Baltic-Adriatic TEN-T Core Network Corridor – Project list, November 2017
Disclaimer: this list is indicative work in progress still evolving and does not represent a commitment by the MS or the project promoter.
Project name Project
category Project promoter
Member States / Countries involved
Total costs Project end
date
Upgrade Nordbahn Wien Süßenbrunn - Bernhardsthal Rail ÖBB-Infrastruktur AG AT 592.0 12/2025
Data networks and mobile radio Wien -Bernhardsthal Rail ÖBB-Infrastruktur AG AT 2.1 12/2018
Train condition checkpoints Wien -Bernhardsthal Rail ÖBB-Infrastruktur AG AT 0.7 12/2018
Integration of interlockings into signalling & dispatching centres Wien - Bernhardsthal
Rail ÖBB-Infrastruktur AG AT 10.5 12/2018
Noise protection Wien - Bernhardsthal Rail ÖBB-Infrastruktur AG AT 3.6 12/2020
Upgrade Stadlau-Marchegg Rail ÖBB-Infrastruktur AG AT 550.0 12/2023
Train condition checkpoints Marchegg - Arnoldstein Rail ÖBB-Infrastruktur AG AT 9.5 12/2020
Integration of interlockings into signalling & dispatching centres Marchegg - Arnoldstein
Rail ÖBB-Infrastruktur AG AT 98.6 12/2016
Pottendorf line Rail ÖBB-Infrastruktur AG AT 618.2 12/2022
Upgrade Wien Meidling / Altmannsdorf Rail ÖBB-Infrastruktur AG AT 44.6 12/2023
Wien Zvbf Rail Freight Station - Alignment optimization of exit lines
Rail ÖBB-Infrastruktur AG AT To be
defined 12/2037
Reconfiguration of the accessibility of Himberg Station Rail ÖBB-Infrastruktur AG AT 10.5 12/2020
Link between Vienna Airport - Bruck/Leitha (- border AT/HU)
Rail ÖBB-Infrastruktur AG AT To be
defined 12/2017
Extension Wien Erdberger Lände Rail Bridge (section Wien Rail ÖBB-Infrastruktur AG AT To be 12/2034
Project name Project
category Project promoter
Member States / Countries involved
Total costs Project end
date
Simmering - Wien Praterkai) defined
Integration of interlockings into signalling & dispatching centres (Vienna)
Rail ÖBB-Infrastruktur AG AT 25.7 12/2017
Noise protection (Vienna) Rail ÖBB-Infrastruktur AG AT 13.4 12/2020
Train condition checkpoints Wien - Nickelsdorf Rail ÖBB-Infrastruktur AG AT 0.8 12/2017
Noise protection Wien - Nickelsdorf Rail ÖBB-Infrastruktur AG AT 1.7 12/2017
Electronic interlocking: Wr. Neustadt - Graz Rail ÖBB-Infrastruktur AG AT 64.3 12/2022
Data networks and mobile radio Wien - Villach Rail ÖBB-Infrastruktur AG AT 15.7 12/2017
Noise protection Wien - Villach Rail ÖBB-Infrastruktur AG AT 17.9 12/2021
Upgrade Wampersdorf - Wiener Neustadt Rail ÖBB-Infrastruktur AG AT To be
defined 12/2022
Upgrade Wiener Neustadt - Gloggnitz Rail ÖBB-Infrastruktur AG AT 81.2 12/2018
Ternitz station reconfiguration Rail ÖBB-Infrastruktur AG AT 41.3 12/2022
Semmering base tunnel Rail ÖBB-Infrastruktur AG AT 3,315.0 12/2026
Station reconfigurations Mürzzuschlag - Bruck a.d.M. Rail ÖBB-Infrastruktur AG AT 116.3 12/2019
Station reconfigurations Bruck a.d.M - Graz Rail ÖBB-Infrastruktur AG AT 204.9 12/2023
Graz Hauptbahnhof Rail ÖBB-Infrastruktur AG AT 150.2 12/2017
Upgrade Graz - Spielfeld-Straß Rail ÖBB-Infrastruktur AG AT 19.1 12/2026
Graz - Klagenfurt; Koralm line Rail ÖBB-Infrastruktur AG AT 5,539.3 12/2024
ETCS deployment Wien - Süßenbrunn Rail ERTMS ÖBB-Infrastruktur AG AT 16.4 12/2017
ETCS deployment in ETCS gap between Westbahn and Ostbahn
Rail ERTMS ÖBB-Infrastruktur AG AT 9.8 12/2019
ERTMS deployment Wien – Marchegg Rail ERTMS ÖBB-Infrastruktur AG AT To be
defined 12/2030
ERTMS deployment Wien – Parndorf Rail ERTMS ÖBB-Infrastruktur AG AT To be
defined 12/2022
ERTMS deployment Parndorf – Kittsee / Petrzalka (border AT/SK)
Rail ERTMS ÖBB-Infrastruktur AG AT To be
defined 12/2030
ERTMS deployment Wampersdorf – Gramatneusiedl Rail ERTMS ÖBB-Infrastruktur AG AT To be 12/2023
Project name Project
category Project promoter
Member States / Countries involved
Total costs Project end
date
defined
ERTMS deployment Wampersdorf – Wien Rail ERTMS ÖBB-Infrastruktur AG AT To be
defined 12/2023
ERTMS deployment Wr. Neustadt – Wampersdorf Rail ERTMS ÖBB-Infrastruktur AG AT To be
defined 12/2023
ERTMS deployment Graz – Wr. Neustadt Rail ERTMS ÖBB-Infrastruktur AG AT To be
defined 12/2030
ERTMS deployment Werndorf – Graz Rail ERTMS ÖBB-Infrastruktur AG AT To be
defined 12/2023
ERTMS deployment Sentilj / Spielfeld-Strass (border AT/SLO) – Werndorf
Rail ERTMS ÖBB-Infrastruktur AG AT To be
defined 12/2023
ERTMS deployment Klagenfurt – Werndorf Rail ERTMS ÖBB-Infrastruktur AG AT To be
defined 12/2023
ERTMS deployment Border AT/IT – Klagenfurt Rail ERTMS ÖBB-Infrastruktur AG AT To be
defined 12/2030
Upgrade Austrian locomotives to ERTMS Baseline 3 Rail ERTMS Bundesministerium für
Verkehr, Innovation und Technologie
AT 9.0 12/2019
Planning and construction of the A5 North motorway. Schrick-Poysbrunn section
Road ASFINAG (Austrian Road Infrastructure Manager)
AT 283.0 12/2017
A5 Construction Poysbrunn - Border AT/CZ 1st Part Road ASFINAG (Austrian Road Infrastructure Manager)
AT 49.6 12/2018
A5 Construction Poysbrunn - Border AT/CZ 2nd Part Road ASFINAG (Austrian Road Infrastructure Manager)
AT 91.1 06/2027
Planning of the A5 North motorway, section between Poysbrunn and the Austria-Czech border
Road ASFINAG (Austrian Road Infrastructure Manager)
AT 5.0 02/2018
S1 - Vienna Outer Ring Expressway - Schwechat - Süßenbrunn (1st part: Großenzersdorf - Süßenbrunn)
Road ASFINAG (Austrian Road Infrastructure Manager)
AT 271.1 12/2020
S1 - Vienna Outer Ring Expressway - Schwechat - Süßenbrunn (2nd part: Schwechat - Großenzersdorf)
Road ASFINAG (Austrian Road Infrastructure Manager)
AT 1,612.1 09/2025
Project name Project
category Project promoter
Member States / Countries involved
Total costs Project end
date
A4 - Fischamend – Bruck a. d. Leitha 6-lane expansion and rehabilitation
Road ASFINAG (Austrian Road Infrastructure Manager)
AT 151.7 11/2020
A2 motorway: northern by-pass Klagenfurt, general overhaul (stage 2)
Road ASFINAG (Austrian Road Infrastructure Manager)
AT 14.6 06/2018
Roadside network information system Road ASFINAG (Austrian Road Infrastructure Manager)
AT 4.1 11/2018
eCall.at Road Bundesministerium für
Verkehr, Innovation und Technologie
AT 8.0 12/2017
C-Roads Austria Road Bundesministerium fur
Verkehr, Innovation und Technologie
AT 19.1 12/2020
Planning and construction of the expansion of the trimodal Port of Freudenau/Vienna
IWW Wiener Hafen, Gmbh & Co
KG AT 57.0 12/2025
Improving of the multimodal interconnections at Port of Freudenau/Vienna
IWW Wiener Hafen, Gmbh & Co
KG AT 9.0 n.a.
Expansion of the container terminal - construction Stage 1 IWW Wiener Hafen, Gmbh & Co
KG AT 5.1 12/2017
Third runway for the Vienna International Airport Airport Vienna Airport PLC AT 800.0 12/2028
Sustainable airport area - CO2 neutral Airport Airport Flughafen Wien AG AT 80.0 12/2025
Cargo Center Vienna South (Inzersdorf) Multimodal ÖBB-Infrastruktur AG AT 245.5 12/2017
Terminal Graz Süd Expansion Multimodal Steiermärkische
Landesbahnen / Cargo-Center-Graz
AT 39.8 n.a.
