Bays Precinct Needs Analysis May 2012 Consultation 2 Part 1...Bays Precinct Needs Analysis May 2012...
Transcript of Bays Precinct Needs Analysis May 2012 Consultation 2 Part 1...Bays Precinct Needs Analysis May 2012...
Prepared by the Government Architect’s Office for Bays Precinct Taskforce 09.05.12
BAys PrecincT TAskfOrce - neeDs AnALysis - suB-PrecincTscOmmuniTy cOnsuLTATiOn 2
Bays Precinct Taskforce - Community consultation 2 - may 2012 - 2
sub-precincts
nOrTH
AnALysis
White Bay
Glebe island
White Bay Power station
rozelle railyards
rozelle Bay - commercial maritime
Blackwattle Bay - commercial & recreational
Glebe island Bridge
study area
Bays Precinct Taskforce - Community consultation 2 - may 2012 - 3
exisTinG
White BayWhite Bay ports area
cruise pasenger teminal under construction
White Bay 6: refuelling
existing open space
Water use: port activity
Water use: commercial
Water use: recreational
Layup area/ bulk liquids/ harbour uses
Port entry
existing road
internal port road
Bus route
existing pedestrian/ cycle links
residential interface
industrial interface
Views
cliff/ steep slope
existing contours
Precinct study area
0 25 50 100 250m
nOrTH
1.1.
1. recent views created from demolition of White Bay sheds
Bays Precinct Taskforce - Community consultation 2 - may 2012 - 4
exisTinG
White Bay
Bays Precinct Taskforce - Community consultation 2 - may 2012 - 5
neeDs AnD PrOPOsALs
White Bay
White Bay Port area
cruise passenger terminal
cruise passenger overflow
Baileys marine: refuelling
future long term parking for cruise
Port entry
Layup area/ harbour uses
Port operations including tugs, lines boats
Water use: port activity
Water use: commercial
Water use: recreational
residential interface
martin Bright steels residential development
Harbour
Proposed pedestrian access stairs (tbc)
existing pedestrian/ cycle links
Open space (existing)
existing roads
internal port road
Proposed access roads
Precinct study area
0 25 50 100 250m
nOrTH
Bays Precinct Taskforce - Community consultation 2 - may 2012 - 6
OPPOrTuniTies
White Bay
Passenger terminal and
marine refuelling facility
Port operations
Glebe island
Adaptive reuse: White Bay
Power station
Potential public boat ramp
Potential open space
Water use: port activity
Water use: maritime uses
Water use: recreational
Dragon boats
rowers
Port entry
Proposed fence separating public boat ramp & Glebe island port area
Proposed access roads
foreshore access points
Potential public foreshore access non-port daysPotential pedestrian/ cycle links
Possible transport infrastructureexisting pedestrian/ cycle linksexisting open space
1. cruise passenger terminal, overflow area & marine refuelling facility
2. Potential use of northern edge of White Bay 6 for future pedestrian path and harbour vantage point.
3. Port services including tugs, lines boats4. Adaptive reuse: White Bay Power
station with improved public access and integration with White Bay foreshore
1
2
3
4
nOrTH
Bays Precinct Taskforce - Community consultation 2 - may 2012 - 7
PreceDenTs
White Bay
Bays Precinct Taskforce - Community consultation 2 - may 2012 - 8
exisTinG
rozelle railyards
0 25 50 100 250m
marshalling yards
existing buildings
existing open space
existing road
Heavy freight rail line
existing pedestrian/ cycle links
Bus route
Light rail
Light rail stop
residential interface
industrial interface
infrastructure interface
Harbour
Views
cliff/ steep slope
existing contours
Precinct study area
nOrTH
Bays Precinct Taskforce - Community consultation 2 - may 2012 - 9
exisTinG
rozelle railyards
Bays Precinct Taskforce - Community consultation 2 - may 2012 - 10
neeDs
rozelle railyardsTransport corridor
existing open space
existing road
Proposed access roads
Heavy freight rail line
existing pedestrian/ cycle links
Bus route
Light rail
future light rail to Dulwich Hill
Light rail stop
key links to public tranport
Proposed residential development (Gosford Quarries site)
residential interface
industrial interface
infrastructure interface
Precinct study area
nOrTH
0 25 50 100 250m
Bays Precinct Taskforce - Community consultation 2 - may 2012 - 11
OPPOrTuniTies
rozelle railyardsPotential development/mixed uses
Adaptive reuse: White Bay Power station
Potential open space
Water use: commercial
Water use: recreational
Transport corridor under
key access points
Proposed access roadsPotential pedestrian/ cycle links
future light rail extension
existing light rail
existing light rail stop
existing pedestrian/ cycle links
existing open space
Harbour
1. Transport corridor under green lid including potential m4 extension and light rail
2. Green lid pedestrian and cycle corridor connecting to White Bay, rozelle Bay and iron cove (via Lilyfield road - green street with cycleways). Active and passive recreation.
3. Potential development opportunity, mixed use, along green corridor. key access points at major streets from Lilyfield and Leichhardt/Annandale
rOZeLLe BAy
12
3
nOrTH
0 25 50 100 250m
Bays Precinct Taskforce - Community consultation 2 - may 2012 - 12
PreceDenTs
rozelle railyards
central Artery, Boston Temporary container city, christchurch Temporary container city, christchurch
Bays Precinct Taskforce - Community consultation 2 - may 2012 - 13
exisTinG
White Bay Power stationexisting Power station buildings
Heritage listed items1. White Bay Power station (state listed)2. silos3. WWii monument, Glebe island Plaque and sandstone quarry sample4. Glebe island Bridge Western abutment
existing open space
existing road
existing pedestrian/ cycle links
Bus route
residential interface
industrial interface
Water use: port activity
Water use: maritime uses
Water use: commercial
Water use: recreational
Harbour
Views
cliff/ steep slope
existing contours
Precinct study area
1.
2.
3.4.
nOrTH
0 25 50 100 250m
Bays Precinct Taskforce - Community consultation 2 - may 2012 - 14
exisTinG
White Bay Power station
Bays Precinct Taskforce - Community consultation 2 - may 2012 - 15
neeDs AnD PrOPOsALs
White Bay Power station
nOrTH
existing Power station buildings
Heritage listed items1. White Bay Power station (state listed)2. silos3. WWii monument, Glebe island Plaque and sandstone quarry sample4. Glebe island Bridge Western abutment
existing open space
Port entry
existing road
Proposed access roads
existing pedestrian/ cycle links
Bus route
martin Bright steelsdevelopment site
residential interface
industrial interface
Water use: port activity
Water use: maritime uses
Water use: commercial
Water use: recreational
Harbour
Precinct study area
1.
2.
3.
4.
0 25 50 100 250m
Bays Precinct Taskforce - Community consultation 2 - may 2012 - 16
OPPOrTuniTies
White Bay Power station
Port use
maritime uses
mixed use/ adaptive reuse of White Bay Power station
Potential open space
Water use: port activity
Water use: maritime uses
Water use: recreational
Dragon boats
rowers
Port entry
Proposed access roads
Proposed fence separating public boat ramp & Glebe island port area
foreshore access points
Potential public foreshore access non-port days
Potential pedestrian/ cycle links
Possible transport infrastructure
Possible local bus link
existing pedestrian/ cycle links
existing open space
HarbournOrTH
Bays Precinct Taskforce - Community consultation 2 - may 2012 - 17
PreceDenTs
White Bay Power station
Tate modern, London carriageworks, redfern, sydney Tate modern, London cockatoo island, sydney Harbour