environment

  Item*    Standards      1d  Timber floor  1) No warpage         2) Timber strips to rest firmly on joists or screed          3) No visible gaps in between timber strips         4) Edges of the floor to be properly sealed     1e  Carpet  1) Stretched and even surface          2) Joint should not be visible         3) Proper anchoring at all edges      1f  Raised Floor  1) No loose floor panels         2) No protrusion / potential of tripping over floor panels           3) No jolting or rocking panel     1g  Mass Engineered Timber 

(MET) 1) Surface finish grade as per project’s specifications 

    2) Visual finish surface to be planed and sanded          3) Knot size tolerance:

a. Domestic grade ‐ Not more than 20 mm diameter b. Industrial and Standard grade ‐ Not more than 50 mm 

diameter  

    4) Voids to be filled if specified         5) No damages e.g. dents         6) Crack tolerance:

a. Domestic grade ‐ Not more than 200 mm long and 2 mm width 

b. Industrial and Standard grade ‐ Not more than 400 mm long and 4 mm width 

         7) Hollowness:

a) Not applicable for exposed MET elements b) Not applicable for ceramic/stone/screed floor finishes laid 

directly on MET elements c) No hollowness for ceramic/stone floor finishes laid on 

screed over MET elements           

* An item is deemed to have failed if any one of the standards is not met 

 

 

 

Page 33: BCA Construction Quality Assessment System

 

R4 – 1 Oct 2021   

33 

CONQUAS® 2019

We shape a safe, high quality, sustainable and friendly built environment

  Item*    Standards      2  Internal Walls        2a  General  1) Finishing      No stain marks       Consistent colour tone       No rough / patchy surface          2) Alignments & Evenness      Evenness of surface (not more than 3mm per 1.2m)       Verticality of wall (not more than 3mm per m)       Walls meet at right angles (not more than 4mm over 

300mm)       Edges (wall to wall) to appear straight and aligned          3) Crack & Damages      No visible damage / defects          4) Hollowness / Delamination      No hollow sound when tapped with a hard object       No sign of delamination          5) Jointing      Straightness of corners and joints      2b  Plaster Finish  1) Surface evenness (not more than 3mm over 1.2m)          2) No hollow sound when tapped with a hard object.          3) Surfaces should not be unduly rough or patchy esp no 

brush / trowel marks      2c  Tiled Finish  1) Tile joints aligned and with consistent joint size          2) No hollow sound when tapped with a hard object          3) Consistent colour and neat pointing         4) Lippage between 2 tiles should not be more than 0.5mm      2d  Cladding  1) Proper anchorage for panels         2) Joints aligned and with consistent joint size          3) Sealant material compatible with cladding          4) Consistent spacing and within allowable tolerance      2e  Architectural Coating  1) Substrate ‐ see plaster finish         2) Finished texture and colour to be uniform      

* An item is deemed to have failed if any one of the standards is not met 

 

Page 34: BCA Construction Quality Assessment System

 

R4 – 1 Oct 2021   

34 

CONQUAS® 2019

We shape a safe, high quality, sustainable and friendly built environment

  Item*    Standards 

     2f  Painting  1) Substrate ‐ see plaster finish         2) Surfaces are evenly painted         3) Good opacity, no patchiness resulted from touch up works

         4) Free from peeling, blister and chalkiness         5) No discolouration and fading     2g  Pre‐cast concrete planks  1) Alignment with adjacent planks not more than 3mm          2) Plane tolerance (3mm / 1.2m)     2h  Wall Paper  1) Stretched and even surface         2) Joint should not be visible         3) Proper anchoring at all edges         4) Edges should be neatly laid and finished     2i  Glass Blocks  1) Pointing should be satisfactory         2) Joint should be even

     3) Glass blocks should be properly aligned      2j  Wood / Timber Panels  1) Timber panels to rest firmly on joist or screed          2) No visible gaps between panels         3) Edges should be properly aligned and sealed          4)

 5) 

No warpage No cracks 

     2k  Fair‐Face Concrete  1) Consistent distribution of blowholes for the same sample/ 

surrounding area          2) All blowhole sizes to be equal or less than 8mm 

     3) Consistent tonality for the same sample/ surrounding area          4) No exposed aggregate         5) No cracks and damages          

* An item is deemed to have failed if any one of the standards is not met 

 

