BAM LNGS 19-23 may 2003 [email protected].

14
BAM BAM LNGS 19-23 may 2003 [email protected]

Transcript of BAM LNGS 19-23 may 2003 [email protected].

Page 1: BAM LNGS 19-23 may 2003 ubaldo.denni@lnf.infn.it.

BAMBAM

LNGS 19-23 may 2003

[email protected]

Page 2: BAM LNGS 19-23 may 2003 ubaldo.denni@lnf.infn.it.

Team

• Massimo Alberto Franceschi (SSCR group) (*)

• Gianfranco Catitti (SSCR group)

• Enzo Iacuessa (SSCR group)

• Ubaldo Denni (Electronics and Controls group)

(*) Resp. [email protected]

Page 3: BAM LNGS 19-23 may 2003 ubaldo.denni@lnf.infn.it.

Handle a Bricks

[email protected]

SIDEC FA33 – FA30SIDEC CA41 – CA40“Japanese laminated films”

Page 4: BAM LNGS 19-23 may 2003 ubaldo.denni@lnf.infn.it.

Glues• Fast Bond 49 and 7434 from 3M

[email protected]

Page 5: BAM LNGS 19-23 may 2003 ubaldo.denni@lnf.infn.it.

Tapes• 3M Double-Face Tape (9080 ) just glue

• 3M Double-Face Tape (9071) with polyester support

• 3M Double-Face Tape (9415) one face is very strong another face is weak

•Permacell P213•Permacell P214•3M alluminium foil tape 425

[email protected]

Page 6: BAM LNGS 19-23 may 2003 ubaldo.denni@lnf.infn.it.

For test glue and tapes...

[email protected]

Page 7: BAM LNGS 19-23 may 2003 ubaldo.denni@lnf.infn.it.

Automate piling-up

[email protected]

Page 8: BAM LNGS 19-23 may 2003 ubaldo.denni@lnf.infn.it.

Piling-up with a [email protected]

Page 9: BAM LNGS 19-23 may 2003 ubaldo.denni@lnf.infn.it.

Taping

[email protected]

Page 14: BAM LNGS 19-23 may 2003 ubaldo.denni@lnf.infn.it.

M.P. H [mm]

1 68,547

2 68,590

3 68,594

4 68,506

5 68,539

Measure points

[email protected]