European strawbale building methods
1. General information Evaluation of best building practices
Method of construction: Loadbearing ID: LB-01
Representative: amazonails, Bee Rowen
Contact: Hope Mill, Crescent St, Todmorden OL14 5HA, UK
+44 845 458 2173, [email protected] www.amazonails.org.uk
Tabel of Content1. General information
2. Visual description of the method-1
3. Visual description of the method -2
4. Technical drawings 2D
5. Explanation of the method
6. Calculation sheet
7. Questionnaire
8. Sustainability
9. Evaluation sheet
Personal quotation
load bearing is great, great, and great. Isn't it ?
1- General Date: 27/05/2011 Page 1
European strawbale building methods
2. Visual description of the method-1 Evaluation of best building practices
3D – 1
Method of construction: Loadbearing ID: LB-01
Representative: amazonails, Bee Rowen
Contact: Hope Mill, Crescent St, Todmorden OL14 5HA, UK
+44 845 458 2173, [email protected] www.amazonails.org.uk
2-Visual 3D Date: 27/05/2011 Page 2
European strawbale building methods
3. Visual description of the method -2 Evaluation of best building practices
3D – 2
Method of construction: Loadbearing ID: LB-01
Representative: amazonails, Bee Rowen
Contact: Hope Mill, Crescent St, Todmorden OL14 5HA, UK
+44 845 458 2173, [email protected] www.amazonails.org.uk
3-Visual 3D_2 Date: 27/05/2011 Page 3
European strawbale building methods
4. Technical drawings 2D Evaluation of best building practices
Representative: amazonails, Bee Rowen Hope Mill, Crescent St, Todmorden OL14 5HA, UK
Method of construction: Loadbearing ID: LB-01
Contact: +44 845 458 2173, [email protected] www.amazonails.org.uk
!!!! Without scale !!!!
4- Visual 2D_2 Date: 27/05/2011 Page 4
European strawbale building methods
5. Explanation of the method Evaluation of best building practices
Method of construction: Loadbearing ID: LB-01
Representative: amazonails, Bee Rowen
Contact: Hope Mill, Crescent St, Todmorden OL14 5HA, UK
+44 845 458 2173, [email protected] www.amazonails.org.uk
I. Building ground floor, first floor and roof structure on the ground
II. Wall raising under roof cover - ground floor level
II. Wall raising under roof cover - first floor level
5- Explanation of the method Date: 27/05/2011 Page 5
European strawbale building methods
6. Calculation sheet Evaluation of best building practices
Method of construction: Loadbearing ID: LB-01
Representative: amazonails, Bee Rowen
Contact: Hope Mill, Crescent St, Todmorden OL14 5HA, UK
+44 845 458 2173, [email protected] www.amazonails.org.uk
Material amounts per choosen wall area of: m m
Total wall area 22.397 m² Wall length 4.140 Wall height 5.410 m
Total wall volume 8.063 m³ Wall thickness 0.360 m
Strawbales 8.063 m³
Wood 0.570 m³
Laminated timber m³
Regular timber 0.570 m³
Metal parts kg/m2
Costs of material and labour Calculated in subject to the conditions of the producing country
Total 182.62 €/m2
Labour
input/
Material
costs/sqm
Labour
costs/ sqm
Total costs/
sqm
Straw bales, everything
included h 15.75 26.33 42.08 €/m2
[1]Wood: Posts and beams,
boards, everything included h 15.68 34.57 50.26 €/m2
Outside complete: Limeplaster h 44.67 €/m2
Inside complete: Clayplaster h 45.63 €/m2
[1] Material costs for metal parts and screws etc. included in Labour costs
[2] Material costs for metal parts and screws etc. included in material costs
15.75 26.3342.0815.68
34.57
50.26
44.67
45.63
0.00
20.00
40.00
60.00
80.00
100.00
120.00
140.00
160.00
180.00
200.00
Material costs/sqmLabour costs/ sqm Total costs/ sqm
EU
R/m
²
Costs without painting per sqm
Costs of material and labour
Inside complete: Clayplaster
Outside complete: Limeplaster
Wood: Posts and beams, boards,
everything included
Straw bales, everything included
6- Calculations Date: 27/05/2011 Page 6
European strawbale building methods
7. Questionnaire Evaluation of best building practices
Method of construction: Loadbearing ID: LB-01
Representative: amazonails, Bee Rowen
Contact: Hope Mill, Crescent St, Todmorden OL14 5HA, UK
+44 845 458 2173, [email protected] www.amazonails.org.uk
1
2
3
4
Ideally 450x350x1050mm bales baled by MF 130 baling machine. Density
= 120kg/m3. MC < 16% dry basis, 18% wet basis
Bottom of the first row of bales at each floor level is lifted above the
floor at least 30mm by draining baseplate
External protection (trees – natural wind breaks) wherever possible.
Extremely exposed walls are always timber clad. Less exposed walls are
limeplastered with Beeck external paint finish.
Fixation of bales
Bales
Stuffing all the gaps with loose straw + vertical and horizontal
compression of loadbearing system
1.1 How are your bales secured in the wall?
Loadbearing walls = compression + hazel stubs in baseplate and wallplate +
roofplate pinned by hazel pins
3.1 How do you deal with potential of rain bouncing from the ground
surface and ground humidity?
Bottom of the first row of bales is lifted above the ground at least
350mm.3.2 How do you deal with possibility of water intrusion from building’s
interior at each floor level?
3.4 How do you protect your wall during it’s construction from
weather?
4.1 What are your criteria of bale quality (shape, density, moisture
content…)? Give the borderline values.