Page 35: BCA Construction Quality Assessment System

 

R4 – 1 Oct 2021   

35 

CONQUAS® 2019

We shape a safe, high quality, sustainable and friendly built environment

  Item*    Standards 

     2l  MET  1) Surface finish grade as per project’s specifications     2) Visual finish surface to be planed and sanded          3) Knot size tolerance:

a) Domestic grade ‐ Not more than 20 mm diameter b) Industrial and Standard grade ‐ Not more than 50 mm 

diameter  

    4) Voids to be filled if specified         5) No damages e.g. dents         6) Crack tolerance:

a) Domestic grade ‐ Not more than 200 mm long and 2 mm width 

b) Industrial and Standard grade ‐ Not more than 400 mm long and 4 mm width 

         7) Hollowness not applicable for exposed MET elements 

      

* An item is deemed to have failed if any one of the standards is not met 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 36: BCA Construction Quality Assessment System

 

R4 – 1 Oct 2021   

36 

CONQUAS® 2019

We shape a safe, high quality, sustainable and friendly built environment

  Item*    Standards 

     3  Ceilings        3a  General Requirements  1) Finishing      No stain marks       Consistent colour tone       No patchy surface          2) Alignment & Evenness      Overall surface should be smooth, even, not wavy       Straightness of corners          3) Crack & Damages      No visible damage e.g spalling, leaks, cracks, etc          4) Roughness      No rough surface          5) Jointing      Consistent, aligned and neat     3b  Skim Coats / Boarded 

Ceiling 1) Not patchy, with no pin holes and with no trowel marks 

    2) Formwork joints are grounded smooth         3) Paintwork with good opacity and with no brush marks          4) Access door joints should be sharp and in consistent width     3c  False ceiling / Grid System  1) Alignment of rails should be visually straight     2) Surface should be overall level and even         3) Chipped surfaces or corners should not be seen           3d  MET  1) Surface finish grade as per project’s specifications     2) Visual finish surface to be planed and sanded          3) Knot size tolerance:

a) Domestic grade ‐ Not more than 20 mm diameter b) Industrial and Standard grade ‐ Not more than 50 mm 

diameter  

    4) Voids to be filled if specified         5) No damages e.g. dents         6) Crack tolerance:

a) Domestic grade ‐ Not more than 200 mm long and 2 mm width 

b) Industrial and Standard grade ‐ Not more than 400 mm long and 4 mm width 

          

Page 37: BCA Construction Quality Assessment System

 

R4 – 1 Oct 2021   

37 

CONQUAS® 2019

We shape a safe, high quality, sustainable and friendly built environment

  Item*    Standards 

     4  Doors        4a  General Requirements  1) Joints & Gap      No visible gaps between door frame and wall        Consistent & neat joints       Consistent gap between door leaf and frame and not more 

than 5mm       No visible gaps within door leaf and door frame       Consistent and no visible gaps for mitre joints          2) Alignment & Evenness      Alignment/level with walls        Door frame and leaf to flush       Door and frame corners maintained at right angles       No rattling sound when door is closed          3) Material & Damages      No stain marks and any visible damage        No sags, warps on door leaf       Fire stop provided where necessary       Door joints and nail holes filled up, properly sanded down 

and with good paint finish (including on top and bottom of door leaf and consistent in colour) 

      Glazing clean and evenly sealed with gasket       No sign of corrosion for metal frame       Consistent colour tone          4) Functionality      Ease in opening, closing and locking       No squeaky sound during swinging the leaf          5) Accessories Defects      Lock sets with good fit and no stains         No sign of corrosion in ironmongery       No missing or defective accessories                      Note 1: Civil defence shelter door will be considered as        part of wall finishes           Note 2: Metal gate will be assessed as component                                              

* An item is deemed to have failed if any one of the standards is not met 

Page 38: BCA Construction Quality Assessment System

 

