Bauer panama presentacion completa julio 2010

39
1 Maschinen Bau Resources passion for progress

Transcript of Bauer panama presentacion completa julio 2010

Page 1: Bauer panama presentacion completa julio 2010

1

MaschinenBau Resources

passion for progress

Page 2: Bauer panama presentacion completa julio 2010

2

Resources

Construction Equipment

BAUER Group Services, equipment & products dealing with ground and groundwater

Target ~ 42 % of

total Group

revenues Market leader

in specialist

foundation

equipment 85 % of revenues

from sales abroad Multi-branding

strategy

Target ~ 42 % of

total Group revenues

Global provider

for specialist foundation

engineering

and related construction

services such as

structure remediation and

bridge building

Focus on complex,

international projects

Target ~ 16 % of

total Group revenues Third segment, installed in

second quarter 2007

Activities in the field of

environmental services, mining,

geothermal energy, well drilling

and well engineering materials

Page 3: Bauer panama presentacion completa julio 2010

3

BAUER Resources GmbH

Capital: 10 Mio. EUR

BAUER Aktiengesellschaft

Capital: 73,0 Mio. EURManagement Board: Prof. Thomas Bauer, Heinz Kaltenecker, Hartmut Beutler, Mark Schenk

51,81 % 48,19 %

BAUER Maschinen GmbH

Capital: 26,5 Mio. EUR

Schachtbau Nordhausen GmbH

Capital: 10,2 Mio. EUR

99 %

SPESA Spezialbau und

Sanierung GmbHCapital: 1,9 Mio. EUR

99 %

Family Bauer Free float

99 %99 %

BAUER Spezialtiefbau GmbH

Capital: 37,1 Mio. EUR

99 %

SegmentEquipment

SegmentResources

SegmentConstruction

Page 4: Bauer panama presentacion completa julio 2010

4

Longstanding healthy business developmentTotal Group revenues 1980 - 2008

43%

0

200

400

600

800

1000

1200

1400

1600

1980 1982 1984 1986 1988 1990 1992 1994 1996 1998 2000 2002 2004 2006 2008

Total: 1,527

Special deep foundationSpecial c

onstructio

n

Equ

ipm

ent

583

100

713Res

ou

rces

131

in EUR million

Note: 1980 – 2002 based on HGB figures, from 2003 based on IFRS figures; figures after deducting Other/Eliminations/Consolidations

compound annual growth rate ~ 9.5 %

Page 5: Bauer panama presentacion completa julio 2010

5

in EUR million

Domestic 379 (332 27 %*)

Total Group revenues 1.527 million € Domestic / Overseas - FY 2008

BAUER AG - Group

in EUR million

Overseas 1.148 (876 73 %*)

* = prior year

Mio. Euro

Inland 379 (332 27 %*)

Mio. Euro

Ausland 1.148 (876 73 %*)

* = Vorjahr

75 %

25 %

Page 6: Bauer panama presentacion completa julio 2010

6

Total Group revenues 1.527 million €

Breakdown by segmentsFY 2008

BAUER AG - Group

in EUR million

Construction Domestic 98 ( 98 8 %*)

Construction Overseas 485 (331 27 %*)

* = prior year

Equipment

Construction Domestic

Constructions Overseas

in EUR million

Special Construction 100 ( 80 7 %*)

Equipment 713 (592 49 %*)

Resources 131 (107 9 %*)

Special Construction

Resources

Page 7: Bauer panama presentacion completa julio 2010

7

Total Group revenues 1.527 million € (1.208*)geographical breakdown - FY 2008

BAUER AG - Group

in EUR million

Germany 380 (332 - 27%*)

EU (w/o Germany) 306 (230 - 19%*)

Europe other 140 ( 72 - 6%*)

* = prior year

in EUR million

Middle East 236 (212 - 18%*)

Far East 173 (135 - 11%*)

America 181 (157 - 13%*)

Other 111 ( 70 - 6%*)

America

Middle East

Far East

EU excl. Germany)Other

Germany

Europe other

Page 8: Bauer panama presentacion completa julio 2010

Subsidiaries

BAUER Spezialtiefbau GmbH

Subsidiaries Worldwide

Page 9: Bauer panama presentacion completa julio 2010

USA

Tanzania

Thailand

Malaysia

Indonesia

Singapore

Hong Kong

Philippines

France

UAE

Saudi-Arabia

Egypt

Lebanon

Austria

Poland

Hungary Romania

SpainIran

Kuwait

Switzerland

Ireland

Bulgaria

UkraineNetherlands

Czech Rep.

