Bangkok's first monorails

4
The rapidly growing megacity Bangkok is addressing increasing urbanisation by expanding its public transportation network. Bombardier has been chosen to provide the turnkey systems for two new high- capacity monorail lines. The new lines bring transportation links to new areas of the city, integrate with the existing network and ease congestion. Bombardier’s total scope includes 72 four- car BOMBARDIER* INNOVIA* monorail 300 trains equipped with BOMBARDIER* CITYFLO* 650 automatic train control for driverless operation, and the supply of wayside sub-systems. Bombardier is also providing project management, systems engineering and integration, testing and commissioning for the full turnkey systems. In 2018, the company was also awarded a 20-year services contract for its INNOVIA monorail 300 systems on both lines, by Bangkok Mass Transit System Public Co. Ltd. (BTSC) to provide full continuity between delivery and maintenance. This latest contract will see Bombardier maintain the monorail trains, comprising 288 cars, as well as the system’s guideway switches and depot equipment. Bombardier's complete mobility solutions for Bangkok's new automated mass transit lines will seamlessly integrate with the city to increase connectivity Bangkok's first monorails 400,000 Passengers daily. Will benefit from the new monorail lines. Case study Thailand 288 INNOVIA monorail 300 cars. To be delivered to Bangkok as part of the order. Turnkey solutions

Transcript of Bangkok's first monorails

The rapidly growing megacity Bangkok is addressing increasing urbanisation by expanding its public transportation network. Bombardier has been chosen to provide the turnkey systems for two new high-capacity monorail lines.

The new lines bring transportation links to new areas of the city, integrate with the existing network and ease congestion. Bombardier’s total scope includes 72 four-car BOMBARDIER* INNOVIA* monorail 300 trains equipped with BOMBARDIER* CITYFLO* 650 automatic train control for driverless operation, and the supply of wayside sub-systems.

Bombardier is also providing project management, systems engineering and integration, testing and commissioning for the full turnkey systems.

In 2018, the company was also awarded a 20-year services contract for its INNOVIA monorail 300 systems on both lines, by Bangkok Mass Transit System Public Co. Ltd. (BTSC) to provide full continuity between delivery and maintenance. This latest contract will see Bombardier maintain the monorail trains, comprising 288 cars, as well as the system’s guideway switches and depot equipment.

Bombardier's complete mobility solutions for Bangkok's new automated masstransit lines will seamlessly integrate with the city to increase connectivity

Bangkok's first monorails

400,000Passengers daily. Will benefit from the new monorail lines.

Case study Thailand

288INNOVIA monorail 300 cars. To be delivered to Bangkok as part of the order.

Turnkey solutions

Yellow line

Eastern Bangkok Monorail Co. Ltd. (EBM)

30.4 km elevated monorail guideway

23 new stations, one depot

30 x 4-car INNOVIA monorail 300 trains

CITYFLO 650 rail control

Wayside systems and system integration

The Pink line, running from Khae Rai-MinBuri, will accommodate the travel demands of northern Bangkok. Meanwhile the Yellow line running from Lat Phrao-Samrong in the city’s eastern area will interconnect with four existing and planned mass rapid transit lines including the city’s airport rail link.

Making complex simpleBombardier is a proven turnkey system provider and has managed over 70 complex transportation projects with multiple suppliers and partners – as a one stop provider. As system integrator for the new lines, Bombardier is managing and integrating the supply of sub-systems including: vehicles, signalling, power, platform screen doors, telecommunications, supervisory control and data acquisition, track switches and depot equipment.

This approach reduces implementation times, increases cost control due to risk minimisation and ensures low life-cycle costs and complete integration of all system components.

Ensuring performance and efficiency The INNOVIA monorail 300 system will provide a cost-effective, efficient and attractive high-capacity solution for Bangkok. Designed to integrate seamlessly into the urban environment on a raised guideway, and able to handle sharp curves and steep grades the system is ideal for growing cities with existing infrastructure.

Thanks to its advanced features, such as CITYFLO driverless technology and regenerative braking, the system is extremely efficient to operate. Service is frequent, reliable and safe, meaning more comfort for passengers and more revenue for cities.

Delivering capacity and safetyCommunications-based train control is tackling the capacity challenge worldwide. It provides advantages for safe and cost-effective infrastructure management for the full range of mass transit systems from heavy metro to light rail and for all grades of automation.

The CITYFLO 650 solution is a moving block, automatic train control system featuring continuous, bi-directional train-track communication. Using radio, or LTE 4G, the exact position of the trains is known at every moment. There is no need for physical vehicle detection systems which decreases equipment and maintenance costs.