R4 – 1 Oct 2021   

38 

CONQUAS® 2019

We shape a safe, high quality, sustainable and friendly built environment

  Item*    Standards      5  Windows        5a  General Requirements  1) Joints & Gap      No visible gap between window frame and wall       Consistent gap between window leaf and frame and not 

more than 5mm (timber window only)       No visible gaps within window leaf and frame       No visible gaps between window leaf and frame       Neat joint between window and wall internally and 

externally       Consistent and no visible gaps at mitre joints          2) Alignment & Evenness      Alignment / level with wall openings       Window leaf and frame corners maintained at right angles          3) Material & Damages      No stain marks and any visible damage / defects       Louvre windows with glass panels of correct lengths       Glazing clean, evenly sealed with putty or gasket for 

aluminium windows          4) Functionality      Ease in opening, closing and locking       No sign of rainwater leakage       No squeaky sound during swinging the leaf          5) Accessories Defects      Lock sets with good fit and aligned       No sign of corrosion       No missing or defective accessories       Countersunk screws levelled and flushed. No over‐tightened 

screws       Stainless steel screws at hinges for swing window      

* An item is deemed to have failed if any one of the standards is not met 

 

 

 

 

 

 

 

 

 

Page 39: BCA Construction Quality Assessment System

 

R4 – 1 Oct 2021   

39 

CONQUAS® 2019

We shape a safe, high quality, sustainable and friendly built environment

  Item*    Standards      6  Components  1) Internal fixtures such as wardrobe, kitchen cabinet, vanity top, 

mirror, bathtub, water closet, shower screen and basin          2) External fixtures such signage, emergency lightings, railings, 

unit number plates, lift fittings, letter box, lightings, metal gate etc 

     6a  General Requirements  1) Joints & Gap      Consistent joint width & neat joint       No visible gap       Welding joints grounded or flushed          2) Alignment & Evenness      Level and in alignment          3) Material & Damages      No stain marks       No visible damage / defects       Consistent in colour tone          4) Functionality      Functional, secured and safe          5) Accessories Defects      No missing accessories       No sign of corrosion       No visible damages / defects      

* An item is deemed to have failed if any one of the standards is not met 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 40: BCA Construction Quality Assessment System

 

R4 – 1 Oct 2021   

40 

CONQUAS® 2019

We shape a safe, high quality, sustainable and friendly built environment

Basic M&E Fittings 

  Item*    Standards   1  General Requirements  1) Joints & Gap    No visible gap     Consistent joint width & neat        2) Alignment & Evenness    Aligned, leveled and straight        3) Material & Damages    No visible damage / defects     No stain marks     Securely fixed     Consistent colour tone        4) Functionality    Functional and safe        5) Accessories Defects    No missing accessories     No visible damage / defects    

   2  Plumbing & Sanitary Fittings    2a  Gully & Floor Trap  1) No damage or chokage       2) Must be securely fixed       3) Trap's top lower than the surrounding floor level       2b  Pipes  1) Visually aligned horizontally, vertically and parallel to building 

surface        2) Inclined pipes laid to proper gradients       3) No leakage at joints       4) Plumb < 10mm / storey height       5) Brackets firmly secured & adequately spaced        6) If painted, no drippings & with good opacity    2c  Fittings  1) Firmly secured & joints properly sealed & pointed        2) No leakage at joints   

* An item is deemed to have failed if any one of the standards is not met 

 

 

Page 41: BCA Construction Quality Assessment System

 

R4 – 1 Oct 2021   

41 

CONQUAS® 2019

We shape a safe, high quality, sustainable and friendly built environment

  Item*    Standards        3) No chipping or cracks       4) No paint drops or mortar droppings       5) Fittings in working condition       6) Accessible for maintenance       7) Do not cause obstruction / pose as safety hazard (e.g. sprinkler 

head to point inward).        8) No sediments / particles found in water collected at terminal 

water fittings (remove aerator & showerhead).        9) All sensor covers properly sealed against water seepage       10) Materials used are of approved types   

   3  M&E Fittings  e.g. power point, telephone point, air‐con diffuser, fan coil unit, 

lighting, smoke alarm, sprinkler heads, CCTV camera, etc.    3a  Installation  1) Fittings must be aligned and location as per approved drawings.       2) No stains       3) Neat patch‐up for pointing / penetration    3b  Safety  1) No exposed wiring within reach   3c  Damages  1) No visible damage      

* An item is deemed to have failed if any one of the standards is not met 

 

 

 

 

 

 

 

 

 

 

Page 42: BCA Construction Quality Assessment System

 

