Batch v Lean 1 piece flow training

16
Lean 1-Pc Flow vs Batch & Que Production August 12, 2012 Developed by Julian Kalac, P.Eng Lean Six Sigma Master Black Belt 1

description

Training with Before and After pictures

Transcript of Batch v Lean 1 piece flow training

Page 1: Batch v Lean 1 piece flow training

Lean 1-Pc Flow vs Batch & Que Production

August 12, 2012

Developed by Julian Kalac, P.Eng

Lean Six Sigma Master Black Belt

1

Page 2: Batch v Lean 1 piece flow training
Page 3: Batch v Lean 1 piece flow training

5 S IN B-VENT AREA-BEFORE

3

Page 4: Batch v Lean 1 piece flow training

BEFORE 5 S

4

Page 5: Batch v Lean 1 piece flow training

B-VENT AFTER 5-S

5

Page 6: Batch v Lean 1 piece flow training

B-VENT AFTER 5 S

6

Page 7: Batch v Lean 1 piece flow training

Process/Material Flow

Page 8: Batch v Lean 1 piece flow training

8

Page 9: Batch v Lean 1 piece flow training

Source: Improve Phase 26jul07

Bottleneck Management

• Bottleneck

– The point which is currently reducing the flow or slowing the entire process

–A managed buffer before a bottleneck is necessary

–A bottleneck WILL exist in every process

–Bottlenecks move !

–High WIP can mask the bottleneck

– The people working at the bottleneck take breaks, not the bottleneck

Page 10: Batch v Lean 1 piece flow training

• Workers can do each others work, help out when someone is sick, on holidays, quit

• Workers help improve bottleneck operations by helping out each other

• Variety in work making it more full-filling

• Training new workers

Benefits of cross functionally trained workers

Page 11: Batch v Lean 1 piece flow training

QUESTION ON CYCLE TIME

40 min

20 min 25 min

15 min

30 min

1

5 4

3

2

•What is the process cycle time? •What is the process bottleneck?

Page 12: Batch v Lean 1 piece flow training

HOW TO SET-UP 1-PC FLOW?

• GET ALL YOUR NEEDED MATERIAL BEFORE YOU START!!

• Set-up equipment as close as possible together so you can pass parts without using boxes

• Eliminate WIP BOXES

• Set-up a white board and record hourly PPMH compared to target.

• List any issues you have during the run

• Run 1 order at a time in the cell until it’s completed and then next order

12

Page 13: Batch v Lean 1 piece flow training

13

Page 14: Batch v Lean 1 piece flow training

10 min exercise on Batch and 1 Pc flow

14

Page 15: Batch v Lean 1 piece flow training

Next we set-up 1-pc flow in components

15

Page 16: Batch v Lean 1 piece flow training

| | 16