I_HeERO - Harmonized eCall European pilot (Partnership Project)
Road ERTICO – ITS Europe
AT, BE, BG, CY, CZ, DE, EI, ES, FI,
GR, IT, LU, NL, PT, RO, SI, UK
31.0 12/2017
Navigation performance implementation tooklit Airport EUROCONTROL AT, BE, CZ, CY, DE, DK, EE, FI, FR, GR,
4.9 12/2019
Project name Project
category Project promoter
Member States / Countries involved
Total costs Project end
date
HU, HR, IE, IT, LU, LV, LT, NL, MT, PL, PT, RO, SK, SI, ES,
SE, SI, UK
Coordinated and harmonised implementation of rail freight corridors and freight and passenger telematics applications
Rail RailNetEurope
AT, BE, CZ, DE, DK, EE, FI, FR, GR, HU, HR, IE, IT, LU, LV, LT, NL, PL, PT, RO, SK, SI, ES, SE,
SI, UK
7.8 12/2017
Support to the implementation of ERTMS Rail ERTMS EEIG ERTMS Users Group
AT, BE, CZ, DE, DK, EE, FI, FR, GR, HU, HR, IE, IT, LU, LV, LT, NL, PL, PT, RO, SK, SI, ES, SE,
SI, UK
11.5 12/2017
Joint Application for PDP Implementation - Cluster 1 (DP Implementation)
Airport ENAV S.p.A.
AT, BE, CZ, DE, DK, EE, FI, FR, GR, HU, HR, IE, IT, LV, NL, PL, PT, RO, SK, SI, ES, SE, UK, BH,
NO
643.8 12/2020
SESAR Deployment Programme implementation 2015-Cluster 1
Airport SESAR Deployment Manager
(NATS (En-Route)Pic on behalf)
AT, BE, DE, DK, ES, FI, FR, IE, IT,
MT, NL, PT, SE, SI, UK
529.1 12/2018
ULTRA-E Innovation Allego B.V. AT, BE, DE, NL 13.1 12/2018
Regional and Transport Development in the Danube-Black IWW Regional Government of AT, BG, DE, HR, 2.2 06/2019
Project name Project
category Project promoter
Member States / Countries involved
Total costs Project end
date
Sea Region towards a Transnational Multiport Gateway Region - DBS Gateway Region
Lower Austria HU, MD, RO, RS, SK, UA
DAPHNE - Danube Ports Network IWW Pro Danube International AT, BG, HR, HU, MD, RO, RS, SK,
UA 3.0 06/2019
GETUP Green Danube Ports IWW CN Administratia Porturilor Dunarii Maritime SA Galati
AT, BG, HU, RO, RS, SK, UA
2.0 n.a.
CROCODILE 2 Road Bundesministerium fur
Verkehr, Innovation und Technologie
AT, CY, CZ, DE, GR, IT, PL, RO, SI
41.3 12/2018
CROCODILE 3 Road
Bundesministerium fur Verkehr,
Innovation und Technologie (AT)
AT, CY, CZ, IT, SI
13.8 12/2020
Retrofitment and upgrade of locomotives Rail ERTMS Lokomotion Gesellschaft fur
Schienentraktion mbH AT, CZ, DE, HU, IT,
SI 5.4 12/2020
Deployment of ERTMS/ETCS onboard components Rail ERTMS CD Cargo, a.s. AT, CZ, DE, HU,
PL, SK 137.5 12/2020
Deployment of ERTMS/ETCS onboard components Rail ERTMS Ceske drahy, a.s. AT, CZ, DE, HU,
PL, SK 246.9 04/2020
Linking Danube Innovation AustriaTech AT, CZ, HR, HU, MD, RO, SK, SI
2.9 06/2019
NEXT-E Innovation Zapadoslovenska energetika,
a.s. (SK) AT, CZ, HR, HU,
RO, SI, SK 22.2 12/2020
Free Route Airspace from the Black Forest to the Black Sea Airport HungaroControl Air Navigation Services
Pte.Ltd.Co.
AT, CZ, HR, SK, SI, UK
2.2 06/2017
Connecting Hydrogen Refuelling Stations (COHRS) Innovation H2 Mobility Deutschland
GmbH & Co. KG AT, DE 26.0 06/2019
CODACASIB Airport Ministere de l’ecologie, du AT, DK, FR, HR, IE, 4.6 06/2018
Project name Project
category Project promoter
Member States / Countries involved
Total costs Project end
date
developpement durable et de I’energie
SE
CODACAS IB Airport Ministere de l’ecologie, du developpement durable et
de I’energie
AT, DK, FR, HR, IE, SE
0.8 06/2018
Speeding up harmonisation and convergence of the ATM Airport AustroControl GmbH AT, DK, HR, IE, SE 24.5 06/2017
EVA+ (Electric Vehicles Arteries in Italy and Austria) Innovation EnelSpA AT, IT 13.6 12/2018
Joint application for PDP implementation - Cluster 2 Airport SDAG - SESAR Related Deployment Airport Operators Grouping
AT, IT and other 10 Member
States 125.4 12/2019
Ursa Major 2 Road Landesbetrieb Mobilität
(project coordinator) AT, IT, DE, NL 92.3 12/2018
Joint Application for PDP Implementation - Cluster 3 Airport ENAV S.p.A. AT, IT, PL and
other 16 Member States
281.6 12/2018
ERTMS HIPOPS (ERTMS Harmonised & International Procedures for Placing into Operation of Products & Subsystems)
Rail ERTMS RINA Services BE, BG, FR, IT 1.4 09/2017
Deployment of European Surveillance System Airport EUROCONTROL BE, CZ, PT 10.8 12/2020
Deployment of European Surveillance System Airport EUROCONTROL BE, CZ, PT 0.8 12/2020
LNG 2.0 - The C02llaborative S0- 2lution Innovation Furetank Rederi AB BE, DE, EE, LT, LV,
NL, PL 28.4 11/2019
LNG motion Innovation Axegaz SAS BE, DE, ES, FR,
HU, IT, NL, PL, RO 60.3 12/2020
ATM Data 'as a service' Airport European Organisation for the Safety of Air Navigation
(EUROCONTROL) BE, DE, LU, NL, SI 4.9 12/2017
EU ITS Platform (EU EIP) Road SINA S.p.A BE, DK, DE, ES, FI, FR, IE, IT, LT, NL,
PL, PT, RO, SE, UK 12.9 12/2020
Project name Project
category Project promoter
Member States / Countries involved
Total costs Project end
date
Unit-2 Innovation Electricité de France SA BE, FR, IT, UK 3.6 12/2017
SESAR Deployment Programme implementation 2015 - Cluster 3
Airport SESAR Deployment Manager
(NATS (En-Route) Pic on behalf)
BG, CZ, EE, EL, HR, HU, NL, PL, PT,
RO, SK, UK 132.6 12/2020
2016 SESAR Deployment Programme implementation - Cluster 2: Cohesion
Airport SESAR Deployment Manager
(NATS (En-Route) Plc on behalf) (UK)
BG, CZ, HR, HU, SI, SK, UK
10.1 12/2020
Fresh Food Corridors MoS Luka Koper, Port and Logis- tic System, Public Limited
Company CY, EG, FR, IT,SI 21.4 06/2017
Preventing incident and accident by safer ships on the oceans - PICASSO
MoS Sociedad de Salvamento y
Seguridad Maritima CY, ES, GR, IT, MT,
PT, SE, UK 10.3 11/2018
ELEMED-Electrification of the Eastern MEDiterranean area Innovation Hellenic Lloyd’s SA CY, GR, SI 1.5 03/2018
ELEMED-Electrification of the Eastern MEDiterranean area Innovation Hellenic Lloyd’s SA CY, GR, SI 0.2 03/2018
Synchronised PBN Implementation Cohesion Europe (SPICE)
Airport EUROCONTROL CY, PT, RO, SK 39.9 12/2020
Track optimisation Český Těšín - Dětmarovice , only Dětmarovice station belongs to BAC
Rail SŽDC CZ 108.0 09/2019
Remote traffic control of the section Ostrava, Svinov – Petrovice u Karviné and Dětmarovice - Mosty u Jablunkova
Rail SŽDC CZ 10.8 12/2017
Ostrava junction modernisation Rail SŽDC CZ 222.2 12/2021
Reconstruction of Přerov railway station, construction II Rail SŽDC CZ 84.6 10/2021
Modernisation of the railway junction Přerov, 3rd phase Rail SŽDC CZ 26.1 12/2021
Electric traction system change to 25 kV AC, 50 Hz in the section Nedakonice - Říkovice
Rail SŽDC CZ 55.2 06/2020
Blažovice - Nezamyslice: railway modernisation to 200 km/h
Rail SŽDC CZ 896.8 08/2023
Nezamyslice - Přerov: railway modernisation to 200 km/h Rail SŽDC CZ 453.1 06/2023
Brno - Blažovice: railway modernisation to 200 km/h Rail SŽDC CZ 262.3 12/2024
Railway junction Brno (Study) (also: Brno Rail Node) Rail Railway Infrastructure CZ 11.0 02/2024
Project name Project
category Project promoter
Member States / Countries involved
Total costs Project end
date
Administration, state organization (SZDC)
Railway junction Brno (Works) (also: Brno Rail Node) Rail Railway Infrastructure Administration, state organization (SZDC)
CZ 745.0 02/2030
Modernisation of the track Šakvice - Hustopeče Rail SŽDC CZ 40.4 12/2019
Upgrade of Brno - Breclav line as a High Speed Rail line Rail SŽDC CZ To be
defined 12/2030
Modernisation of selected sections of the Brno - Prerov railway line
Rail SŽDC CZ 45.5 12/2024
Implementation of the TSI TAF and TSI TAP information systems SZDC - phase 3
Rail Sprava zeleznicni a dopravni
cesty, statni organizace (SZDC, s. o.)
