Page 1 ABSTRACT #REF! Name of the Work Estimate Amount 250000 Quantity Description Rate 1 400.00 Sqm 206.90 Sqm 2 400.00 Sqm 204.50 Sqm 3 400.00 RM 57.92 RM Providing Barricading @ Nadar Saraswathi Boys Hr. School, Theni For Panchayat Election 2011 Sl. No Supply and erection of 13cm to 15cm dia casuarinas poles in internal room at a distance of 1.5m interval and bracing tie with country wood reepers of size 50x25mm at a distance of 0.75m interval horizontal and fixing the same in the casuarinas poles to the required length for fixing the GI sheets including the supply of all required materials like GI sheet and labour charges Supplying & erection of 13cm to 15cm dia casuarinas poles in strong room at a distance of 1.5m interval and bracing tie with casuarinas poles of size 10cm to 13cm dia at a distance of 0.75m interval horizontal and fixing the same in the casuarinas poles to the required length for fixing the weldmes including the supply of all required materials like GI wire mesh and labour charges (Materials on ire charges only) Providing barricading arrangements using casuarinas props 8-10cm and 60cm below ground level and 120cm above ground level fixing 3 horizontal should be in 3 tier and the lowest should be 45cm above ground level and tied with new coir rope, providing in all places and removing the same after the function is over etc. complete as directed by the departmental officers (Hire charges only) out

description

Barricading

Transcript of Barricading.xls

abstractABSTRACT0Name of the WorkProviding Barricading @ Nadar Saraswathi Boys Hr. Sec. School, Theni For Panchayat Election 2011Estimate Amount250000Sl. NoQuantityDescriptionRateAmount1400.00SqmSupply and erection of 13cm to 15cm dia casuarinas poles in internal room at a distance of 1.5m interval and bracing tie with country wood reepers of size 50x25mm at a distance of 0.75m interval horizontal and fixing the same in the casuarinas poles to the required length for fixing the GI sheets including the supply of all required materials like GI sheet and labour charges (Materials on hire charges only) etc. complete as directed by the Dept. officer206.90Sqm827602400.00SqmSupplying & erection of 13cm to 15cm dia casuarinas poles in strong room at a distance of 1.5m interval and bracing tie with casuarinas poles of size 10cm to 13cm dia at a distance of 0.75m interval horizontal and fixing the same in the casuarinas poles to the required length for fixing the weldmes including the supply of all required materials like GI wire mesh and labour charges (Materials on ire charges only) etc. complete as directed by the Dept. officer (Main Data II).204.50Sqm818003400.00RMProviding barricading arrangements using casuarinas props 8-10cm and 60cm below ground level and 120cm above ground level fixing 3 horizontal should be in 3 tier and the lowest should be 45cm above ground level and tied with new coir rope, providing in all places and removing the same after the function is over etc. complete as directed by the departmental officers (Hire charges only) out side the building57.92RM23168450.00Sqmsupplying and fixing of new GI sheet plain over country wood scantlings for doors and windows including hinges etc. complete as directed by the departmental officers (Hire charges only)494.18Sqm247095Provision for engaging labour for removing the debris and removing charis and tables from hall and to assist the departmental officers and rearranging chairs and tables after counting is over40Nos.Mazdoor 1st class153.00Nos.612025Nos.Mazdoor 2nd class138.00Nos.34506LSProvision for redoing the counting center to the original condition if any disturbances caused to the buildingLS10007LSProvision for painting and lettering the booth No. in strong roomLS10008Provision for electrification and mike arrangementsElectrification arrangements for rentTube light - 100 Nos. x 4 daysLS25000Focus light 1000 W - 5 Nos. x 4 daysGenarator 30 Kv 1 No. x 4 daysBox and mike set arrangements9LSProvision for Phtographic ChargesLS75010LSContingencies and other unforeseen ItemsLS243Total2500002500000

