BC HydroNet MeteringProgram
December 2016 Alevtina Akbulatova
![Page 2: BC Hydro Net Metering Program - Amazon S3](https://reader031.fdocuments.us/reader031/viewer/2022022717/621a6d9f9c064737d05d1c47/html5/thumbnails/2.jpg)
Solar Map of Canada
2
Insolation
BC = 1,100 kWh/kW
Japan = 1,125 kWh/kW
Germany = 848 kWh/kW
Source: http://www.nrcan.gc.ca/
![Page 3: BC Hydro Net Metering Program - Amazon S3](https://reader031.fdocuments.us/reader031/viewer/2022022717/621a6d9f9c064737d05d1c47/html5/thumbnails/3.jpg)
Solar PV – what to expect
• Generate 1,100 kWh per
year, or ~ 200 kWh per 2-
month billing period
• Cost $3,000-4,000 to install
4 solar PV panels = 1 kW (1,000 W)
3
Average BC house consumes 11,000 kWh per year
![Page 4: BC Hydro Net Metering Program - Amazon S3](https://reader031.fdocuments.us/reader031/viewer/2022022717/621a6d9f9c064737d05d1c47/html5/thumbnails/4.jpg)
How Net Metering Works?
4
![Page 5: BC Hydro Net Metering Program - Amazon S3](https://reader031.fdocuments.us/reader031/viewer/2022022717/621a6d9f9c064737d05d1c47/html5/thumbnails/5.jpg)
Smart Meters
http://www.bchydro.com/energy-in-bc/projects/smart_metering_infrastructure_program.html#how meters work
5
![Page 6: BC Hydro Net Metering Program - Amazon S3](https://reader031.fdocuments.us/reader031/viewer/2022022717/621a6d9f9c064737d05d1c47/html5/thumbnails/6.jpg)
• Started in 2004
• Tariff Rate Schedule 1289
• Eligibility:
• Residential and commercial customers
• Up to 100 kW
• Clean and renewable energy source (solar, wind, hydro)
• Open application window – come when you are ready
• Simple process, no cost to interconnect to the grid*
• Requires full load displacement before payment (annual basis)
• Annual excess electricity is paid at a rate of 9.99 cents/kWh
• Technical requirements = DGTIR/100
• Electricity flow is measured by Smart Meter
Net Metering (NM) at BC Hydro
6
![Page 7: BC Hydro Net Metering Program - Amazon S3](https://reader031.fdocuments.us/reader031/viewer/2022022717/621a6d9f9c064737d05d1c47/html5/thumbnails/7.jpg)
Net Metering in Numbers
As of December 2016:
875 customers –
~ 5.2 MW installed capacity:
• 847 solar PV (>96%)
• 13 Hydro
• 9 Wind
• 4 Wind & PV
• 1 Biogas
• 1 Hydro & PV
PV90%
Hydro8%
Wind<1%
Wind & PV
< 1%
Biogas<1%
By Installed Capacity
7
![Page 8: BC Hydro Net Metering Program - Amazon S3](https://reader031.fdocuments.us/reader031/viewer/2022022717/621a6d9f9c064737d05d1c47/html5/thumbnails/8.jpg)
Solar PV Growth in BC*
8
*connected through BC Hydro Net Metering
0
1,000
2,000
3,000
4,000
5,000
0
100
200
300
400
500
600
700
800
900
2004 2006 2008 2010 2012 2014 2016
kW
Year# of customers capacity, kW
# cust
![Page 9: BC Hydro Net Metering Program - Amazon S3](https://reader031.fdocuments.us/reader031/viewer/2022022717/621a6d9f9c064737d05d1c47/html5/thumbnails/9.jpg)
1. Simple NM Application – 1-page application form
2. Electrical Inspection document - FINAL
• Certificate of Electrical Inspection, or
• Electrical Contractor Authorization & Declaration of
Compliance
NM Requirements – Simple
9
![Page 10: BC Hydro Net Metering Program - Amazon S3](https://reader031.fdocuments.us/reader031/viewer/2022022717/621a6d9f9c064737d05d1c47/html5/thumbnails/10.jpg)
Simple Net Metering
10
![Page 11: BC Hydro Net Metering Program - Amazon S3](https://reader031.fdocuments.us/reader031/viewer/2022022717/621a6d9f9c064737d05d1c47/html5/thumbnails/11.jpg)
1. Application:
• Complex Application form
• Single Line Diagram
• Site Plan
• Protection Settings*
2. Electrical Inspection document
3. Field Verification Test ($)*
4. Declaration of Compatibility (DoC)*
5. Payment for Incremental Interconnection costs ($)*
Complex Net Metering
11
![Page 12: BC Hydro Net Metering Program - Amazon S3](https://reader031.fdocuments.us/reader031/viewer/2022022717/621a6d9f9c064737d05d1c47/html5/thumbnails/12.jpg)
Top 3 installations by size:
• Alert Bay 67 kW (5 systems)
• Masset 40 kW (2 systems)
• Qualicum Beach 29 kW
Solar Net Metering by Local Governments
37 municipal customers with solar PV + 8 applications
12
Regional Districts:
• Capital District
• Comox Valley
• Cowichan Valley
• Squamish-Lillooet
• Thompson-Nicola
![Page 13: BC Hydro Net Metering Program - Amazon S3](https://reader031.fdocuments.us/reader031/viewer/2022022717/621a6d9f9c064737d05d1c47/html5/thumbnails/13.jpg)
Complex Installs: Municipalities
13
City of Kamloops, 24 kW
Little River (Comox), 8 kW
Fire Hall, Qualicum Beach, 29 kW
![Page 14: BC Hydro Net Metering Program - Amazon S3](https://reader031.fdocuments.us/reader031/viewer/2022022717/621a6d9f9c064737d05d1c47/html5/thumbnails/14.jpg)
BC Hydro Offers At a Glance
We purchase electricity from small and clean or renewable energy
projects throughout B.C. through the following programs:
14
![Page 15: BC Hydro Net Metering Program - Amazon S3](https://reader031.fdocuments.us/reader031/viewer/2022022717/621a6d9f9c064737d05d1c47/html5/thumbnails/15.jpg)
Contact
15
www.bchydro.com/netmetering www.bchydro.com/microsop
[email protected] [email protected]
Alevtina Akbulatova – 604-623-3878