CZ 3.2 12/2020
Implementation of TAF TSI in AWT Rail Advanced World Transport
a.s. CZ 0.9 12/2020
ETCS Petrovice u Karvine - Ostrava - Prerov - Breclav Rail ERTMS SŽDC CZ 24.1 07/2018
B22 D1 01191 Starý Lískovec – Brno-jih 6,7 km Road Ministry of Transport, Road and Motorway Directorate
(RSD) CZ 110.7 12/2028
D1 01311-3 Brno-jih – Holubice: Upgrade (for increasing the absorption capacity)
Road ŘSD ČR CZ 131.1 12/2035
D1 0137 Přerov - Lipník: motorway D1 construction Road ŘSD ČR CZ 177.9 12/2018
D1 0136 Říkovice - Přerov: motorway D1 construction Road ŘSD ČR CZ 275.5 12/2022
D52 Pohořelice - state border Road ŘSD ČR CZ 380.0 12/2030
Introduction and development of ITS for road transport on highways, limited access highways and 1st class roads (incl. Operation or toll system)
Road Ministry of Transport CZ 1,272.0 12/2023
CEZ EV TEN-T Fast Charging Network Road CEZ, a. s. CZ 2.9 12/2020
URSA Czech Republic Road Road and Motorway
Directorate of the Czech CZ 1.0 12/2020
Project name Project
category Project promoter
Member States / Countries involved
Total costs Project end
date
Republic
Multimodal container terminal Ostrava - Paskov, phase III (acc. to CEF)
Multimodal Advanced World Transport
a.s. CZ 8.9 12/2020
Rail road terminal Přerov Multimodal Rail Cargo Operator - CSKD
s.r.o. CZ
To be defined
n.a.
Open multi modal rail road terminal Přerov Multimodal To be specified CZ To be
defined 01/2030
EV fast charging backbone network Central Europe Innovation CEZ, a. s. CZ 2.8 12/2018
EAST-E Innovation Zapadoslovenska energetika,
a.s. CZ, HR, SK 7.4 12/2018
Implementation of TAF TSI at the Hungarian private railway undertakings
Rail OLTIS Group, a. s. (CZ) CZ, HU 1.3 12/2020
FAST-E (SK\CZ) Innovation Zapadoslovenska energetika,
a.s. CZ, SK 2.6 09/2017
Implementation of TAF TSI by private railway operators Rail OLTIS Group CZ, SK, PL 1.1 12/2019
ETCS retrofit Rail ERTMS LEO Express a.s. CZ, SK, PL 3.8 07/2019
Sustainable LNG Operations for Ports and Shipping - Innovative Pilot Actions (GAINN4MOS)
Innovation Fundacion Valenciaport ES, FR, HR, IT, PT,
SI 10.3 09/2019
Med-Atlantic Ecobonus MoS Puertos del Estado ES, FR, IT, PT 1.5 11/2017
DIGITMED-Digital Single Market in the Mediterranean Innovation Italian Ministry of Transport
and Infrastructure and Livorno Port Authority
ES, GR, HR, IT, RO, SI
62.0 12/2020
CarEsmatic MoS Luka Koper, d.d. ES, SI 17.1 12/2018
cHAMeleon Innovation HAM CRIOGÉNICA, ENOS
d.d. ES, SI 2.7 06/2019
Improving Motorways of the sea Venice Patras (MoS Venice-Patras)
MoS Venice Port Authority GR, IT 9.0 12/2018
SiLNGT Small Scale TRANSPORT Innovation BUTAN PLIN družba za
distribucijo plina HR, SI 2.5 09/2019
URBAN-E: e-Mobilty, Infrastructure and Innovative Innovation PETROL d.d., Ljubljana (SI) HR, SI, SK 4.5 12/2020
Project name Project
category Project promoter
Member States / Countries involved
Total costs Project end
date
Intermodal Services in Ljubljana, Bratislava and Zagreb
Improvement of freight routes and Udine Node Rail RFI spa IT 186.0 12/2025
Completion of the upgrading to two tracks of the Udine-Cervignano railway line
Rail RFI spa IT 170.0 12/2030
Upgrading of the railway line Trieste-Divača Rail MoT IT 40.0 12/2026
All italian corridor sections: Upgrade of train length to 740 m
Rail RFI S.p.A. IT 100.0 12/2021
Speed upgrading works Rail RFI S.p.A. IT 35.0 05/2018
New high speed line Venice-Trieste Rail RFI S.p.A. IT 7,447.0 n.a.
Upgrading of Venezia-Trieste railway line (speed up works) Rail RFI S.p.A. IT 1,800.0 12/2031
Venice node: Upgrade of the “Linea dei Bivi” railway line Rail RFI S.p.A. IT 180.0 12/2030
Upgrading of Venezia node Rail RFI S.p.A. IT 80.0 12/2021
Bologna- Padua railway line: upgrading of the traffic management system
Rail RFI S.p.A. IT 160.0 12/2021
Bologna High Speed Railway Junction: interconnection to Venezia line
Rail RFI S.p.A. IT 36.2 12/2017
Speed increase of the Adriatic Line Bologna-Bari Rail RFI spa IT 350.0 12/2018
Technological upgrading of the Bologna-Castelbolognese railway line
Rail RFI S.p.A. IT 30.0 12/2021
Faenza cut off line to link Faenza-Granarolo-Ravenna and Faenza-Rimini lines, aimed to improvement of freight traffic to/from Ravenna Porto
Rail Emilia Romagna Region
(network RFI) IT 19.4 n.a.
Works to allow train length operation to 750 m along the corridor
Rail RFI spa IT 80.0 12/2026
Bologna Underground (Servizio Ferroviario Metropolitano di Bologna)
Rail Città Metropolitana di
Bologna IT 372.7 n.a.
Enhancement of signalling system to ERTMS Rail ERTMS RFI S.p.A. IT 57.0 12/2020
Enhancement of signalling system to ERTMS Rail ERTMS RFI S.p.A. IT 48.0 12/2020
Enhancement of signalling system to ERTMS Rail ERTMS RFI S.p.A. IT 112.0 12/2030
Project name Project
category Project promoter
Member States / Countries involved
Total costs Project end
date
Cross-border Road section between Italy and Slovenia Road ANAS S.p.A. IT 3.0 12/2019
Improvement of the R.A. 14 motorway Road ANAS S.p.A. IT 8.0 12/2017
R.A.13 Interventions Road ANAS S.p.A. IT 3.0 02/2017
New toll station of Alvisopoli junction with major road SS14 Road Autovie Venete S.p.A. IT 28.7 08/2028
Widening of motorway A4 with a third lane (from 2x2 to 3x2 lanes): Sub section N.1 San Donà di Piave - Alvisopoli
Road Autovie Venete S.p.A. IT 162.5 06/2018
Widening of motorway A4 with a third lane (from 2x2 to 3x2 lanes): Sub section N.2 San Donà di Piave - Alvisopoli
Road Autovie Venete S.p.A. IT 182.9 06/2028
Widening of motorway A4 with a third lane (from 2x2 to 3x2 lanes): Sub section N.3 San Donà di Piave - Alvisopoli
Road Autovie Venete S.p.A. IT 227.9 06/2029
Widening of motorway A4 with a third lane (from 2x2 to 3x2 lanes): Sub section N.1 Gonars - Villesse
Road Autovie Venete S.p.A. IT 65.4 03/2018
Widening of motorway A4 with a third lane (from 2x2 to 3x2 lanes): Sub section N.2 Gonars - Villesse
Road Autovie Venete S.p.A. IT 48.6 08/2019
Widening of motorway A4 with a third lane (from 2x2 to 3x2 lanes): Sub section N.3 Gonars - Villesse
Road Autovie Venete S.p.A. IT 91.3 04/2028
Widening of motorway A4 with a third lane (from 2x2 to 3x2 lanes): Alvisopoli - Gonars, new interchange of Palmanova and by-pass major road SS352 - 1 section
Road Autovie Venete S.p.A. IT 442.3 07/2019
Venice-Trieste Motorway section: upgrading works on the tollgate barriers of Portogruaro
Road Autovie Venete S.p.A. IT 4.4 10/2017
Venice-Trieste Motorway section: Revamping of existing barriers
Road Autovie Venete S.p.A. IT 14.9 04/2018
S. Donà di Piave barracks Road Autovie Venete S.p.A. IT 1.9 06/2027
Further works for modernization and extension service areas
Road Autovie Venete S.p.A. IT 3.9 02/2029
Rehabilitation plan acoustic: additional works of acoustic barriers
Road Autovie Venete S.p.A. IT 10.2 12/2022
New building service centre of Palmanova Road Autovie Venete S.p.A. IT 13.3 09/2017
Acoustic Rehabilitation plan: acoustic barriers of Duino Road Autovie Venete S.p.A. IT 5.5 06/2017
Project name Project
category Project promoter
Member States / Countries involved
Total costs Project end
date
Aurisina
Third lane upgrading of the A13 Motorway between Monselice and Padova
Road Autostrade per l’Italia S.p.A. IT To be
defined n.a.
Third lane upgrading of the A13 Motorway between Bologna and Ferrara
Road Autostrade per l’Italia S.p.A. IT To be
defined 12/2020
Upgrading of the Bologna tolled A14 and un-tolled ring roads
Road Autostrade per l’Italia S.p.A. IT To be
defined n.a.
Realisation of the metropolitan expressway road north of the A14 between Ozzano and Bologna
Road ANAS S.p.A. IT 37.6 12/2020
Fourth lane upgrading of the A14 Motorway between Bologna and Castelbolognese
Road Autostrade per l’Italia S.p.A. IT 600.0 12/2020
ITS Road 3 (Installation of several road telematics systems) Road ANAS S.p.A. IT 3.2 n.a.