R4 – 1 Oct 2021   

42 

CONQUAS® 2019

We shape a safe, high quality, sustainable and friendly built environment

Appendix 2 

QUALITY STANDARDS FOR EXTERNAL FINISHES WORKS 

Roof 

  Item*    Standards 

1  Construction        1a  General Requirements  1) Stain / Painting      No stain marks       Good paint works          2) Rough / Uneven / Falls      Look smooth and with no tool marks       Even and level esp no potential in tripping       Good falls in right direction          3) Crack / Chip / Damage      No visible damages / defects          4) Joint / Sealant / Alignment      Consistent joint width, neat & aligned          5) Chokage / Ponding      No sign of chokage and ponding          6) Construction      No sign of leaking       Proper dressing for any protrusion       Neat & secured installation of fixtures      1b  Flat Roof  1) Ponding less than 3mm         2) Surface to level to avoid tripping         3) Proper dressing for any protrusion         4) Openings to be sealed to prevent pest invasion          5) Clean and no stain marks     1c  Pitched Roof  1) No leaking         2) No rust or stains          3) Good painting to roof structural members          4) Roof tiles in alignment         5)

 6)  7) 

Openings to be sealed to prevent pest invasion  Consistent colour tone  Proper dressing for any protrusion 

Page 43: BCA Construction Quality Assessment System

 

R4 – 1 Oct 2021   

43 

CONQUAS® 2019

We shape a safe, high quality, sustainable and friendly built environment

 

  Item*    Standards 

     1d  Waterproofing (exposed)  1) Should be evenly installed, no sharp protrusion     2) Complete adhesion to base         3) Good laps at joints and proper vertical abutment details          4) No leaking and sign of damage to membrane/coating          5) Clean and no mortar stains         6) No paint defects     1e  Gutters  1) No ponding and chokage          2) No cracks, chips and any other visible damages / defects          3) RWDP inlet should be lower than the surrounding gutter 

invert level          4) Gutter and RWDP inlet to be covered to prevent chokage

where practical          5) Clean and no cement stains               

* An item is deemed to have failed if any one of the standards is not met 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 44: BCA Construction Quality Assessment System

 

R4 – 1 Oct 2021   

44 

CONQUAS® 2019

We shape a safe, high quality, sustainable and friendly built environment

External Wall 

   Item*  

 Standards 

     1  General Requirements  1) Evenness / Roughness      Overall surface should be even, not wavey & not patchy          2) Staining / Painting      No visible stain marks       Good paint works          3) Cracking / Damages      No visible damage / defects          4) Jointing / Alignment      External features visually in alignment       Corners of wall maintained at right angles and straight       Consistent joint width, neat & aligned      2  Plaster Finish  1) As above     3  Tiled Finish  1) Tile joints aligned and between 2‐4mm wide unless specified         2) Plumb tolerance and evenness of surface (3mm / 1.2m)      4  Claddings / Curtain Walls  1) Gaps around openings to be properly sealed     2) Joints of regular widths as specified         3) Plumb tolerance as specified         4) Evenness of surface, no dents or scratches          5) Sealant material compatible with cladding      5  Facing Brickwork  1) 10mm joint with pointing         2) Weepholes are provided as specified         3) No mortar droppings and other stains         4) No efflorescence                              

* An item is deemed to have failed if any one of the standards is not met 

 

 

 

Page 45: BCA Construction Quality Assessment System

 

R4 – 1 Oct 2021   

45 

CONQUAS® 2019

We shape a safe, high quality, sustainable and friendly built environment

   Item*  

   Standards 

               6  Architectural Coating  1) Substrate ‐ see plaster finish         2) Finished texture and colour to be uniform          3) No paint drips and other stains     7  Painting  1) Substrate ‐ see plaster finish         2) Surfaces are evenly painted; no patchiness due to touch up work         3) Good opacity, no discolouring and free from peeling      8  Fair‐Faced Concrete  1) No exposed aggregate         2) Consistent tonality when viewed as a whole           9  MET  1) Crack tolerance:

a) Domestic grade ‐ Not more than 200 mm long and 2 mm width 

b) Industrial and Standard grade ‐ Not more than 400 mm long and 4 mm width 

          

* An item is deemed to have failed if any one of the standards is not met 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 46: BCA Construction Quality Assessment System

 

