Bates House
-
Upload
olivera-andulajevic -
Category
Documents
-
view
221 -
download
0
Transcript of Bates House
-
7/28/2019 Bates House
1/11
Fold Guide
Optional - Cut out windows (leaving the center rails). Build the window inserts and glue in place behind
each window and door opening. Note - Mother is in the front, top, l eft window.
5B 5B
8A
Insert tabs through slots
and glue down tabs
Apply a small amount of glue to top corners and
top edges. Insert tabs through slots of 5A, 2B and 2C.
DO NOT GLUE DOWN TABS YET!
Score and fold the edges of
5A, 2B and 2C as shown.
Apply a small amount of glue to bottom corners and
top edges of roof parts 6A and 6B.
Position roof parts so TABS ARE OUTSIDE (see inset)!
When roof is in position, glue down tabs.
2B 2C
5A
6B
6B
6A
6A
Apply a small amount of glue
to top corners and edges.
Apply a small amount
of glue to bottom
corners and edges.
Assemble roof parts 6A and 6B.
TABS ARE OUTSIDE!
4A1A
3A
2A 2A
3A7A
7B
A
Please note that this project is not recommended for children. It requires a moderate degree of skill, and the use of a cutting blade, which is extremely dangerous.
When using cutting blades always use protective eyewear. This model was designed to be printed on Matte Paper Heavyweight, and the use of white glue is recommended.
Black dashed lines represent a mountain fold (a fold which point upward), and orange dashed lines represent a valley fold (the fold points downward). The orange dashed lines are
accompanied by a red + at each end. These are to be used as pin guides. Poke small holes at the +, flip the sheet over, and score between the holes for a clean valley fold.
Read the instructions and study the illustrations carefully before beginning.
A free project from http://www.haunteddimensions.raykeim.com
-
7/28/2019 Bates House
2/11
B
Apply a small amount of glue to bottom
corners and top edges of tower roof 5C.
Position roof parts so
TABS ARE OUTSIDE (see inset)!
When roof is in position,
glue down tabs.
5C
5C
8E
8D
8C
4H
4C
8B 4J
4J
4B
6C
Completed Model
6C
4B
4B x 2
6C x 2
4F & 4G
4F & 4G
4D4D
4iAssemble tower roof parts 5C and dormer 4D.
Insert tabs in slot
then glue down tabs.
Attach beneath side door.
Attach to side of porch.
Apply glue to
tabs then insert.
TABS ARE OUTSIDE!
-
7/28/2019 Bates House
3/11
1 of 9
slots
"Mother" window
Porch
7B here
1A
4A
-
7/28/2019 Bates House
4/11
2 of 9
slots
slots
slots
2A
2C
2B
A free project from http://www.haunteddimensions.raykeim.com
-
7/28/2019 Bates House
5/11
3 of 9
3A
Attachpiece
2A
here
A free project from http://www.haunteddimensions.raykeim.com
-
7/28/2019 Bates House
6/11
4 of 9
to3A
4A
4B 4B
4C
4D
4i
4H
4J
4F 4G
slots
A free project from http://www.haunteddimensions.raykeim.com
-
7/28/2019 Bates House
7/11
5 of 9
slots
slots
slots slots
slots5C
5A
5B
A free project from http://www.haunteddimensions.raykeim.com
-
7/28/2019 Bates House
8/11
6 of 9
slots
slotsslots
slotsslots
slots
6A
Front
Back
6B
6C
6C
A free project from http://www.haunteddimensions.raykeim.com
-
7/28/2019 Bates House
9/11
7 of 9
7A
7B
A free project from http://www.haunteddimensions.raykeim.com
slots
slots
-
7/28/2019 Bates House
10/11
8 of 9
8A
8B*
8B
8D*
8C*
8C
8E 8E*
8D
8A*
* for optional transparency printingA free project from http://www.haunteddimensions.raykeim.com
-
7/28/2019 Bates House
11/11
9 of 9
Mother
Side Door
Front Door
Tower front
Tower
side
Optional window insertsA free project from http://www.haunteddimensions.raykeim.com