First phase: construction of a new quay called “Logistic Platform”
Maritime Triest Port Authority IT 132.4 12/2018
Second phase: construction of a new quay called “Logistic Platform”, with a wharf of about 600 meters in length and a depth of 12-14 meters
Maritime Triest Port Authority IT 206.5 12/2020
Enlargement of the container terminal at quay VII increasing the potential up to a maximum of 1,200,000 TEU (dimension 200m, 18m depth)
Maritime Triest Port Authority IT 187.0 12/2020
Realization of a new Ro-Ro terminal in the Noghere valley area with a “working” draught of no less than 12 meters for berthing RO-RO vessels and a total surface of 430.000 sqm (first phase)
Maritime Triest Port Authority IT 27.0 12/2020
Realization of a new Ro-Ro terminal in the Noghere valley area with a “working” draught of no less than 12 meters for berthing RO-RO vessels and a total surface of 430.000 sqm (second phase)
Maritime Triest Port Authority IT 126.0 12/2020
Second phase of passengers terminal upgrade encompassing the enlargement of the related quay
Maritime Triest Port Authority IT 14.0 12/2020
Project name Project
category Project promoter
Member States / Countries involved
Total costs Project end
date
Upgrading of the port railway system to operate longer trains coherently with the on-going upgrading action of the marshalling yard in Campo Marzio
Maritime Triest Port Authority IT 20.0 12/2020
Construction of a new rail connection from the Logistic Platform, the Timber terminal and the steel plant in Servola with the existing national rail system
Maritime Triest Port Authority IT 16.0 12/2020
Capital dredging of the port in the area of Noghere Muggia Maritime Triest Port Authority IT 8.0 12/2020
Railway works inside and outside the port area of Trieste Maritime RFI S.p.A. IT 77.0 12/2026
Direct Connection to Venice Port Maritime RFI S.p.A. and Venice Port
Authority IT 175.0 12/2030
Definitive Design of the Venice Onshore Offshore Port System for large ships
Maritime Venice Port Authority IT 2,965.0 12/2022
Upgrading to 2 tracks railway line in order to support growth in traffic flows due also to the realisation of Fusina Ro-Ro terminal (Adriamos EU project)
Maritime Venice Port Authority IT 7.0 12/2025
Upgrade of rail links between the South Industrial Area of Marghera and Marghera Scalo Station and redesign of road infrastructure
Maritime Venice Port Authority (Venezia Municipality)
IT 32.0 12/2020
New rolling stock vehicle maintenance and repair depot in response to increasing demand for this kind of services by port’s railway operators
Maritime Venice Port Authority IT 3.5 12/2019
Realisation of an information system in order to real time monitor maritime traffic and forecast the maritime traffic levels in the last maritime mile
Maritime Venice Port Authority IT 0.6 12/2019
Railway telematics systems for shunting operations (SIMA) and its integration with PCS and information systems of other subject involved in developing rail services
Maritime Venice Port Authority IT 1.6 12/2018
West Industrial Canal Dredging Maritime Venice Port Authority IT 5.3 12/2018
Broadband connection Maritime Venice Port Authority IT 6.0 12/2018
New access to Passengers Terminal of Marittima Maritime Venice Port Authority IT 139.0 12/2018
Project name Project
category Project promoter
Member States / Countries involved
Total costs Project end
date
Ravenna Port Hub - 1st phase Maritime Ravenna Port Authority IT 235.0 12/2023
Ravenna Port Hub - 2nd phase Maritime Ravenna Port Authority IT 129.0 12/2027
Ro-Ro terminal upgrading Maritime Ravenna Port Authority IT 31.0 12/2023
ICT services for the port community: interoperability of PCS with the National Maritime Single Window; the National Logistics Platform and the Customs ICT platform
Maritime Ravenna Port Authority IT 3.0 12/2018
Dredged material treatment plant Maritime Ravenna Port Authority IT 20.0 12/2020
Improvement of Data connection infrastructure for port services
Maritime Ravenna Port Authority IT 1.3 12/2019
Upgrading of the railway link to the port of Ravenna Maritime RFI S.p.A. IT 70.0 12/2026
SS 309DIR: upgrading works by doubling the width of the existing road
Maritime ANAS IT 150.0 12/2020
SS 16 Upgrading Maritime ANAS IT 72.0 n.a.
Upgrading of the road connection between SS 16 and SS 309Dir
Maritime ANAS IT 25.0 12/2020
Functional and technical restructuring of Pier VI in the Port of Trieste
MoS Triest Port Authority IT 6.5 12/2018
Venezia Marco Polo Airport: Last mile rail connection with conventional Venice - Trieste railway line (SMFR)
Airport RFI S.p.A. IT 425.0 12/2026
SS 14 bypass at Campalto and Tessera Airport ANAS S.p.A. IT 35.0 n.a.
Venice Airport: new Parking and Bus terminal Airport ENAC S.p.A. / SAVE S.p.A. IT 75.0 12/2025
Venice Airport: new connection between the Underground railway station, the passenger terminal, public transport and car parkings
Airport ENAC S.p.A. / SAVE S.p.A. IT 50.0 12/2022
Venice airport: external areas and internal ways (Aree scoperte e viabilità interna)
Airport ENAC S.p.A. / SAVE S.p.A. IT 80.0 12/2025
Venice Airport: expansion of the passenger terminal Airport ENAC S.p.A. / SAVE S.p.A. IT 300.0 12/2025
Bologna airport: People Mover Airport Emilia Romagna
Region IT 119.1 12/2018
Project name Project
category Project promoter
Member States / Countries involved
Total costs Project end
date
Bologna airport: People Mover Footbridge Airport Bologna Airport IT 1.7 12/2018
Construction of Turn Pad and taxiway B expansion Airport Bologna Airport IT 4.0 12/2019
Investment to meet regulatory requirements (ex. New EASA, ICAO)
Airport Bologna Airport IT 0.3 12/2020
Express car park expansion Airport Bologna Airport IT 2.0 12/2017
Construction of new boarding piers in Bologna Airport Airport Bologna Airport IT 2.6 12/2018
Bologna airport: III site apron Airport Bologna Airport IT 15.2 12/2019
Bologna airport: realisation of a new East multistory parking
Airport Bologna Airport IT 15.4 12/2020
Bologna airport: realisation of a new departure lounge and a new pier
Airport Bologna Airport IT 50.6 12/2020
Bologna airport: I site apron extension Airport Bologna Airport IT 2.8 12/2018
Bologna airport: de-icing apron and structure Airport Bologna Airport IT 5.8 12/2018
Improvement of the accessibility by railway to the Cervignano Core RRT
Multimodal RFI S.p.A. IT To be
defined 12/2030
Enhancing the efficiency of the new container terminal of Interporto di Padova
Multimodal Interporto di Padova S.p.A. IT 16.2 12/2019
Enhancing Interporto di Padova - Step 2: ancillary measures and ICT solutions for optimising terminal operations, accessibility and interconnections
Multimodal Interporto di Padova S.p.A. IT 5.9 12/2020
ICT system application in RRT on the Italian part of the corridor, for operations synchronization and management efficiency with other nodes
Multimodal Interporto di Bologna S.p.A. IT 0.4 12/2020
LNG supply facilities implementation at the Port of Venezia Innovation Venice Port Authority IT 100.0 12/2020
LNG supply facilities implementation at the Port of Ravenna
Innovation Ravenna Port Authority IT 77.5 09/2020
GAINN4CORE Innovation Ministero delle
Infrastrutture e dei Trasporti (project coordinator)
IT 43.9 09/2019
EUROSKY - Environmental and safety improvements Innovation BMT GROUP LIMITED IT and other 18.4 12/2017
Project name Project
category Project promoter
Member States / Countries involved
Total costs Project end
date
Member States
CORE - Safety improvements Innovation BMT GROUP LIMITED IT and other
Member States 48.8 12/2018
MedTIS II- Overall Project Road FR ASFA(C) MIT (NCP)
IT, ES, FR, PT 53.3 12/2018
e-Freight Implementation Action (e-Impact) Innovation Administracao do Porto de
Lisboa, S.A. IT, PL, PT 3.9 06/2017
SESAR Deployment Programme implementation 2015 - Cluster 2
Airport SESAR Deployment Manager
(NATS (En-Route) Plc on behalf)
IT, SI and other 18 Member States
854.9 12/2020
Upgrading of Instrument Flight Procedures to a PBN standard
Airport Transport Systems Catapult IT, UK 4.8 12/2020
Air Traffic Management (ATM) system deployment Airport State Enterprise “Oro
navigacija” LT, PL 13.6 11/2018
Development of suburban railway network in Tricity Rail
Urząd Marszałkowski Województwa Pomorskiego
(Pomorska Kolej Metropolitalna S.A.)
PL 11.7 12/2017
Elaboration of documentation for construction of collission free passing through railway line E 65 together with access roads network
Rail Municipality of Gdansk PL 1.0 06/2020
Works on the Warsaw ring railway (section Warszawa Golabki\ Warszawa Zachodnia -Warszawa Gdanska)
Rail PKP Polskie Linie Kolejowe
S.A. PL 82.2 12/2018
Works on diametrical line in Warsaw section Warszawa Wschodnia - Warszawa Zachodnia
Rail PKP Polskie Linie Kolejowe
S.A. PL 239.0 12/2024
Modernisation of railway line Warszawa – Łódź, lot A section Warszawa Zachodnia – Skierniewice (Miedniewice) and lot C - other works
Rail PKP Polskie Linie Kolejowe
S.A. PL 306.9 06/2018
Works on railway line Warszawa Wlochy - Grodzisk Mazowiecki (line no. 447)
Rail PKP Polskie Linie Kolejowe
S.A. PL 82.7 06/2019
Project name Project
category Project promoter
Member States / Countries involved
Total costs Project end
date
Works on railway line C-E 65 section Bydgoszcz - Tczew Rail PKP Polskie Linie Kolejowe
S.A. PL 167.3 n.a.