Page &P

detailedDetailed EstimateName of the Work:Providing Barricading @ Nadar Saraswathi Boys Hr. Sec. School, Theni For Panchayat Election 2011Estimate Amount:250000Sl. NoDescriptionNoMeasurementQuantityLBD1Supply and erection of 13cm to 15cm dia casuarinas poles in internal room at a distance of 1.5m interval and bracing tie with country wood reepers of size 50x25mm at a distance of 0.75m interval horizontal and fixing the same in the casuarinas poles to the required length for fixing the GI sheets including the supply of all required materials like GI sheet and labour charges (Materials on hire charges only) etc. complete as directed by the Dept. officer1st floor rooms1x817.501.20168.00Ground floor rooms1x363.001.20226.805.20Total in Sqm400.002Supplying & erection of 13cm to 15cm dia casuarinas poles in strong room at a distance of 1.5m interval and bracing tie with casuarinas poles of size 10cm to 13cm dia at a distance of 0.75m interval horizontal and fixing the same in the casuarinas poles to the required length for fixing the weldmes including the supply of all required materials like GI wire mesh and labour charges (Materials on ire charges only) etc. complete as directed by the Dept. officer (Main Data II).1st floor rooms1x817.501.20168.00Ground floor rooms1x363.001.20226.805.20Total in Sqm400.003Providing barricading arrangements using casuarinas props 8-10cm and 60cm below ground level and 120cm above ground level fixing 3 horizontal should be in 3 tier and the lowest should be 45cm above ground level and tied with new coir rope, providing in all places and removing the same after the function is over etc. complete as directed by the departmental officers (Hire charges only) out side the buildingOut side of the building1x1100.00100.00Entrance for booth agent1x224.0048.00East side entrance1x186.0086.00South side entrance1x160.0060.00Near water tank1x130.0030.00Near verandah1x170.0070.00Add extra6.00Total in RM400.004supplying and fixing of new GI sheet plain over country wood scantlings for doors and windows including hinges etc. complete as directed by the departmental officers (Hire charges only)Windows and ventilators inside2x41.503.5042.00Door ventilator outside1x23.500.906.30Add extra1.70Total in Sqm50.005Provision for engaging labour for removing the debris and removing charis and tables from hall and to assist the departmental officers and rearranging chairs and tables after counting is overMazdoor 1st class50Mazdoor 2nd class256Provision for redoing the counting center to the original condition if any disturbances caused to the building7Provision for painting and lettering the booth No. in strong roomL.S8Provision for electrification and mike arrangementsL.S9Provision for Phtographic ChargesL.S10Contingencies and other unforeseen ItemsL.S

Page &P

DataDATAName of work: Providing Barricading @ Nadar Saraswathi Boys Hr. Sec. School, Theni For Panchayat Election 2011Sl. NoQuantityDescriptionRatePerAmount1supplying and fixing of new GI sheet plain over country wood scantlings for doors and windows including hinges etc. complete as directed by the departmental officers (Hire charges only)Sub Data - ACost and supply of GI sheets for 5 operationsConsider a GI shet of size 1.37 x 2.30 = 3.15 Sqm3.15SqmCost of GI sheet303.00Sqm954.45Cost of Nails and screwsLS5.55Total for 5 operation960.00For 1 operation 960/5 = 192/3.15Sqm1923.15SqmCost of GI sheet for 1 operation192.003.15 Sqm192.001No.Carpenter 1st class237.00No.237.001No.Muzdoor 1st class153.00No.153.00Total for 3.15 Sqm582.00Rate for 1Sqm= 582/3.15 = 184.76 (A)184.76Sub Data - BCost, supply and fixing of Country wood scantling and labour chargesConsider door size of 0.90 x 2.00=1.80SqmRequirement of country wood scantling1x2x2.00m x 0.75 x 0.075 = 0.023 Cum1x3 x 0.09 x 0.75 x 0.075 = 0.015 CumSub total 0.038 Cum0.04CumCost of country wood scantling up to 4m long23800.00Cum952.00Cost of Nails and screws10.00Total for 5 operations962.00Rate for 1 operation = 962/5 = 192.40192.40Cost of country wood scantling for 1 operation192.400.04CumLabour charges for wrought and putup4239.00Cum169.560.50No.Carpenter 1st calss237.00No.118.500.50No.Mazdoor 1st class153.00No.76.50Total for 1.80 Sqm556.96Rate for 1Sqm = 556.96/1.80 = 309.42Sqm309.42supplying and fixing of new GI sheet plain over country wood scantlings for doors and windows including hinges etc. complete as directed by the departmental officers (Hire charges only)1.00SqmCost of GI sheet including labour for fixing (A)184.76Sqm184.761.00SqmCost of county wood scantling including labour for fixing (B)309.42Sqm309.42Rate for door = 494.18 Sqm494.18

Page &P

Data (2)DATAName of work: Providing Barricading @ Nadar Saraswathi Boys Hr. Sec. School, Theni For Panchayat Election 2011Sl. NoQuantityDescriptionRatePerAmount1Providing barricading arrangements using casuarinas props 8-10cm and 60cm below ground level and 120cm above ground level fixing 3 horizontal should be in 3 tier and the lowest should be 45cm above ground level and tied with new coir rope, providing in all places and removing the same after the function is over etc. complete as directed by the departmental officers (Hire charges only) out side the buildingBarricading external for 10RM - 10 operationsCos of materials12.00RM8-10cm dia casuarina propos for vertical posts13.50RM162.0030.00RM5-8cm dia casuairna propos for horizontal posts11.50RM345.003.00KgCoir rops50.00Kg150.00Total for 10RM - 10 Operations657.00For 1 Operation 657/1065.70Cost, supply and labour charges of barricading for external - 10RM10.00RMCost of barricading65.7010Sqm65.700.25No.Carpenter 2nd class218.00No.54.501.50No.Mazdoor 1st class for conveyance of materials, cutting, fixing and etc.153.00No.229.501.50No.Mazdoor 1st class for receiving and collecting the posts153.00No.229.50Total for 10RM579.20For 1RM = 579.20/1057.92