R4 – 1 Oct 2021   

46 

CONQUAS® 2019

We shape a safe, high quality, sustainable and friendly built environment

External Works 

   Item*  

 Standards 

     1  General Requirements  1) No stain marks and visible damages / defects   (basis for assessment)       2) Finishes must be even, level , align & consistent          3) Consistent joints width and neat         4) Paintworks with good opacity, no patchiness and brush 

marks          5) Constructed according to Contract Specifications          6) Fixtures installed must be safe, secured and functional          7) Standards defined under Part 1: Internal Finishes, Part 2: 

Roof and Part 3: External Wall shall apply for similar items          8) MET (Mass Engineered Timber) standards applied for MET 

finishes as in Part 1 Internal Finishes      1a  Link‐Way / Shelter  1) Floor as per Internal Finishes ‐ Floor          2) Column as per Internal Finishes ‐ Wall         3) Ceiling as per Internal Finishes – Ceiling         4) Other Finishes as per Internal Finishes – Components          5) M&E Fitting as per M&E Works – Part 5 Basic M&E 

Fittings      1b  Apron & Drain  1) Drain      Free flowing and no ponding of water          2) Drain Cover      level and do not jolt or rock       Gaps between drain covers and side of drain between 5‐

10mm wide       Drain grating properly painted          3) Apron 1      Bitumen joints with neat edges and sufficient length       No ponding          4) Apron 2 – as per Apron 1         5) Inspection Chamber      Inspection chambers are level with surrounding without 

depression and with tolerance of       Covers to be level with frames      

Page 47: BCA Construction Quality Assessment System

 

R4 – 1 Oct 2021   

47 

CONQUAS® 2019

We shape a safe, high quality, sustainable and friendly built environment

 

   Item*  

   Standards 

     1c  Roadwork & Carpark  1) Side Drain as per 1b Apron & Drain          2) Road Surface      No ponding       Road painting according to drawings; dimensional tolerance 

of 5mm       Gaps between aeration slabs properly filled up with sand       Aeration slabs stable and not broken          3) Kerbs – as per General Requirements         4) Road Sign      Provided according to specifications       Firm and secured at base – with footing if required       Metal parts below ground are corrosion treated          5) Lightings – as per 1c Road Sign     1d  Footpaths & Turfing  1) Footpath as per Internal Finishes ‐ Floor         2) Turfing      No depression or bald patches       Turfing done evenly, no dead grass or weeds          3) Lightings as per 1c Road Sign         4) Fencing & Railing      As per 1c Road Sign       Wire fencing is PVC covered       Footings provided for supports       Vertical tolerance (4mm / 1.2m)          5) Other Fixtures      as per Internal Finishes ‐ Components      1e  Playground  1) Floor as per Internal Finishes ‐ Floor          2) Permanent Fixture1 as per Internal Finishes ‐ Components         3) Permanent Fixture2 as per Internal Finishes ‐ Components         4) Lightings as per 1c Road Sign         5) Signage as per Internal Finishes ‐ Components                     

 

Page 48: BCA Construction Quality Assessment System

 

R4 – 1 Oct 2021   

48 

CONQUAS® 2019

We shape a safe, high quality, sustainable and friendly built environment

   

Item*  

 

Standards 

     1f  Court  1) Floor 1 as per Internal Finishes ‐ Floor          2) Floor 2 as per Internal Finishes ‐ Floor         3) Signage as per Internal Finishes ‐ Components          4) M&E Fitting as per M&E Works – Part 5 Basic M&E Fittings         5) Permanent Fixture as per Internal Finishes ‐ Components     1g  Fences & Gates  1) Fence Left as per 1d – item 4)          2) Gate as per Internal Finishes ‐ Components          3) Fence Right as per 1d – item 4)         4) M&E Fitting as per M&E Works – Part 5 Basic M&E 

Fittings          5) Signage as per Internal Finishes ‐ Components      1h  Swimming Pool  1) Side Drain as per Internal Finishes ‐ Floor           2) Foot Path 1 as per Internal Finishes ‐ Floor          3) Floor Path 2 as per Internal Finishes ‐ Floor          4) M&E Fitting as per M&E Works – Part 5 Basic M&E 

Fittings          5) Other Fixture as per Internal Finishes ‐ Components      1i  Club House  1) External Wall 1 as Part 3 External Wall          2) External Wall 2 as Part 3 External Wall         3) External Wall 3 as Part 3 External Wall         4) External Wall 4 as Part 3 External Wall         5) Apron & Drain as per 1b                                        