Works on railway line C-E 65 section Chorzów Batory - Tarnowskie Góry - Karsznice - Inowrocław - Bydgoszcz - Maksymilianowo
Rail PKP Polskie Linie Kolejowe
S.A. PL 488.9 10/2022
Elaboration of Pre-design documentation for Modernisation of railway line E65 section Chorzów Batory – Tarnowskie Góry – Karsznice – Inowrocław – Bydgoszcz – Tczew
Rail PKP Polskie Linie Kolejowe
S.A. PL 1.6 04/2017
Works on main passenger lines (E 30 and E 65) in Śląsk area, phase I: line E 65 section Będzin – Katowice – Tychy – Czechowice Dziedzice – Zebrzydowice ; LOT C
Rail PKP Polskie Linie Kolejowe
S.A. PL 141.6 12/2023
Works on main passenger lines (E 30 and E 65) in Śląsk area, phase I: line E 65 section Będzin – Katowice – Tychy – Czechowice Dziedzice – Zebrzydowice, lots A, A1
Rail PKP Polskie Linie Kolejowe
S.A. PL 442.2 n.a.
Works on main passenger lines (E 30 and E 65) in Śląsk area, phase I: line E 65 section Będzin – Katowice – Tychy – Czechowice Dziedzice – Zebrzydowice, lots B, D
Rail PKP Polskie Linie Kolejowe
S.A. PL 370.5 12/2023
Works on main passenger lines (E 30 and E 65) in Śląsk area, phase I: line E 65 section Będzin – Katowice – Tychy – Czechowice Dziedzice – Zebrzydowice - preparatory works
Rail PKP Polskie Linie Kolejowe
S.A. PL 9.0 06/2019
Works on railway line no. 139 section Czechowice Dziedzice - Bielsko Biała - Zwardoń (state border)
Rail PKP Polskie Linie Kolejowe
S.A. PL 47.8 11/2023
Works on railway lines no. 14 and 811 on the section Łódź Kaliska-Zduńska Wola-Ostrów Wielkopolski, stage I: Łódź Kaliska-Zduńska Wola
Rail PKP Polskie Linie Kolejowe
S.A. PL 113.1 05/2020
Streamlining of Łódź Railway Node (TEN-T), phase I, section Łódź Widzew - Łódź Fabryczna
Rail PKP Polskie Linie Kolejowe
S.A. PL 352.6 12/2017
Streamlining the Łódź Railway Node (TEN-T), phase II, section Łódź Fabryczna – Łódź Kaliska/Łódź Żabieniec
Rail PKP Polskie Linie Kolejowe
S.A. PL 459.2 11/2021
Project name Project
category Project promoter
Member States / Countries involved
Total costs Project end
date
Works on railway lines no. 15, 16 on section Łódź Kaliska – Zgierz – Kutno
Rail PKP Polskie Linie Kolejowe
S.A. PL 66.9 09/2021
Construction of multimodal integrated nodes together with construction and reconstruction of railway stops in the area of Łódzkie Voivodship
Rail PKP Polskie Linie Kolejowe
S.A. PL 9.6 12/2021
Completion of construction of the eastern viaduct on Łódź Kaliska station
Rail PKP Polskie Linie Kolejowe
S.A. PL 9.6 12/2021
Revitalisation of railway line no. 16 Łódź Widzew – Kutno on section Zgierz – Ozorków
Rail PKP Polskie Linie Kolejowe
S.A. PL 32.3 09/2021
Construction of Nowoweglowa street in Lodz between Wierzbowa and Kopcinskiego streets with the expansion of the intersection of Kopcinskiego street
Rail Urząd Miasta Łodzi PL 8.6 12/2017
Development of Szczecin Metropolitan Rail, using the existing sectors of railway lines No. 406, 273, 351
Rail Stowarzyszenie
Szczecińskiego Obszaru Metropolitalnego
PL 177.8 12/2022
Works on the E 59 railway line, Poznan Glowny -Szczecin Dabie section
Rail PKP Polskie Linie Kolejowe
S.A. PL 531.6 12/2020
Works on the E 59 railway line, Wronki - Słonice section Rail PKP Polskie Linie Kolejowe
S.A. PL 349.7 12/2023
Works on by-passing line in Poznań (section Poznań Górczyn - Poznań Starołęka - Poznań Franowo - Swarzędz/Zieliniec - Kiekrz)
Rail PKP Polskie Linie Kolejowe
S.A. PL 10.5 n.a.
Modernisation of the road infrastructure between Poznań Główny railway station and the network of logistic centres in South-East part of Poznań
Rail Miasto Poznań PL 220.0 12/2022
The modernization of the railway infrastructure within the station platforms Poznan Central on the western side with adaptation for disabled people
Rail
PKP Polskie Linie Kolejowe S.A. (national rail
infrastructure manager in Poland)
PL 11.3 12/2017
Modernisation of railway line E59 Wrocław – Poznań, Rail PKP Polskie Linie Kolejowe PL 157.1 12/2017
Project name Project
category Project promoter
Member States / Countries involved
Total costs Project end
date
phase III, section Czempiń – Poznań S.A.
Works on the E 59 railway line on the Wroclaw-Poznan section, stage IV, border of Dolnoslaskie Voivodeship-Czempin section
Rail PKP Polskie Linie Kolejowe
S.A. PL 364.8 07/2020
Modernisation of railway line E59 Wrocław – Poznań, phase II, section Wrocław – Dolnosląskie Voivodship border
Rail PKP Polskie Linie Kolejowe
S.A. PL 232.7 12/2017
Works on railway line C-E 30 section Opole Groszowice - Jelcz - Wrocław Brochów
Rail PKP Polskie Linie Kolejowe
S.A. PL 134.6 n.a.
Improvement of transport services through improvement of technical conditions of railway line 132 section Błotnica Strzelecka–Opole Groszowice
Rail PKP Polskie Linie Kolejowe
S.A. PL 45.7 06/2017
Works on railway line E 30 section Kędzierzyn Koźle - Opole Zachodnie
Rail PKP Polskie Linie Kolejowe
S.A. PL 150.2 03/2022
Works on railway line E 30 section Kędzierzyn Koźle – Opole Zachodnie (preparatory works)
Rail PKP Polskie Linie Kolejowe
S.A. PL 0.2 08/2016
Works on railway line E-59 section Kędzierzyn Koźle - Chałupki (state border)
Rail PKP Polskie Linie Kolejowe
S.A. PL 47.0 n.a.
Works on main passenger lines (E 30 and E 65) in Śląsk area, phase II: line E 30 section Katowice - Chorzów Batory and Gliwice Łabędy
Rail PKP Polskie Linie Kolejowe
S.A. PL 78.0 n.a.
Works on main passenger lines (E 30 and E 65) in Śląsk area, phase III: line E 30 section Chorzów Batory - Gliwice Łabędy
Rail PKP Polskie Linie Kolejowe
S.A. PL 262.9 n.a.