Page &P

Data (3)DATAName of work: Providing Barricading @ Nadar Saraswathi Boys Hr. Sec. School, Theni For Panchayat Election 2011Sl. NoQuantityDescriptionRatePerAmount1Supplying & erection of 13cm to 15cm dia casuarinas poles in strong room at a distance of 1.5m interval and bracing tie with casuarinas poles of size 10cm to 13cm dia at a distance of 0.75m interval horizontal and fixing the same in the casuarinas poles to the required length for fixing the weldmes including the supply of all required materials like GI wire mesh and labour charges (Materials on ire charges only) etc. complete as directed by the Dept. officer (Main Data II).Sub Data - ACost & supply of weldmesh for 3 operationsConsider a size of 3m x 3m = 9Sqm9.00SqmCos of weldmesh 7.5cm x 2.5cm283.00Sqm2547.000.50KgCost of binding wire21.00Kg10.50Total for 3 operation2557.50For 1 operation 2557.50/3 =853.00Sub Data - BCost, supply and labou charges for fixing the weldmesh -9Sqm9.00SqmCos of weldmesh 7.5cm x 2.5cm853.009Sqm853.001No.Fitter 1st class215.00No.215.001No.Muzdoor 1st class153.00No.153.00Total for 9 Sqm1221.00For 1Sqm = Rs.1221/9 = 136/Sqm(A)136.00Sub Data - CCost and supply of posts for 5 Operations-10Sqm11.00RMCos of 13-15cm dia casuarions posts23.00RM253.0016.00RMCos of 10-13cm dia casuarions posts17.50RM280.00Total for 5 Operations533.00For 1 Operation = Rs.533.00/5 = 107/Sqm107.00Sub Data - DCost, supply and labour charges for fixing the casuarions posts with reapers for 10Sqm10.00SqmCost of casuarions pots107.0010Sqm107.001No.Carpenter 1st class237.00No.237.002No.Muzdoor 1st class153.00No.306.001.00KgFor screws and nails35.00Kg35.00Total for 10 Sqm685.00For 1Sqm = Rs.68.50 (B)68.50Supplying & erection of 13cm to 15cm dia casuarinas poles in strong room at a distance of 1.5m interval and bracing tie with casuarinas poles of size 10cm to 13cm dia at a distance of 0.75m interval horizontal and fixing the same in the casuarinas poles to the required length for fixing the weldmes including the supply of all required materials like GI wire mesh and labour charges (Materials on ire charges only) etc. complete as directed by the Dept. officer (Main Data II).1.00SqmCost, supply and fixing of weldmesh (A)136.0010Sqm136.001.00SqmCost supply and fixing of casuarions posts (B)68.5010Sqm68.50For 1Sqm = Rs.204.50204.50

Page &P

Data (4)DATAName of work: Providing Barricading @ Nadar Saraswathi Boys Hr. Sec. School, Theni For Panchayat Election 2011Sl. NoQuantityDescriptionRatePerAmount1Supply and erection of 13cm to 15cm dia casuarinas poles in internal room at a distance of 1.5m interval and bracing tie with country wood reepers of size 50x25mm at a distance of 0.75m interval horizontal and fixing the same in the casuarinas poles to the required length for fixing the GI sheets including the supply of all required materials like GI sheet and labour charges (Materials on hire charges only) etc. complete as directed by the Dept. officerSub Data - ACost & Supply of GI sheet for 5 Operation-10Sqm10.00Sqm450.00Sqm4500.00Cost of screws, nails and washersLS50.00Total for 5 Operations4550.00For 1 Operation = Rs.4550/5 = 910/Sqm910.00Sub Data - BLabour charges for fixing the GI sheets-10Sqm10.00SqmCost of GI sheets for 1 operation910.0010 Sqm910.001No.Fitter 1st class215.00No.301.001No.Muzdoor 1st class153.00No.153.00Total for 10 Sqm1364.00Sub Data - CCost & Supply of posts and reapers for 5-Operations-10Sqm11.00RMCos of 13-15cm dia casuarions posts23.00RM253.0016.00RMCos of country wood reapers 50x25mm @ 75cm interval24.00RM384.00Total for 5 Operations637.00For 1 Operation = Rs.637.00/5 = 127/Sqm127.00Sub Data - DLabour charges for fixing the casuarinos posts with reapers for 10Sqm10.00SqmCost of casuarions with reapers 1 Operation127.0010Sqm127.001No.Carpenter 1st class237.00No.237.002No.Muzdoor 1st class153.00No.306.00Total for 10 Sqm670.00Supply and erection of 13cm to 15cm dia casuarinas poles in internal room at a distance of 1.5m interval and bracing tie with country wood reepers of size 50x25mm at a distance of 0.75m interval horizontal and fixing the same in the casuarinas poles to the required length for fixing the GI sheets including the supply of all required materials like GI sheet and labour charges (Materials on hire charges only) etc. complete as directed by the Dept. officer1.00SqmCost of GI sheets including labour charges for fixing (A)1364.0010Sqm1364.001.00SqmCost supply and fixing of casuarions posts with reapers (B)670.0010Sqm670.001.00KgCost of nails and screws35.001 Kg35.00Total for 10 Sqm2069.00For 1Sqm = Rs.206.90

Page &P