Slovakia

Sudan

Russia

New Zealand

QatarGuatemala

Slovenia

Chile

Argentina

Iraq

India

Germany

Latvia

Libya

Canada

Australia

VietnamNigeria

Pakistan

Angola

England

Algeria

South Africa

Turkey

Djibouti

Italy Serbia

Overseas Division

Subsidiaries

Panamá

Page 10: Bauer panama presentacion completa julio 2010

BST - Strategy Development of Regional Networks

Panamá

Page 11: Bauer panama presentacion completa julio 2010

11

Bauer Fundaciones Panamá S.A

-Introduction - BAUER Fundaciones Panamá, S.A

-Equipment Technology, Methodology

-Reference Projects

Page 12: Bauer panama presentacion completa julio 2010

BAUER Fundaciones Panamá Starting operations Nov 2006

Equipment:•2 No. Drilling Rigs BG 22

•2 No. Drilling Rigs BG 28

•1 No. Drilling Rig KLEM

•1 No. Drilling Rig UBW 08

•2 No. Deep Vibrator Rigs

•Local staff and labors:74 employees

Projects under execution

• 22 Real Estate Buildings

• 22 Infrastructure Projects

12

Projects executed

• 4 Infrastructure Projects Panamá

Page 13: Bauer panama presentacion completa julio 2010

Bucket

Rock auger

Core barrel

Rock auger

BucketCasing Shoe

Equipment Technology, MethodologyRotary Drilling with Kelly - Equipment

Page 14: Bauer panama presentacion completa julio 2010

Piling

Continuos Flight Auger System

Page 15: Bauer panama presentacion completa julio 2010

CONSTRUCTION METHOD MAIN APPLICATIONS FEATURES

Driven Piles (generally) cohesive soils and loose sands

high pile quality can be guaranteedbecause of pre-cast concrete elements orsteel piles (Larsen, etc.)

Improvement of soil during installation dueto displacement of soil

low settlements

very noisy work

Grab construction, fully cased Soil such as sand and gravels with highdemands on casing technology

Where it is economically viable to usechisels to break up bedrock and boulders

Minimum distance to existing buildings isrequired

Pile diameter generally ranging from 620to 2000 mm

Depths generally up to 50 m

Rotary drilling with Kelly, fully cased All types of soil

Where site conditions are restricted

Vibration free drilling

High output by casings installed by rotarydrive

casings depth down to 20 m

standard diameter 620 to 1500 mm

Drilling close to existing buildings

Rotary drilling with Kelly and Oscillator, fullycased

All types of soil

Where site conditions are restricted

Vibration free drilling

casings depth down to 50 m

diameter less than 2000 mm

Drilling close to existing buildings

Rotary drilling with Kelly, borehole supported byhydrostatic pressure

In all types of soil

Large diameter piles

Deep piles

Vibration free drilling

No casing required

Starter casing used for top section only

Wall of borehole supported by bentonite orpolymer slurry

Borehole diameter generally 300 to 3000mm

Depth generally up to 40 m, but greaterdepths possible

Vertical piles only

Piles

Rotary Drilling with Kelly

Rotary Drilling using continuos flight auger

Page 16: Bauer panama presentacion completa julio 2010

Installation of the temporary casing

with the rotary driveof the drill rig

Excavation of the soil with the drill bucket, stabilisation of the

borehole with slurry( bentonite or polymere

)

Cleaning the slurrywith the desander

Installation of the reinforcement cage

by the auxiliarywinch of the drill rig

Pouring the con-crete into the bore-hole through the

tremie pipe. Remove slurry by pumping back to the tank

Remove temporary casing with the

rotary drive of the drill rig

Uncased Drilling Method- Hole supported by hydrostatic pressure

Page 17: Bauer panama presentacion completa julio 2010

Fully Cased Drilling with Oscillator

Drill and push the casings into the ground

with the rotary drive (and attached oscillator)

Drill with the rotary tools: bucket, auger or core barrel. Stabilised the

wall of the bore with the casing

Install reinforcement cage with the auxiliary

winch of the drill rig into the bore stabilised by the

casings

Pour concrete through the tremie pipe into the

cased borehole

Extract the casing with the rotary drive during concreting (with the os-

cillator)

Page 18: Bauer panama presentacion completa julio 2010

Oscillator attached to the drill rig :• hydraulic power supply from the base machine of

the rig• the oscillator is locked to the undercarriage of the

rig. During installation of the casing the total weight of the rig acts as a reaction mass which improves

the pushing force.