Acoustic modernisation of freight cars to adapt them to the functional and system requirements
Rail PKP Cargo S.A. PL 8.9 12/2020
Safety improvement on rail/road crossings Rail PKP Polskie Linie Kolejowe
S.A. PL 95.6 12/2021
Improvement of technical condition of passengers services infrastructure (including TSI PRM)
Rail PKP Polskie Linie Kolejowe
S.A. PL 86.0 02/2022
Project name Project
category Project promoter
Member States / Countries involved
Total costs Project end
date
Modernisation of railway line E30, phase II. Implementation of ERTMS/ETCS and ERTMS/GSM-R in Poland on section Legnica - Wrocław - Opole
Rail ERTMS PKP Polskie Linie Kolejowe
S.A. PL 26.5 09/2018
Modernisation of railway line E65/C-E65 on section Warszawa - Gdynia in the scope of supreme layer of LCC, ETRMS/ETCS/GSM-R, DSAT and traction power supply
Rail ERTMS PKP Polskie Linie Kolejowe
S.A. PL 142.0 05/2018
Construction of ERTMS/ETCS on core TEN-T network lines Rail ERTMS PKP Polskie Linie Kolejowe
S.A. PL 356.8 12/2023
Construction of GSM-R infrastructure on railway lines according to the schedule from the ERTMS National Implementation Programme, phase I - preparatory works
Rail ERTMS PKP Polskie Linie Kolejowe
S.A. PL 0.0 08/2016
Construction of GSM-R infrastructure on PKP PLK S.A. railway lines according to the ERTMS National Implementation Programme
Rail ERTMS PKP Polskie Linie Kolejowe
S.A. PL 670.2 05/2023
Extension of Szadółki junction within national road S6 together with construction of Nowa Jabłoniowa Street
Road Municipality of Gdansk PL 92.0 12/2023
Extension of Kowale junction within the national road S6 together with connecting roads
Road
Municipality of Gdansk Municipality of Pruszcz
Gdański Minicipality of Kolbudy
PL To be
defined 12/2023
S7: section Koszwały – Kazimierzowo Road Generalna Dyrekcja Dróg
Krajowych i Autostrad PL 880.1 10/2018
S7: section Miłomłyn – Olsztynek Road Generalna Dyrekcja Dróg
Krajowych i Autostrad PL 628.7 08/2017
S7: section Nidzica – Napierki Road Generalna Dyrekcja Dróg
Krajowych i Autostrad PL 150.5 05/2017
S7: section Napierki – Płońsk Road Generalna Dyrekcja Dróg
Krajowych i Autostrad PL 632.6 06/2021
S7: section Płońsk – Warszawa Road Generalna Dyrekcja Dróg
Krajowych i Autostrad PL 944.1 05/2024
Project name Project
category Project promoter
Member States / Countries involved
Total costs Project end
date
Modernisation of Marsa & Żołnierska streets, section Marsa junction - city limits, phase II
Road Urząd m.st. Warszawy PL 36.0 12/2017
Modernisation of Wał Miedzeszyński street, section Trakt Lubelski st - junction with planned S2 expressway
Road Urząd m.st. Warszawy PL 19.1 12/2019
A1 motorway: Tuszyn - Piotrków Trybunalski Road Generalna Dyrekcja Dróg
Krajowych i Autostrad PL 161.6 12/2020
A1: Pyrzowice-Częstochowa by-pass Road Generalna Dyrekcja Dróg
Krajowych i Autostrad PL 624.9 06/2019
A1: Piotrków Trybunalski - Częstochowa Road Generalna Dyrekcja Dróg
Krajowych i Autostrad PL 735.4 12/2020
S1: express road section Kosztowy - Bielsko-Biała Road Generalna Dyrekcja Dróg
Krajowych i Autostrad PL 853.0 11/2022
S1: Construction of S1 expressway Bielsko Biała – state border , section Węgierska Górka bypass
Road Generalna Dyrekcja Dróg
Krajowych i Autostrad PL 350.7 12/2020
S3: express road Świnoujście - Szczecin Road Generalna Dyrekcja Dróg
Krajowych i Autostrad PL 348.2 04/2023
Development of Western Ring Road of Szczecin, including construction of permanent crossing via the Oder River between the road nodes at towns of Police and Święta
Road Gmina Miasto Szczecin PL 139.5 12/2023
S3: Sulechów (Kruszyna junction) – Nowa Sól, II lane of Gorzów Wielkopolski by-pass and II lane of Międzyrzecze by-pass
Road Generalna Dyrekcja Dróg
Krajowych i Autostrad PL 321.7 07/2019
S3: Nowa Sól (Nowe Miasto junction) – Legnica (A4, Legnica II junction)
Road Generalna Dyrekcja Dróg
Krajowych i Autostrad PL 694.3 07/2019
A4 motorway: extension of A4 motorway on section Wrocław - Legnica (within section Wrocław-Krzyżowa); construction of third lane
Road Generalna Dyrekcja Dróg
Krajowych i Autostrad PL 825.7 n.a.
National Road Traffic Management System on TEN-T network, phase I
Road Generalna Dyrekcja Dróg
Krajowych i Autostrad PL 145.0 12/2020
Construction of a pilot docking station, as a part of an LNG Road Remontowa LNG Systems Sp. PL 1.9 12/2020
Project name Project
category Project promoter
Member States / Countries involved
Total costs Project end
date
distribution system based on cryogenic tank containers z o.o.
LEM project – pilot implementation of electromobility along the TEN-T base network
Road Lotos Paliwa Sp.z o.o. PL 0.8 12/2020
Improvement of railway connection to Maritime Port in Gdynia
Maritime PKP Polskie Linie Kolejowe
S.A. PL 190.9 12/2020
Reconstruction of Kwiatkowski viaduct in Gdynia to the full TEN-T requirements
Maritime Urząd Miasta w Gdyni PL 95.6 12/2027
Via Maris - Construction of north by-pass of Tricity agglomeration (works partly affecting last mile connection to Gdynia port)
Maritime Generalna Dyrekcja Dróg
Krajowych i Autostrad PL 380.0 12/2024
Via Maris - Droga Czerwona road in Gdynia (from Janka Wiśniewskiego Street to Gdynia-Północ junction)
Maritime
Urząd Miasta Gdyni / Zarząd Morskiego Portu Gdynia / Generalna Dyrekcja Dróg
Krajowych i Autostrad
PL 200.0 12/2024
Via Maris - Further integration and modernization of national roads and motorways links with the port’s road infrastructure
Maritime
Urząd Miasta Gdyni / Zarząd Morskiego Portu Gdynia / Generalna Dyrekcja Dróg
Krajowych i Autostrad
PL 76.0 12/2027
Construction of public ferry terminal in Gdynia Port Maritime Zarząd Morskiego Portu
Gdynia PL 37.0 12/2020
Deepening the approach fairway and internal waters of Gdynia Port, phase II
Maritime Urząd Morski Gdynia PL 108.8 12/2019
Deepening the approach fairway and internal waters of Gdynia Port Phase I and III. Reconstruction of Quay areas in Gdynia Port, phase II and III
Maritime Zarząd Morskiego Portu
Gdynia PL 133.8 12/2020
Integrated system of navigation marking including e-Navigation
Maritime Urząd Morski w Gdyni PL 9.6 12/2019
Construction of GMDSS system for maritime administration Maritime Urząd Morski w Gdyni PL 3.6 12/2019
Reconstruction of railway access to western part of Gdynia Port
Maritime Zarząd Morskiego Portu
Gdynia PL 17.7 06/2020
Project name Project
category Project promoter
Member States / Countries involved
Total costs Project end
date
Construction of port infrastructure for sanitary sewerage collection
Maritime Zarząd Morskiego Portu
Gdynia PL 5.2 07/2019
Creating new infrastructure on the extended port areas (including the construction of the Outer Port)
Maritime Zarząd Morskiego Portu
Gdynia PL 1,157.7 12/2027
Reconstruction of Quay areas in Gdynia Port, phase IV Maritime Zarząd Morskiego Portu
Gdynia PL 52.6 12/2027
Further adaptation of the maritime access infrastructure to new infrastructure created on the extended port areas
Maritime Zarząd Morskiego Portu Gdynia/ Urząd Morski
Gdynia PL 359.2 12/2027
Increasing the throughput capacity of rail tracks within the administrative borders of the Port of Gdynia according to TEN-t requirements
Maritime Zarząd Morskiego Portu
Gdynia PL 59.8 12/2027
Integration of port with its hinterland, especially through intermodal terminals
Maritime Under evaluation / Zarząd Morskiego Portu Gdynia
PL 70.5 12/2027
Implementation of PCS, and integration of IT systems in the port, increasing efficiency of serving heavy loads and trucks in the Port of Gdynia
Maritime Under evaluation / National
Administration / Zarząd Morskiego Portu Gdynia
PL 4.8 01/2027
Development of Multimodal Platform „Logistics Valley” Maritime Zarząd Morskiego Portu
Gdynia PL 104.0 01/2027
Reconstruction of southern access to Gdynia Port Maritime Urząd Morski w Gdyni PL 172.1 12/2024
Extension and modernisation of road network in External Port of Gdańsk
Maritime Municipality of Gdansk PL 12.3 12/2020
Design and environmental documentation for expansion and modernization of the road and rail infrastructure at the Port of Gdańsk
Maritime Zarząd Morskiego Portu
Gdańsk PL 1.1 03/2018
Extension and modernisation of road and railway network in the Gdańsk outer port
Maritime Zarząd Morskiego Portu
Gdańsk PL 28.8 12/2020
Improvement of railway connection to Maritime Port in Gdańsk
Maritime PKP Polskie Linie Kolejowe
S.A. PL 141.5 12/2020
Project of improvement of railway connection to Gdańsk Maritime PKP Polskie Linie Kolejowe PL 76.2 10/2018
Project name Project
category Project promoter
Member States / Countries involved
Total costs Project end
date
Port (bridge + double track railway line) S.A.
