1
Shore connection solutions
Plug in to green power
www.schneider-electric.com/shore-connection
Baltic Port Organization
Ystad, April 2015
Hugues Berthet
Shore Connection
Business Development Director
2
Such as
airports, there
are several
years, Ports are
currently their
revolution to
limit pollution
and the impact
on the
environment
3
Up to
66%
Savings
3
ShoreBoxTM
Shore Hinterland
Existing or
New substation
Electrical
network
Cable dispenser
to ship connection
Frequency adaptation
And safety operation
Shore connection general overview
Energy provider Port Terminal Quay Ship Shore / Ship Interface
To
Emission
NoiseVibration
0
Container ship
Ship
Ship to supply
4
Up to
66%
Savings
ShoreBoxTM
Shore Hinterland
Existing or
New substation
Electrical
network
Cable dispenser
to ship connection
Frequency adaptation
And safety operation
Shore connection general overview
Energy provider Port Terminal Quay Ship Shore / Ship Interface
To
Emission
NoiseVibration
0
Ship to supply
Ship
G
Ferry, RoRo
Cargo
Cruise
5
HVSC Main Standard :
IEC / ISO / IEEE 80005-1, HVSC
IEC / ISO / IEEE 80005-2, Com. Protocol
IEC / ISO / IEEE 80005-3, LVSC
Plugs & Sockets outlets
IEC 62 613, Plugs & Sockets Outlets
Interface Voltage
MV : 6,6 / 11kV, (+ 6% / - 3,5%)
LV : 400 / 440V / 690V, (+ 6% / - 5%)
Basket of Ships Power Demand
MV : 1MVA up to 20MVA
LV : <1MVA, 350A maxi per plug
Frequency on Board: 50Hz / 60 Hz
Compensation Tide System : 9m
Distance between ShoreBoX to connection point :
LV / 300 m maxi & MV No limit
Main Interface Requirements
Container ship
Ferry, RoRo
Cargo
Cruise
7
1 Montbonnot
Platform GFC • 10 GFC //, 5 MVA
• Genset 1 MVA
• Network Synchronization
• General behaviour
Final test in Lab • Test at In, 3 MVA
• TVD
• Type tested
2 Eybens
3 Years of tests to learn the behaviour
of a global Solution in 3 test platforms
3 Volta Lab Simulation Platform • HVAC
• Fans
• LV Automation
Control Command • Safety loop
• Interface Shore / Ship
• Adaptation to Ship
8 8
A complete platform to test & simulate
Ship Loads Ship generator
Test platform Energy management
5 MVA
10 GFC in //
1 MVA
9
An Integrated System is prefabricated & industrialized
This is not a car
But spare parts
This is a car
performed entirely
by a manufacturer
with a guarantee of performance
over the duration of its life cycle
11
An Integrated System is
a prefabricated
electrical substation
RM6 SM6 Premset
Transformer
GFC Galaxy 7000
MV – 50 Hz
400V – 50 Hz
400V – 60 Hz
6,6 kV
Upstream
LV busbar
MV plug
To ship
6,6 kV – 60 Hz
Downstream
Busbar
GFC
7000
2 MVA
2,3 MVA
Standard
Product
Standards
compliant
Knowledge,
Return on Experience,
Port Context
Usage values
12
Schneider Electric worldwide references
Kalibaru
Casablanca
Tanger
Riga
Bergen
Marseille
Los Angeles
14 Interface
Shore to Ship
Ship Gabriella
Mariella Viking Line Terminal Hinterland
Utility
G
Electrical
network
Ship to
supply
LV Cable dispenser Cable to ship
connection
ShoreBoxTM
Helsinki Viking Line ShoreBoX
overview
Safety operation
&
Energy Management
15
OSV connection at Port of Bergen ● All in one ShoreBoX, 1 MVA
● Operational middle of 2015
ShoreBoX
9th March 2015
● Supply electricity to OSV
Offshore Supply Vessels at berth
16
Containership terminal at Port of Riga
Berth under construction ShoreBoX shipped from France
● Port: Riga, Latvia
● Ship type: Containership
● Offer: 2x2MVA ShoreBoX
with frequency conversion
17
Future Kalibaru Container Terminal • Existing port does not have the capacity
to host the increasing sea freight volumes
• Development of the new KCT (Kalibaru Container Terminal) started in March 2013
• Future capacity 13 M 20-foot containers / year
• First phase is scheduled for completion in late 2017
• When fully operational, it will be the country’s largest industrial port and the 3rd in South East Asia
● New green, modern port in South Asia
● First phase includes 9 berths equipped
with Schneider Electric 5-MVA shore
connection systems
● 2nd and 3rd phases will equip berths with
shore connection as well
Future Kalibaru
Container Terminal
18
Navy ship connection at Port of Toulon
• Facility to provide 60hz to the base network
• First installation to be operational in 2015.
• 2x ShoreBoX MV-> MV 4MVA with frequency conversion
• 2 types of ships connected , BPC 2,2MVA & FREMM 1,2MVA ShoreBoXTM
19
Moroccan Navy Port
The ShoreBoX leaving the factory
beginning of January 2014
During the commissioning,
end of January 2014
The ShoreBoX installed and
fully operational
The customer has passed another order
for an equivalent system for another
Moroccan Navy Port
FREMM French Frigate
20
CMN Marseille south of France
● Customers need: Supply 3 Ferries
● 3 Berths : Poste 68, 70 & 74
● Voltage on Port : 20kV in substation
● Power per ship : 1,8MVA, 11kV
● 50hz (no frequency conversion)
21
1
5
3
1
2 3
1
1
2
CMN Ship modification in Marseille France January 2015
3 3
1
2
3
4
5
1 Incomer
2 MV Premset Cubicle
3 Transformer if reauired
4 Main Switchboard
5 Bridge
22
Plug in to
Green Power
Shore Connection Solution
Thank you for your attention