 

 

Page 49: BCA Construction Quality Assessment System

 

R4 – 1 Oct 2021   

49 

CONQUAS® 2019

We shape a safe, high quality, sustainable and friendly built environment

   Item*  

 Standards 

     1j  Guard House  1) External Wall 1 as Part 3 External Wall          2) External Wall 2 as Part 3 External Wall         3) Apron & Drain as per 1b         4) Gantry as per Internal Finishes ‐ Components          5) Other Fixture as per Internal Finishes ‐ Components      1k  Electrical Substation  1) External Wall 1 as Part 3 External Wall          2) External Wall 2 as Part 3 External Wall         3) External Wall 3 as Part 3 External Wall         4) External Wall 4 as Part 3 External Wall         5) Apron & Drain as per 1b          

* An item is deemed to have failed if any one of the standards is not met 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 50: BCA Construction Quality Assessment System

 

R4 – 1 Oct 2021   

50 

CONQUAS® 2019

We shape a safe, high quality, sustainable and friendly built environment

Appendix 3 

QUALITY STANDARDS FOR MATERIAL & FUNCTIONAL TESTS 

Material & Functional Tests 

  Item*    Standards                1  Field Window Water‐

tightness Test 1) No sign of leakage using BCA's Window Water‐tightness 

Test method. Leakage is defined as “any appearance of uncontrolled water, other than condensation, on the indoor face of any part of the wall & window”. 

         2) BCA's Water‐tightness Test parameters:

 Water intensity: 300mm/hr                          : 1 litre/min/m of joint Wind Pressure: 240 Pa Nozzle inclination: 90o to window 1 sample = 2m length of joint Spray duration: 10 minutes 

     2  Wet Area Water‐tightness 

test (i.e. Bathrooms, toilets & flat roof) 

1) No sign of leakage after ponding wet areas over a minimum period of 24 hrs. 

         2) Ponding with final finish in‐place     3  Internal wet area 

waterproofing process 1) According to approved method statement, shop drawings and 

related BCA’s Good Industry Practices guides      4  Tiling installation process  1) According to approved method statement, shop drawings and 

related BCA’s Good Industry Practices guides      5  Timber flooring installation 

process 1) According to approved method statement, shop drawings and 

related BCA’s Good Industry Practices guides      6  Windows installation 

waterproofing process 1) According to approved method statement, shop drawings and 

related BCA’s Good Industry Practices guides           7  Pull‐off test (POT)for 

internal wall tiles 1) Minimum tensile strength of 0.15 N / mm2 

     

* An item is deemed to have failed if any one of the standards is not met.  

 

 

 

 

Page 51: BCA Construction Quality Assessment System

 

R4 – 1 Oct 2021   

51 

CONQUAS® 2019

We shape a safe, high quality, sustainable and friendly built environment

For the assessment of the field window water‐tightness test, the number of points shall be 

awarded based on the percentage of non‐compliance as tabulated in the table below : 

Points Awarded for BCA Field Test (100%) 

Percentage of non‐compliance 

N  0% 

(15‐x)* N/15  0% < x < 15% 

0  ≥ 15% 

Note:  No points shall be given if test is not carried out. 

  “N” is the maximum points for WTT test under the respective building categories 

            “x” is the percentage of samples failed. 

For the assessment of the wet area water‐tightness test, the number of points shall be awarded 

based on the percentage of non‐compliance as tabulated in the table below : 

Points Awarded for BCA Field Test (100%) 

Percentage of non‐compliance 

N  0% 

(2‐x)* N/2  0% < x < 2% 

0  ≥ 2% 

 

Note:  No points shall be given if test is not carried out. 

“N” is the maximum points for wet area water tightness test under the respective building 

categories 

“x” is the percentage of samples failed. 