Modernisation of fairway, expansion of the quays and improvement of navigation in the Internal Port in Gdańsk
Maritime Zarząd Morskiego Portu
Gdańsk PL 110.3 12/2020
Expansion and modernization of core network node in the Port of Gdańsk concerning road and rail infrastructure
Maritime Zarząd Morskiego Portu
Gdańsk PL 22.0 12/2022
Expansion and modernization of core network node in the Port of Gdańsk concerning road and rail infrastructure
Maritime Zarząd Morskiego Portu
Gdańsk PL 16.0 12/2022
Studies for the integrated IT system aiding traffic and environmental management for freight transport
Maritime Zarząd Morskiego Portu
Gdańsk PL 1.2 12/2019
Integrated IT system aiding traffic and environmental management for freight transport
Maritime Zarząd Morskiego Portu
Gdańsk PL 2.9 06/2021
Construction of the quay in the external port Maritime Zarząd Morskiego Portu
Gdańsk PL 50.0 01/2022
Modernisation of entrance to Inner port (in Gdańsk), phase IIIa
Maritime Urząd Morski w Gdyni PL 40.6 09/2020
Modernisation of entrance to Inner port (in Gdańsk), phase IIIb
Maritime Urząd Morski w Gdyni PL 17.5 12/2023
Modernisation of entrance to Inner port (in Gdańsk), phase IV
Maritime Urząd Morski w Gdyni PL 35.9 12/2030
Modernisation of protective breakwaters system in Northern Port in Gdańsk
Maritime Urząd Morski w Gdyni PL 179.3 10/2020
Modernisation of seaway into Northern Port in Gdańsk Maritime Urząd Morski w Gdyni PL 28.7 01/2019
Gdańsk Northern Port - construction of port of refuge for ships in distress and threatening ecological disaster along with breakwater infrastructure and anti-flood barrage
Maritime Urząd Morski w Gdyni PL 179.3 12/2023
Breakwaters of development areas in the Northern Port of Gdańsk
Maritime Urząd Morski w Gdyni PL 191.2 12/2030
Deepwater Container Terminal Gdańsk - Construction of new part of the terminal
Maritime DCT Gdansk S.A. PL To be
defined 12/2019
Modernisation of road access to Szczecin Port: Maritime Gmina Miasto Szczecin PL 69.1 12/2020
Project name Project
category Project promoter
Member States / Countries involved
Total costs Project end
date
reconstruction of communication network in the area of Międzyodrze
Improvement of Szczecin Port access in the area of Kaszubski Basin
Maritime Zarząd Morskiego Portu
Szczecin i Świnoujście PL 58.8 06/2022
Improvement of railway connection to Maritime Ports in Szczecin and Świnoujście
Maritime PKP Polskie Linie Kolejowe
S.A. Port of Szczecin/Świnoujście
PL 143.7 12/2020
Modernisation of the fairway Świnoujście-Szczecin to a depth of 12.5m
Maritime Urząd Morski w Szczecinie PL 331.8 12/2022
Extension and modernisation of technical infrastructure in Szczecin and Świnoujście Ports
Maritime Zarząd Morskiego Portu
Szczecin i Świnoujście PL 28.2 02/2022
Functional and environmentally friendly access to Świnoujście Port infrastructure, phase I
Maritime Gmina Miasto Świnoujście PL 22.9 12/2019
Functional and environmentally friendly access to Świnoujście Port infrastructure, phase II
Maritime Gmina Miasto Świnoujście PL 12.9 12/2021
Construction of deep sea berth at the outer port in Świnoujście Construction of deep-water quays in the ports of Szczecin and Świnoujście
Maritime Zarząd Morskiego Portu
Szczecin i Świnoujście PL 69.8 12/2021
Construction of port infrastructure on development areas of Ostrow Grabowski Peninsula
Maritime Zarząd Morskiego Portu
Szczecin i Świnoujście PL
To be defined
12/2027
Improvement of Port Szczecin access in the area of Dębicki Basin
Maritime Zarząd Morskiego Portu
Szczecin i Świnoujście PL 83.8 02/2021
Development of multimodal infrastructure and facilities at the Container Terminal Świnoujscie
Maritime PHŚ PL 11.9 n.a.
Gdansk Airport - extension of registered and hand luggage and passenger control system
Airport Gdansk Airport PL 15.7 12/2020
Gdansk Airport - airside infrastructure including taxiways, aprons and de-icing aprons
Airport Gdansk Airport PL 10.1 12/2023
Gdansk Airport - extension of cargo and passenger Airport Gdansk Airport PL 24.7 12/2023
Project name Project
category Project promoter
Member States / Countries involved
Total costs Project end
date
terminals
Gdansk Airport - extension of navigation light system on auxiliary direction no 1.1
Airport Gdansk Airport PL 3.4 12/2023
Modernisation of Marynarska street, section Taśmowa st - Rzymowskiego st
Airport Urząd m.st. Warszawy PL 11.5 12/2017
Construction of new cargo handling terminal at the Warsaw Chopin Airport (works)
Airport LS Airport Services S.A. &
DHL Express Poland PL 15.1 12/2017
Modernization of airport infrastructure Airport Port Lotniczy Warszawa-
Okęcie PL 172.7 06/2016
Reconstruction of road system in front of the passenger terminal of the Warsaw Chopin Airport
Airport Port Lotniczy Warszawa-
Okęcie PL 19.5 12/2020
Extension of the north pier of the passenger terminal of Warsaw Chopin Airport
Airport Port Lotniczy Warszawa-
Okęcie PL 62.8 12/2019
Alternation of safety and documents check points and increase of capacity of Terminal A at the Warsaw Chopin Airport
Airport Port Lotniczy Warszawa-
Okęcie PL 8.0 12/2017
Construction of a new cargo terminal at the Warsaw Chopin Airport
Airport Port Lotniczy Warszawa-
Okęcie PL 15.6 12/2019
Katowice Airport -Redevelopment of the runway into the taxiway
Airport Port Lotniczy Katowice PL 8.0 01/2018
Katowice Airport - Redevelopment of passenger terminals A and B
Airport Port Lotniczy Katowice PL 6.2 06/2018
Katowice Airport - Construction of the new air traffic control tower
Airport PAŻP PL To be
defined n.a.
Katowice Airport - Adaptation of the movement area to CAT II
Airport Port Lotniczy Katowice PL 2.6 01/2018
Katowice Airport - Construction of the base of the technical support
Airport Port Lotniczy Katowice PL 4.5 12/2020
Katowice Airport - Installation for storing the aviation fuel Airport Port Lotniczy Katowice PL 0.6 12/2019
Katowice Airport - expansion of Cargo apron - stage IIa and Airport Port Lotniczy Katowice PL 9.6 09/2020
Project name Project
category Project promoter
Member States / Countries involved
Total costs Project end
date
IIb
Katowice Airport - extension of Terminal Cargo Airport Port Lotniczy Katowice PL 11.6 12/2027
Katowice Airport - Multi-stage parking extension Airport Port Lotniczy Katowice PL 8.1 08/2020
Katowice Airport - Construction of the second, parallel runway
Airport Port Lotniczy Katowice PL 65.7 12/2033
Katowice Airport - Extension of aprons Airport Port Lotniczy Katowice PL 23.9 12/2029
Katowice Airport - Construction of the position of the insulated plane with the de/anti-icing stand.
Airport Port Lotniczy Katowice PL 7.2 12/2025
Katowice Airport - Construction of the new passenger terminal D
Airport Port Lotniczy Katowice PL 87.2 09/2027
Reconstruction of partially closed railway line no. 182 Tarnowskie Góry – Zawiercie
Airport PKP Polskie Linie Kolejowe
S.A. PL 131.0 09/2021
S1 express road section Pyrzowice-Podwarpie Airport Generalna Dyrekcja Dróg
Krajowych i Autostrad PL 41.3 03/2020
S1 express road section Podwarpie - Dąbrowa Górnicza Airport Generalna Dyrekcja Dróg
Krajowych i Autostrad PL 56.6 07/2021
Łódź Airport - Extension of parallel taxiway with RET Airport Port Lotniczy Łódź PL To be
defined n.a.
Łódź Airport - Implementation of Constant Noise Monitoring System
Airport Port Lotniczy Łódź PL 0.1 08/2017
Łódź Airport - Extension of radar - camera security system Airport Port Lotniczy Łódź PL 0.3 n.a.
Extention of Rokicinska Street in Lodz from Malownicza street to the city border
Airport Urząd Miasta Łodzi PL 9.7 12/2019
Szczecin Airport - Works on airport's infrastructure on airside / landside
Airport Port Lotniczy Szczecin -
Goleniów Sp. z o.o. PL 9.9 12/2020
Szczecin Airport - Replacement security control units at passenger security control zone
Airport Port Lotniczy Szczecin -
Goleniów Sp. z o.o. PL 0.9 12/2016
Szczecin Airport - Rebuild CCTV system at airport Airport Port Lotniczy Szczecin -
Goleniów Sp. z o.o. PL 0.5 12/2017
Szczecin Airport - Building a new entrance to airport airside Airport Port Lotniczy Szczecin - PL 1.2 12/2018
Project name Project
category Project promoter
Member States / Countries involved
Total costs Project end
date
zone Goleniów Sp. z o.o.
