Note : SEISMIC ANALYSIS IN X DIR Node and corresponding reac NODE REACTION(T) 1 2225.7 2 0 3 0 4 0 5 0 6 0 7 0 8 0 9 0 10 0 11 0 12 0 13 0 14 0 15 0 16 0 17 0 18 0 19 0 20 0 21 0 22 0 23 0 24 0 25 0 26 0 27 0 0 TOTAL 2225.7 T Values in Red color should be Values in Green Should not be Check the comments in Blue b

description

base shear column

Transcript of Base Shear Calculations 144base shear

Page 1: Base Shear Calculations 144base shear

Note :SEISMIC ANALYSIS IN X DIR

Node and corresponding reactions can be copied and pasted from STAAD Analysis

NODE REACTION(T)

1 2225.72 03 04 05 06 07 08 09 0

10 011 012 013 014 015 016 017 018 019 020 021 022 023 024 025 026 027 0

0

TOTAL 2225.7 T

Values in Red color should be entered by the UserValues in Green Should not be editedCheck the comments in Blue before further design

Page 2: Base Shear Calculations 144base shear

Node and corresponding reactions can be copied and pasted from STAAD Analysis

TOTAL SLABS = 13

LOAD ON COLUMNS = 2226 x 1 = 28934.10 T

SHEAR WALL LOADSELF WT = 0.1 Water tank 0

LOAD ON SWALL = 0.1 lift machine 0LMR & etc = 0 0.00 T

0.20 T 2 SHEAR WALLS = 0.40 T

TOTAL LOAD SLABS all slabs = 0.40 + 28934.10 + 0.00 = 28934.50 T

color should be entered by the User Should not be edited

Check the comments in Blue before further design

Page 3: Base Shear Calculations 144base shear

Load DetailsLoad per floor = 28934.5

Area of one floor = 617 Soil type 2

Intensity of loading = 3.607 ( factored )

Live load = 0.2

Dead Load = 2.2049Fos = 1.5

Weight of top roof = 0.00 T

Building Dimensions

L = 26.00 mB = 33.00 mH = 38.35 mn = 13 (no of storeys including GF)h = 3.00 m (height of each floor)

H(top) = 63.00m ( Total height including top floor )

Seismic CoefficientsZ = 0.1I = 1.0

R = 3.0I / R = 0.333333

0.09 x H = 0.677d

2.009

mm2

T/m2

T/m2

T/m2

Ta =

Sa / g =

Page 4: Base Shear Calculations 144base shear

Rock & hard 1

Medium 2Soft soils 3

Table - 2 ( Zone Factor Z)

II III IV VIntensity Low Moderate severe Very severe

Z 0.1 0.16 0.24 0.36

for rock & hard 1+ 15 T for 0.00<= T <=0.12.5 for 0.10<= T <=0.4

1.0 / T for 0.4<= T <=4.0

CAT - 1 CAT - 2 CAT - 31 1 1

Rock and hardfor medium 1+ 15 T for 0.00<= T <=0.1 -1 -1 02.5 for 0.10<= T <=0.55

1.36 / T for 0.55<= T <=4.0 1 1 1medium-1 -1 0

for soft soils 1+ 15 T for 0.00<= T <=0.12.5 for 0.10<= T <=0.67 1 1 1

soft soil1.67 / T for 0.67<= T <=4.0 -1 -1 0

0.677 rock & hard for medium soft soils

0 0 00 0 0

1.477 2.009 2.4670 2.009 0

Sa / g =

Ta =

Page 5: Base Shear Calculations 144base shear

Rock and hard

medium

soft soil

Page 6: Base Shear Calculations 144base shear

Calculation of Floor Load

Area of one floor = 617

Intensity of loading = 3.607343Working load = 3.607343

=2.401.5

Live load = 0.2

Dead Load = 2.204895

0.25 % of LL = 0.20 x 0.25 x 617.0 = 30.85 T DL = 617.00 x 2.20 = 1360.42 T

Total = 1392.00 T / floor Weight of top roof = 0.00 T

Calculation of Base Shear

L = 26.00 mB = 33.00 mH = 38.35 mn = 13 (no of storeys including GF)h = 3.00 m (height of each floor)

H(top) = 63.00m

0.09 x H = 0.677d

Design Horizontal seismic coefficients

Z = 0.1I = 1.0

R = 3.0I / R = 0.333333

2.0092

0.1 x1.0x2.0090.0335

2 R g 2 x 3.0

Design Base shear

Seismic weight of building ( W )= 13x 1392.00 + 0.00

= 18096.000 T

18096.00 x 0.0335 = 606.000 T

mm2

T/m2

T/m2

T/m2

T/m2

Ta =

Sa / g =

Ah = Z I S

a

Vb = A

h x W =

Page 7: Base Shear Calculations 144base shear

Floor12 1392 63 5524.848 80.71511 1392 60 5011.200 73.21110 1392 57 4522.608 66.0729 1392 54 4059.072 59.3018 1392 51 3620.592 52.8957 1392 48 3207.168 46.8556 1392 45 2818.800 41.1815 1392 42 2455.488 35.8734 1392 39 2117.232 30.9313 1392 36 1804.032 26.3562 1392 33 1515.888 22.1461 1392 30 1252.800 18.3030 1392 27 1014.768 14.825-1 1392 24 801.792 11.714-2 1392 21 613.872 8.968-3 1392 18 451.008 6.589-4 1392 15 313.200 4.576-5 1392 12 200.448 2.928-6 1392 9 112.752 1.647-7 1392 6 50.112 0.732-8 1392 3 12.528 0.183-9 1392 0 0.000 0.000

Total = 41480.208 606.000

Qi = V

b x W

iH

i2

WiH

i2

Wi ( T ) Hi ( M ) WiHi2 x 103 Qi ( T )

Page 8: Base Shear Calculations 144base shear

63 606 41480.21

3 606 41480.213 606 41480.213 606 41480.213 606 41480.213 606 41480.213 606 41480.213 606 41480.213 606 41480.213 606 41480.213 606 41480.213 606 41480.213 606 41480.213 606 41480.213 606 41480.213 606 41480.213 606 41480.213 606 41480.213 606 41480.213 606 41480.213 606 41480.213 606 41480.213 606 41480.213 606 41480.213 606 41480.213 606 41480.213 606 41480.213 606 41480.213 606 41480.21

Values in Green Should not be edited

Page 9: Base Shear Calculations 144base shear

CROSS CHECK FOR FX AND Sa/g

Fx (T) from STAAD4.56 0.882 14.994 0.819

2.632 2.944 2.313 2.2615.332 0.859 0.676 1.3065.378 0.846 0.678 2.216

2.88 2.71 2.717 2.172.622 3.68 2.75 1.1762.622 0.856 0.635 0.8922.879 0.836 0.637 3.7025.465 2.886 2.913 2.764

5.43 18.809 0.65 1.2492.642 5.761 1.48 0.764

4.76 5.712 0.774 0.811.651 17.668 0.641 205.4051.531 0.85 0.869 183.6373.082 4.512 0.925 98.0752.621 3.254 0.921 98.6183.072 3.272 0.8461.519 4.684 3.0681.633 0.891 0.9063.904 0.884 0.8481.537 4.53 2.981.527 3.113 0.8993.776 3.065 0.8261.375 4.191 1.6341.448 0.776 1.4061.434 15.45 0.8941.298 4.848 0.780.985 4.8232.1352.102

83.832 123.592 49.66 605.864 863 T

Fx = 863 T

Fx 8630.029826Fy 28934.5

% RATIO 2.982599

OKSa / g 2.009175