CBTC reduces the headway between vehicles, enabling trains to run closer to each other compared to a fixed block system. CITYFLO 650 can be used as an overlay to upgrade existing systems or for new greenfield lines.

The monorails will run at speeds up to 80 km/h with a maximum capacity of over 28,000 passengers per-hour, per-direction.

Pink line

Northern Bangkok Monorail Co. Ltd. (NBM)

34.5 km elevated monorail guideway

30 new stations, one depot

42 x 4-car INNOVIA monorail 300 trains

CITYFLO 650 rail control

Wayside systems and system integration

Car configuration

Length of train 50,474 mm

Length of driving motor car 13,392 mm

Width 3,142 mm (door closed)

Height 3,120 mm (from top of roof to top of GWB)

Floor height 450 mm

Gauge Monorail guideway beam

Width of entrance area 1,600 mm

Height of entrance area 1,930 mm

Floor fire resistance at least 30 mins

General data

First contract awarded - combined projects

June 2018

Type of vehicle Monorail

Model INNOVIA monorail 300 system

Transit system Mass transit system

Owner Mass Rapid Transit Authority

Quantity 72 trains (42 for Pink, 30 for Yellow)

Train consist 4-car trainset

Automatic train control

Type of project Mass transit system

Technology CITYFLO 650 rail control

Automation Driverless

Type of operation UTO

Performance and capacity

Max. speed 80 km/h

Minimum curve radius 70 m in main line / 46 m in depot

Traction motor rating 167 kW in motoring mode255 kW in regeneration mode

Air conditioning >39 kW

Cooling capacity >39 kW

Current collection 750 V DC

Empty weight of train 59,000 kg

Passenger capacity End car: 14 passenger seats per train, 137 passengers (seated+standing) Intermediate car: 16 passenger seats per train, 147 passengers (seated+standing)

Technical characteristics

Train configuration Driverless monorail

Nominal voltage 750 V DC

Motor Permanent magnet motor

Bogies Dual-tire, single axle, straddle-beam bogie

Brake Regenerative and hydraulic brake

Bodyshell Steel underframe and extruded aluminium sidewall & roof assemblies

External sliding doors Micro-plug passenger door

Interior LCD dynamic passenger information system, PA, PIP (intercom)

Air flow rate Fresh air – 8 m3/h/passengerEmergency air – 12 m3/h/passenger

Growing our local roots Bombardier is one of the few suppliers delivering technology from Thailand for Thailand. Project delivery, system integration and rail control design and implementation for the projects is being led from Bombardier’s regional hub in Bangkok. In 2017, Bombardier opened a dedicated state-of-the-art customer testing lab to support its CBTC projects in Asia Pacific.

Since establishing its Bangkok site in 1997, Bombardier has grown its local team to over 600, working on transportation needs for Thailand, Asia Pacific and globally. Signalling projects in Bangkok include the upgrade and expansion of the existing BTS SkyTrain and the city’s new MRT Purple line. Bombardier is also supplying the first driverless mass transit system in Thailand, INNOVIA automated people mover (APM) 300 system for the new Gold line.

Bombardier is honoured to be delivering the first monorails in Bangkok and, as a committed and long-term partner in this market, looks forward to continuing to provide our customers with smart rail solutions to improve connectivity across Thailand.

Bombardier Transportation celebrated the delivery of the first state-of-the-art INNOVIA monorail 300 vehicles for Thailand in October 2020.

The milestone was marked at a special event on October 1, 2020, attended by Thailand Prime Minister Gen. Prayut Chan-o-cha, as well as other senior government officials. H.E. Dr. Sarah Taylor, Ambassador of Canada to Thailand was also in attendance, along with representatives from Mass Rapid Transit Authority of Thailand (MRTA), Northern Bangkok Monorail Co. Ltd. (NBM) and Eastern Bangkok Monorail Co. Ltd. (EBM).

* Tra

de

mar

k(s)

of

Bo

mb

ard

ier

Inc.

or

its

sub

sid

iari

es.

© 2

02

0, B

om

bar

die

r In

c. o

r it

s su

bsi

dia

rie

s. A

ll ri

ght

s re

serv

ed

. 12

03

8/1

1-2

02

0/e

n

Bombardier Transportation 3354/16-19 6th floor, Manorom Building Rama IV Road, Klongton, Klongtoey Bangkok 10110, Thailand Tel +66 2 67 28 290 www.bombardier.com