 

 

 

 

 

 

 

 

 

Page 52: BCA Construction Quality Assessment System

 

R4 – 1 Oct 2021   

52 

CONQUAS® 2019

We shape a safe, high quality, sustainable and friendly built environment

Appendix 4 

Defects Grouping Guide for Assessment of Internal Finishes  

Element  Defects Grouping  Defects Description 

Floor  Finishing Stains, Painting / Coating Defects, Tonality, Patchy & Roughness 

Wall  Alignment & Evenness  Alignment, Unevenness, Squareness 

  Crack & Damages  Crack, Chip, Dent, Scratches 

  Hollowness / Delamination   

  Jointing  Joints, Pointing 

Ceiling  Finishing  Stains, Painting / Coating Defects, Patchy 

  Alignment & Evenness   

  Crack & Damages  Crack, Chip, Dent, Scratches 

  Roughness   

  Jointing  Joints, Pointing 

Door  Joints & Gap  Joints, Gap etc. too big, Inconsistent, Improper Seal

Window  Alignment & Evenness   

Component  Material & Damages Crack, Chip, Dent, Scratches, Defects, Finishing, Tonality 

M&E Fittings  Functionality Movement, Functionality, cannot be opened or closed properly, Loose 

  Accessories Defects Missing items, Improper Fixing, Stains, Corrosion, Other damages 

 

 

 

 

 

 

 

 

Page 53: BCA Construction Quality Assessment System

 

R4 – 1 Oct 2021   

53 

CONQUAS® 2019

We shape a safe, high quality, sustainable and friendly built environment

Appendix 5 

BUILDING GROUPING GUIDE  

     

Private Residential Public 

Residential Non Residential 

   

In General : All types of residential residential building built by private developers 

HDB Public Residential building 

In General : All types of building constructed mainly for non‐residential use 

e.g.    e.g. 

Condominium    Bank 

Apartments    Office Building 

Bungalow    Shopping Complex 

Semi‐Detached    Hotel 

Terrace House    Supermarket 

Cluster Residential    Airport 

Mixed Development    Hospital 

with residential component more than 50%  by GFA 

  University 

    Regional Library 

    Conference Hall 

    Arts and Cultural Centre 

    Mixed Development 

   with more than 50% non‐residential area by GFA 

 

Note: The above is only meant to be a general guide in determining the Category of project. 

The  actual  grouping  might  vary  depending  on  the  project  details  in  the  application.  For 

instance,  a  private  mixed  development  building  project,  i.e.,  one  with  commercial  and 

residential components in the development, is categorized as Private Residential.  

 

 

   

Page 54: BCA Construction Quality Assessment System

 

R4 – 1 Oct 2021   

54 

CONQUAS® 2019

We shape a safe, high quality, sustainable and friendly built environment

CONQUAS 2019 Revision Log

Rev Description Released Date

*Date Effective

RD Draft for feedback 08 Oct 2019 Not applicable

R0 Launch for Implementation 20 Dec 2019 20 Dec 2019

R1 Amendment to Para 2.1b(ii)

For projects that adopt PPVC, a maximum of 30% of the total window water-tightness test samples and 20% of the total wet area water tightness test samples will be carried out in the factory.

Amendment to footnote 3 of Table A

The initial CONQUAS score will be derived after 20% (for tier 2a) and 50% (for tier 2b) of the required architectural internal finishes samples are completed.

27 Dec 2019 20 Dec 2019

R2 3.3. Bonus points page 21

(b) Certified QM/CONQUAS personal

Added new note 3

The QM/CONQUAS manager/supervisor shall demonstrate commitment and satisfactory performance during the project duration pertaining to quality and CONQUAS assessment issues. It is the responsibility of the certified personnel to ensure the project personnel attend all allocated CONQUAS training, assessments are completed, and submission of documents done timely. They should conduct themselves in a professional manner when dealing with feedback on defects related to workmanship quality, failing which, CONQUAS bonus points will not be awarded.

9 April 2020 1 April 2020

R3 1.2. Scope of CONQUAS Inserted note that

30 April 2020

30 April 2020

Page 55: BCA Construction Quality Assessment System

 

R4 – 1 Oct 2021   

55 

CONQUAS® 2019

We shape a safe, high quality, sustainable and friendly built environment

Private residential developments include private mixed developments with residential component Replaced all mention of “housing” with “residential”

R4 3.3 Bonus points page 20

(a) Design/Material Choices Updated PPVC requirement

Use of Prefabricated Prefinished Volumetric Construction (at least 65% of coverage)

Updated MEP requirement

Use of prefabricated MEP plant modules

1 Oct 2021 1 Oct 2021

* Applicable to projects with tender called on and after this date.