Fully Cased Drilling with Oscillator

Page 19: Bauer panama presentacion completa julio 2010

Rotary drilling using Flight Auger - Equipment

Page 20: Bauer panama presentacion completa julio 2010

Drilling with Continuous Flight Auger (CFA)

Beton

Drilling with CFA auger. Soil is continuously transported from the tip of the auger upwards by the flights. The

borehole is stabilised by the auger filled with soil.

After reaching the final depth the auger is withdrawn and concrete is pumped through the hollow stem with the concrete pump.

Remove the excavated soil with a hydrau-lic excavator. Push or vibrate the reinforce-

ment cage into the freshly poured pile.

Page 21: Bauer panama presentacion completa julio 2010

Anchors

Page 22: Bauer panama presentacion completa julio 2010

Grouting

Page 23: Bauer panama presentacion completa julio 2010

Ductile Driven Pile System

Pipe joint, comprising conicalsocket and spigot

Head plate fixed to the pile head

The driving shoe ensures that cobbles and other small obstructions are displaced or crushed when necessary during driving

Page 24: Bauer panama presentacion completa julio 2010

Ductile Driven Pile System

Skin friction pile:Cement grout is pumped through the ductile pipe during pile driving and injected continuously

through the driving shoe.Excavated grouted section of a

skin friction pile: BAUER ductile pile foundation immediately

adjacent to an existing building

Page 25: Bauer panama presentacion completa julio 2010

Ductile Driven Pile System

Advantages over other Foundation Techniques

· Short installation period· Simple site set-up

· Minimal requirements with regard to working platform and

access· No additional site traffic due to

suppliers· No drill spoil

· Minimal wastage due to adaptability of ductile pipes

· No work required on pile head, piles are immediately cut back to their exact cut-off level with

a disc cutter· Very low wear and tear on

equipment

Ductile piles being installed in the Hotel Summit Golf & Resort in Panamá

Page 26: Bauer panama presentacion completa julio 2010

Reference Projects in PanamáHydroelectric Dos Mares

26

Project Data:Owner: GDF SuezClient: Norberto Odebrecht

BAUER‘s Scope of Works:Tangent Pile wall ⱷ 1.82m : 984 mIntermittent pile wall ⱷ 0.91m: 170 mFoundation piles ⱷ 0.61m: 180 m Active Anchors: 1692 mPassive Anchors 18180 mShotcrete : 1316 m3soil: Sand rock

Techniques: Drilling with Kelly bar- 2 No.BG 28 and drilling rig KLEM for the anchors . For the soil nails 4 No. Small drilling rigs

Page 27: Bauer panama presentacion completa julio 2010

27

Reference Projects in PanamáHydroelectric Dos Mares

Page 28: Bauer panama presentacion completa julio 2010

28

Reference Projects in PanamáHydroelectric Dos Mares

Page 29: Bauer panama presentacion completa julio 2010

29

Reference Projects in PanamáHydroelectric Dos Mares

Page 30: Bauer panama presentacion completa julio 2010

30

Reference Projects in PanamáHydroelectric Dos Mares

Page 31: Bauer panama presentacion completa julio 2010

31

Reference Projects in PanamáHydroelectric Baitún- Bajo de Mina

Page 32: Bauer panama presentacion completa julio 2010

32

Reference Projects in PanamáHydroelectric Bajo de Mina

Page 33: Bauer panama presentacion completa julio 2010

33

Reference Projects in PanamáPuente Río Cochea BAUER‘s Scope of Works:Owner: GDFSuez 24 piles ⱷ 1.37m , max depth: 20mClient: Odebrecht

Page 34: Bauer panama presentacion completa julio 2010

34

Reference Projects in PanamáCorredor Duarte- República Dominicana Owner: OPRET BAUER‘s Scope of Works:Client: Norberto Odebrecht 108 piles ⱷ 1.37m , max depth: 30m

Page 35: Bauer panama presentacion completa julio 2010

35

Reference Projects in PanamáPuerto Balboa

Page 36: Bauer panama presentacion completa julio 2010

36

Reference Projects in PanamáPuerto Balboa

Page 37: Bauer panama presentacion completa julio 2010

37

Reference Projects in PanamáPuerto Cruceros Colón 2000

Page 38: Bauer panama presentacion completa julio 2010

PanamáCinta Costera – Avenida Balboa

Page 39: Bauer panama presentacion completa julio 2010

PanamáCinta Costera – Avenida 3 de Nov