Window frame includes timber corner protections “ears” to each side of
the sill and double window sill has drip edge.
3.3 How do you protect straw in your walls against wind driven rain?
Bales without gaps
Moisture
2.1 How do you ensure tightness of the strawbale wall insulation
(stuffing gaps between bales with loose straw for example)?
Amazonails system allows for wallrizing under finished roof (see appendix
B). Horizontal rain is sheltered by scaffolding wrapped in tarps, which is
built along the whole perimeter of the building.3.5 How do you prevend water leakage at the window sill detail?
7- Questionnaire Date: 27/05/2011 Page 7
European strawbale building methods
7. Questionnaire Evaluation of best building practices
Method of construction: Loadbearing ID: LB-01
Representative: amazonails, Bee Rowen
Contact: Hope Mill, Crescent St, Todmorden OL14 5HA, UK
+44 845 458 2173, [email protected] www.amazonails.org.uk
5
6
7
Hessian overlapping the joint at least 300mm over to each side
5.3 In case of unsing Boards, etc. What is important for you?
Airtightness
Wall coating with plaster or boards
First layer of lime plaster/render is pushed into straw by hand.
5.2 How do you ensure that your plaster/render (if included in your
wall’s assembly) doesn’t crack over connection of two different
supporting materials (for example timber-straw connection)?
5.1 How do you ensure bond of the plaster/render (if included in your
wall’s assembly) with the straw?
6.1 What do you do to secure airtightness of the walls? Wall to ceiling,
opening or ground floor. Is there a blowerdoor test?
Timber is notched into strawbales
Fire resistance
7.1 How do you protect the walls from fire, while building and after? Do
you refer to official approvals?
25mm thick lime plaster on the inside + 25mm thick lime render on the
outside
7- Questionnaire Date: 27/05/2011 Page 8
European strawbale building methods
8. Sustainability Evaluation of best building practices
Method of construction: Loadbearing ID: LB-01
Representative: amazonails, Bee Rowen
Contact: Hope Mill, Crescent St, Todmorden OL14 5HA, UK
+44 845 458 2173, [email protected] www.amazonails.org.uk
Primary energy demand non renewable (PED) for construction
and total transmission heat loss after 50 years
THL [kWh/m2]
674
THL fp=0,6 [kWh/m2]
404
PED [kWh/m2]
81
CO2- Balance for construction
CO2- Balance [kg CO2 eq./m2]
-94
U- Value and acidification potential
U- Value [W/m2K]
0.171
Acidification [kg SO2 eq./m2]
0.153
8- Sustainability Date: 27/05/2011 Page 9
European strawbale building methods
9. Evaluation sheet Evaluation of best building practices
Method of construction: Loadbearing ID: LB-01
Representative: amazonails, Bee Rowen
Contact: Hope Mill, Crescent St, Todmorden OL14 5HA, UK
+44 845 458 2173, [email protected] www.amazonails.org.uk
Assessment value Present Validation
Technical propertiesThermal behaviour
Thermal resistance R [K·m²/W] ≥ 5,7 [at λ=0,051] 8.87 ����
Fire behaviour
Fire resistance ≥ REI 30 ? o
Moisture behaviour
Approved absence of mould [1], [2], [3] ? o
Sound insulation
Rw [dB] ≥ 44 ? o
Airtightness
Blowerdoortest passed n50 < 1,5 (air change at 50pa) ? o
Costs/ EffortLabour input [h/m²] < 15 h/m² (too less!?) 5.00 ����
Labor costs [ EUR/m²] < 125 EUR/m² 60.90 ����
Material costs [ EUR/m²] <125 EUR/m² 31.43 ����
Total costs [EUR/m2] <250 EUR/m² 182.62 ����
SustainabilityCO2-Storage [Kg/m²] > 60 68.73 ����
PED nre [kWh/m²] < 100 41.76 ����
Wood usage [kg(m²]
Metal usage [kg/m²]
Professional executionFixation of bales ����
Handling/ installing of bales ����
Protection to moisture/ water ����
bouncing from ground ����
intrusion from interior floors etc. ����
during construction ����
at wall openings ����
Bale quality [Quality Assurance] ����
Cladding ����
Plaster ����
Boards/ other ����
[1] visual examination of installed straw after years.
[2] Microbiological investigation in laboratory of installed straw
[3] General approval for mould absence
9- Evaluation Sheet Date: 27/05/2011 Page 10
General
Wall length 4.000 m
Wall height 4.485 m
Total wall area 17.940 m²
Wall thickness 0.450 m
Total wall volume 8.073 m³
1 Strawbales 8.073 m³
2 Wood
posts 8.970 m
profile 0.010 m²
Volume of posts 0.090 m³
beams 32.000 m
profile 0.015 m²
Volume of beams 0.480 m³
bracings 0.000 m
profile m²
Volume of bracings 0.000 m³
Total length of above 40.970
Total volume of above 0.570
3 Boards
roofplate, wallplate - smartply 18mm
length 16.000
width 0.460
Area 7.360
3 Metal parts
Screws normal quality [m]
smaller ones (< 5x120mm) 1.00 m
larger ones 2.00 m
Screws (special ones or stainless steal) [m]
smaller ones (< 5x120mm) 0.00 m
larger ones 0.00 m
Nails [kg]
smaller ones (< 120mm)
larger ones 2.00 kg
Other metal parts pieces or overall 0.00 kg
4 Plaster reinforcements m²
fiberglass mesh 0.00 m²
jute/ hessian/ hemp … 7.20 m2
5 Reed (Base for plaster over timber parts) 2.40 m²
others [which one]
6 Total workload 5h