MPLAD FUND UTILIZATION STUDY REPORTBengaluru City Parliamentary Constituencies
Suddi Mane, Press Club of Bengaluru
Thursday, April 4th, 2019
REGISTER | VOTE | PARTICIPATE
2
MPLAD STUDY PERFORMANCE of MP
COMPREHENSIVE CANDIDATE
INFORMATION
CITIZENS MEET CANDIDATE
INDEPENDENT CRITERIA BASED
ASSESSMENTDON’T GIVE UP ON DEMOCRCY
ETHICAL ELECTIONS
Lok Sabha Elections 2019
NAMMA BENGALURU PRIDE
Members of Parliament Local Area Development Fund
(MPLAD)
About MPLADS
• MPLADS scheme: Developmental works in the Parliamentary Constituency
• INR 5 cr per annum is allocated to the MP’s per Parliamentary Constituency
Study Objective
• To analyze the utilization level of MPLADS in the three Parliamentary
Constituencies which are under Bangalore Urban district.
Methodology
• Phase 1: Data collection and compilation – Data collected from the District
Collector (DC) office for 4 financial years 2014-15 to 2017-18.
• Phase 2: Analysis of the data
• Phase 3: Validating the analyzed data from the MP’s office
3
Members of Parliament Local Area Development Fund
(MPLAD) Fund
Meeting D V Sadananda Gowda to
submit MPLAD study
Meeting Tejaswinini Ananthkumar, W/o late H N
Ananth Kumar to submit MPLAD study
Meeting P C Mohan to
submit MPLAD study
4
Key Takeaways of MPLAD Utilization Study
★ Total available funds: 60 cr; Total Utilized funds: 55.53 cr - constituting 92 % utilization
(across all three Parliamentary Constituencies)
★ Bengaluru North (100 % utilization) ; Bengaluru Central (95 % utilization); Bengaluru South
(82 % utilization)
★ Citizen centric projects undertaken across the three parliamentary constituencies
★ 86 % of the MPLADS fund spent within the BBMP limits; 14 % in off BBMP limits
★ Drinking water and water infrastructure (25.98 %), Infrastructure development (12.62 %) and
Public amenities (10.78%) form top three allocations across the three Parliamentary
Constituencies
★ Hebbal 13 % in Bengaluru North , Basavangudi 25 % in Bengaluru South and Chamrajpet
28 % in Bengaluru Central form Assembly Constituencies with highest allocation
5
Launch of MPLAD landing page
Bengaluru City Parliamentary Constituencies
6
https://bpac.in/election-habba-2019/mp-lad-fund-utilization-study/
MPLAD Analysis: Summary
D V Sadananda Gowda
Bengaluru North
Parliamentary Constituency
P C Mohan
Bengaluru Central
Parliamentary Constituency
Late H N Ananth Kumar
Bengaluru South
Parliamentary Constituency
Total MP LAD
fund spent (in
INR crores)
20.04 19.05 16.44
% utilization 100 % 95 % 82 %
Top Spends
from MPLAD
fund
(in INR
crores)
Water Infrastructure ₹ 6.36
Infrastructure dvpmnt ₹ 6.15
Sports &Youth Services ₹ 2.76
Education ₹ 1.29
Development of women
and child ₹ 0.86
Health & Family Welfare ₹ 3.73
Water infrastructure ₹ 2.94
Railway Infrastructure ₹ 2.86
Public amenities ₹ 2.42
Sports & Youth Services ₹ 1.76
Water infrastructure ₹ 5.13
Public amenities ₹ 2.91
Trust and Societies ₹ 2.10
Education ₹ 1.68
Yoga Kendra ₹ 1.22
Key Projects Construction of Volley Ball and
Basket Ball stadium at
Malleshwaram - ₹ 2.15 cr
Construction of RCC drains and
asphalting of roads - ₹ 0.70 cr
Construction of halt station and
foot over bridge at ITPL - ₹ 2.86 cr
Supply of medical equipment's to
Vani Vilas and Victoria Hospital -
₹ 3.38 cr
Construction of
Krishnadevaraya Halt Station,
Vijaynagar - ₹ 0.70 cr
Construction of Multipurpose
halls - ₹ 1.75 cr
7
MPLAD Analysis: Bengaluru North Parliamentary Constituency
8
Key Observations:
Bengaluru North Parliamentary Constituency
• The entire amount of Rs. 20 crores for the reference period was utilized.
• Drinking water and related infrastructure (31.74%), Infrastructure development (30.68%) and sports and
youth services (13.79%) constitute 76 % of the allocation under MPLADS
• 30 % of the works under MPLADS funds were undertaken in the Assembly Constituencies which are
beyond BBMP Limits.
• Hebbal (13%), Malleshwaram (12%) and Yeshwantpura (11%) constitute 35 % of the work
allocation under MPLADS funds
9
MPLAD Analysis: Bengaluru Central Parliamentary Constituency
10
Key Observations:
Bengaluru Central Parliamentary Constituency
• Health and Family Welfare (19.5%), Drinking water and related infrastructure (15.43%) and Railway
infrastructure (15.01%) constitutes 50 % of allocation under MPLADS
• Chamrajpet (28%), Mahadevpura (20%) and Sarvagnanagar (12%) constitute 60 % of the work
allocation under MPLADS funds .
• Areas in the Off BBMP limits of the PC has received allocation of ₹ 2.12 crores (11.13%)
11
MPLAD Analysis: Bengaluru South Parliamentary Constituency
12
Key Observations:
Bengaluru South Parliamentary Constituency
• Drinking water and related infrastructure (31.17%), public amenities (17.70%) and Trust and societies
(12.77%) constitute 60 % allocation under MPLADS
• Basavangudi (25%), Vijaynagar (16%) and Chickpet (14%) constitute 55 % of the work allocation
under MPLADS funds
• 2014-15 (20 %) , 2015-16 (16 %) of the MPLAD funds spent on Multipurpose halls
13