Barton Elementary School Community Meeting
May 24, 2018
Presented by Alan Reising, Executive Director
Facilities Development and Planning
Long Beach Unified School District
MEASURE E - PLANNING
Ø June 16, 2016, LBUSD Facility Master Plan updated § $3.5 Billion of need identified
Ø June 23, 2016, LBUSD Board approved a $1.5 billion
bond measure for ballot
Ø November 8, 2016 voters approved Measure E with a 75% Yes vote
Ø Measure E will only cost $5 per $100,000 of property value per month
2
History
Long Beach Unified School District
MEASURE E - PLANNING Areas Addressed
Ø HVAC System Installation Ø Utility Upgrades Ø ADA – Accessibility Upgrades Ø Elevators Ø Fire Alarm Upgrades Ø Intercom, Clocks, Speakers (Measure K) Ø Ceiling/Wall Mounted Projectors/AV System Ø Ceiling Repair Ø Interior Lights Ø Interior and Exterior Painting Ø New windows Ø Other State Funded Repairs
Ø Potential for $300M in matching funds
3
Long Beach Unified School District
MEASURE E - PLANNING Track and Field Upgrades
Ø New Synthetic/All-Weather Field
Ø New Synthetic Running Track
Ø Bleacher/Stadium Upgrades or
Replacement
Ø ADA Upgrades
Ø Lighting Upgrade or Installation
4
Long Beach Unified School District
MEASURE E - PLANNING New Aquatic Centers
5
Ø New 50 M x 25 YD Competition Pool
Ø New Shower/Locker Room Facilities
Ø New Restrooms
Ø Aquatic Coaches Offices
Ø Spectator Bleachers
Long Beach Unified School District
MEASURE E - PLANNING Interim Housing
InterimHousingSites
Monroe
Ke6ering
Riley
Prisk
JordanPlus
Butler
Rogers
Webster
6
Long Beach Unified School District
MEASURE E - PLANNING
7
Planning Process (Continuous)
Phasing Plan
Phase 3 Begin Summer 2018 Phase 4
Begin Summer 2019 Phase 2
Begin January 2018
• Cleveland – HVAC • Garfield – HVAC • Kettering – HVAC • Riley – HVAC • Rogers – HVAC • Stephens – HVAC
• Barton – HVAC • Burcham – HVAC • Jefferson – HVAC
• Keller – HVAC • Lakewood – HVAC • Lindsey – HVAC • Longfellow – HVAC • Lowell – HVAC
• MacArthur – HVAC • Mann – HVAC • McKinley – HVAC • Millikan – New 1000 Bldg. • Poly Bleachers • Prisk-Interim Housing
• Webster – HVAC
• Alvarado – HVAC • Bixby – HVAC • Cubberley – HVAC • Hughes – HVAC • Madison – HVAC • Muir – HVAC • Naples-HVAC • Prisk-HVAC • Wilson – HVAC
Long Beach Unified School District
MEASURE E - PLANNING
87
Barton ES Construction Plan
Ø All students TK-5th grade will stay on site
Ø HVAC project expected to start in Summer 2018 and be completed in 12 months
Ø Support spaces such as kitchen/cafeteria, and administration to be completed during summer time
Ø Working Hours: Monday through Friday 7:00 AM to 4:30 PM
Long Beach Unified School District
MEASURE E - PLANNING
9
Barton ES– Aerial
Long Beach Unified School District
MEASURE E - PLANNING Project Team
10
Architect: GBA
Mechanical/Plumbing Engineer: Pocock Design Solutions
Electrical Engineer: Pacific Engineers Group
Contractor: Tilden-Coil Constructors
Long Beach Unified School District
MEASURE E - PLANNING
11
Potential Project Concerns
Ø Safety and Security
Ø Traffic Congestion
Ø Construction Dust / Noise
Ø Drop off and Parking
Long Beach Unified School District
MEASURE E - PLANNING Typical Construction - Site
12
New ADA Ramp Compaction
Underground Conduit
New Mechanical Equipment
New Window Installation
Long Beach Unified School District
MEASURE E - PLANNING
13
Typical Construction - Site
Before After
Long Beach Unified School District
MEASURE E - PLANNING Typical Construction - Corridor
14
Finished Corridor
Long Beach Unified School District
MEASURE E - PLANNING Typical Construction - Classroom
15
Finished Classroom
Long Beach Unified School District
MEASURE E - PLANNING Typical Construction - Restroom
16
Bathroom Demolition
New Restroom Fixtures Partitions New Drinking Fountain
New Restroom Tile
Long Beach Unified School District
MEASURE E - PLANNING
17
Typical Completed Exterior
Long Beach Unified School District
MEASURE E - PLANNING Move Details
18
They make frequent visits to each classroom to address packing questions
Movers will move all packed items
BartonElementarySchoolFriday,June15,2018
AKerSchoolDismissal
Long Beach Unified School District
MEASURE E - PLANNING Bell Schedule
19
BellScheduleRemainstheSame