Szczecin Airport - Building a new airport lighting approach system cat.II
Airport Port Lotniczy Szczecin -
Goleniów Sp. z o.o. PL 7.3 12/2020
Poznań Airport - Modernization Road taxiing Airport Port Lotniczy Poznań-Ławica PL 1.0 12/2019
Poznań Airport - Terminal Modernization Airport Port Lotniczy Poznań-Ławica PL 1.7 12/2019
Poznań Airport - Security Airport Port Lotniczy Poznań-Ławica PL 2.1 12/2019
Poznań Airport - Construction of parking with the communication system
Airport Port Lotniczy Poznań-Ławica PL 0.7 12/2018
Poznań Airport - Modernization of aircraft parking aprons Airport Port Lotniczy Poznań-Ławica PL 0.2 12/2016
Poznań Airport - Modernization of Buildings and Structures Airport Port Lotniczy Poznań-Ławica PL 0.4 12/2019
Poznań Airport - Network elements Informatics Airport Port Lotniczy Poznań-Ławica PL 1.9 12/2019
Poznań Airport - Station pre-treatment with rainwater distribution system
Airport Port Lotniczy Poznań-Ławica PL 7.1 12/2019
Poznań Airport - Modernization and extension of Runway Airport Port Lotniczy Poznań-Ławica PL 21.9 12/2019
Poznań Airport - Technical Base Airport Port Lotniczy Poznań-Ławica PL 4.8 12/2019
Wrocław Airport - preparation of documentation and construction of the plane de-icing aircraft with a possible extension of an existing one
Airport Port Lotniczy Wrocław PL 18.1 12/2020
Wrocław Airport - Construction of the fuel storage Airport Port Lotniczy Wrocław PL 3.5 12/2018
Wrocław Airport - development of internal infrastructure Airport Port Lotniczy Wrocław PL 16.0 12/2020
Wrocław Airport - Extension of parking and kerb Airport Port Lotniczy Wrocław PL 1.0 12/2020
Wrocław Airport - Expressway Airport Port Lotniczy Wrocław PL 20.0 12/2020
Wrocław Airport - decarbonization Airport Port Lotniczy Wrocław PL 5.0 12/2020
Wrocław Airport - adapt to climate change Airport Port Lotniczy Wrocław PL 2.0 12/2020
Development of national infrastructure of air traffic management
Airport Polska Agencja Żeglugi
Powietrznej PL 34.6 01/2020
Modernisation of Marywilska, Czołowa, Polnych Kwiatów streets, section Trasa Toruńska - Mehoffera st, stage I
Multimodal Urząd m.st. Warszawy PL 30.5 12/2023
Link to the junction "Romanów" on the A1 motorway - 3rd Multimodal Urząd Miasta Łodzi PL 19.1 12/2020
Project name Project
category Project promoter
Member States / Countries involved
Total costs Project end
date
phase of the "Trasa Górna"
Expansion of Intermodal Terminal in Katy Wrocławskie Multimodal Schavemaker Invest Sp. z
o.o. PL 3.0 06/2020
Study optimizing the functioning and deployment of alternative fuel stations of the TENT-T core network
Innovation Przemyslowy Instytut
Motoryzacji PL 1.8 06/2018
Deployment of alternative fuels facility infrastructure - LNG bunkering and vessel's electric power supply
Innovation Zarząd Morskiego Portu
Gdynia PL 9.6 12/2027
Construction of vessel's stand for LNG export in External Port of Świnoujście
Innovation Zarząd Morskiego Portu
Szczecin i Świnoujście PL 16.3 02/2022
Development of LNG infrastructure in Poland - the pilot project
Innovation Gaspol Spolka Akcyjna PL 0.0 08/2016
Multimodal node by Łódź Fabryczna Station Other Urząd Miasta Łodzi PL 100.4 12/2017
Comprehensive integration program for the low-emission public transport system in Lodz Metropolitan Area
Other Urząd Miasta Łodzi PL 161.5 12/2021
Construction and reconstruction of tram lines in Łódź Other Urząd Miasta Łodzi PL 27.0 09/2020
Lodz metropolitan tram Other Urząd Miasta Łodzi PL 244.3 12/2020
Studies and activities regarding enhancement of Baltic-Adriatic Rail Freight Corridor 5 offer
Rail PKP Polskie Linie Kolejowe
Spoka Akcyjna PL, CZ, SK, AT, IT,
SI 2.9 12/2020
"Sweden-Poland Sustainable Sea-Hinterland Services" MoS Port of Trelleborg, Port of
Swinoujscie, Trelleborg Municipality
PL, SE 5.4 12/2019
Sweden-Poland Sustainable Sea-Hinterland Services III MoS Trelleborgs Hamn AB (SE) PL, SE 3.2 12/2020
The study corridor lines: the identification of measures to ensure the TEN-T standards and the elimination of bottlenecks in the corridor lines
Rail Ministry of infrastructure SI 1.1 12/2017
Rehabilitation of existing line Maribor-Šentilj-state border (new tunnel and viaduct)
Rail Ministry of infrastructure SI 247.0 12/2022
Construction of the 2nd track (new line) on the section Maribor-Šentilj-state border
Rail Ministry of infrastructure SI 170.0 12/2030
Railway station Pragersko - Upgrading of the railway hub to Rail Ministry of infrastructure SI 78.1 12/2020
Project name Project
category Project promoter
Member States / Countries involved
Total costs Project end
date
meet the required TEN-T standards regarding interoperability (first phase)
Upgrading of railway line on the section Poljčane - Slovenska Bistrica and railway stations Poljčane and Slovenska Bistrica
Rail Ministry of infrastructure SI 58.7 12/2019
Assuring D4 down the whole section Zidani Most - Celje Rail Ministry of infrastructure SI 239.7 12/2020
Upgrading and reconstruction of the section Ljubljana - Zidani Most
Rail Ministry of infrastructure SI To be
defined 12/2030
Introduction of traffic remote control on a section of railway line Zidani Most-Ljubljana
Rail Ministry of infrastructure SI 73.5 08/2023
Creation of siding, pax tracks, extra tracks - Tivoli Arch in Ljubljana
Rail Ministry of infrastructure SI 0.5 03/2018
New section assuring direct connection and increase abilities of train station in Ljubljana (project called Tivoli Arch)
Rail Ministry of infrastructure SI 80.0 12/2022
Upgrading of station Ljubljana and ensure intermodal hub with regional lines and new stops
Rail Ministry of infrastructure SI 180.0 12/2030
Verification of reconstruction or upgrading of the track Ljubljana - Divača
Rail Ministry of infrastructure SI To be
defined 12/2023
Upgrading the railway line between Ljubljana and Divača Rail Ministry of infrastructure SI 72.8 12/2023
Identification of additional measures for upgrading (increase abilities) of the existing line Divača-Koper
Rail Ministry of infrastructure SI 0.1 03/2017
Construction of the 2nd track Divača-Koper Rail Ministry of infrastructure SI 960.0 10/2025
Elimination of bottleneck Bivje on the railway section Divača-Koper
Rail Ministry of infrastructure SI 21.4 12/2020
Upgrading of the section Trieste-Divača (Divača-state border)
Rail Ministry of infrastructure SI 61.9 12/2030
Signalling enhancement (ERTMS/ETCS…) and implementation of the ETCS level 1 - Pragersko-Šentilj-state border
Rail ERTMS Ministry of infrastructure SI 7.5 04/2022
Project name Project
category Project promoter
Member States / Countries involved
Total costs Project end
date
Implementation of the ITS system on Motorway and Highway - Maribor - Celje
Road DARS SI 6.5 10/2019
Connection Brezovica/Dragomer Road DARS SI 33.3 12/2018
Expansion of Ljubljana Motorway ring with connecting legs Road DARS SI 3.3 12/2020
Extension of the motorway section Koseze - Kozarje to 6-lanes
Road DARS SI 34.1 12/2020
Implementation of the ITS system on Motorway and Highway - Ljubljana ring
Road DARS SI 12.0 10/2020
Implementation of the ITS system on Motorway and Highway - Koper
Road DARS SI 1.8 10/2017
Traffic Management Integration in the National Traffic Management Centre 2
Road Ministry of infrastructure SI 5.6 01/2020
Traffic management integration in the National Traffic Management Centre
Road Ministry of Infrastructure SI 4.9 11/2019
Implementation of the C-ITS system on Motorway and Highway - pilot project Koper - Ljubljana
Road DARS SI 2.0 12/2020
C-Roads Slovenia Road Ministry of Infrastructure SI 2.3 12/2020
C-Roads Slovenia 2 Road
Republika Slovenija, Ministrstvo za infrastrukturo
(Republic of Slovenia, Ministry of Infrastructure)
SI 3.1 12/2020
Implementation of the ITS system on Motorway and Highway - resting place
Road DARS SI 6.0 10/2020
Safety Management on HW and MW Road DARS SI 6.0 12/2020
Examination of the number of required parking spaces Road DARS SI 0.5 12/2018
Arrangements for MW and HW in the context of land on the former MMP
Road DARS SI 16.1 12/2030
Noise barrier Road DARS SI 50.0 12/2022
Port of Koper - Extension of Pier I Southern side and capacity upgrading in order to support the growing
Maritime Luka Koper d.d. SI 80.0 12/2020
Project name Project
category Project promoter
Member States / Countries involved
Total costs Project end
date
volumes of container business
Port of Koper - New berthing facilities in Basin I, II and III Maritime Luka Koper d.d. SI 40.0 12/2020
Port of Koper - New port entry and supporting road infrastructure
Maritime Luka Koper d.d. SI 20.0 12/2020
Port of Koper -Construction of additional rail connecting infrastructure network within the port
Maritime Luka Koper d.d. SI 20.0 12/2018
Port of Koper - Passenger terminal infrastructure Maritime Luka Koper d.d. SI 3.0 12/2018
Port of Koper - Deepening of the navigational channel in basin II (outside the concession area)
Maritime Ministry of Infrastructure SI 15.0 12/2020
Port of Koper - Arrangement of ports back areas Maritime Luka Koper d.d. SI 12.0 12/2020
Port of Koper - Dredging works in port’s basins according needs (within the concession area of the port)
Maritime Luka Koper d.d. SI 10.0 12/2020
Port of Koper -Extension of Pier I -Northern side Maritime Luka Koper d.d. SI 60.0 12/2025
Port of Koper - New berthing facilities in Basin I, II and III Maritime Luka Koper d.d. SI 20.0 12/2030
Port of Koper - New port entry and supporting road infrastructure
Maritime Luka Koper d.d. SI 10.0 12/2030
Port of Koper -Construction of additional rail connecting infrastructure network within the port
Maritime Luka Koper d.d. SI 20.0 12/2030
Port of Koper - Arrangement of ports back areas Maritime Luka Koper d.d. SI 10.0 12/2030
Port of Koper - Dredging works in port’s basins according needs (within the concession area of the port)
Maritime Luka Koper d.d. SI 10.0 12/2030
Port of Koper - Extension of Pier II Maritime Luka Koper d.d. SI 100.0 12/2030
Port of Koper - Construction of Pier III Maritime Luka Koper d.d. SI 50.0 12/2030
Connection of Port of Koper to motorway Maritime DARS SI 23.1 12/2023
Airport Ljubljana - Development of airport infrastructure (In the context of the National Spatial Plan will set area for the location of the airport and other infrastructure)
Airport Ministry of Infrastructure SI 1.4 12/2021
Reallocation of the main road Airport Slovenian infrastructure agency (DRSI), Aerodrom
SI 5.3 12/2017
Project name Project
category Project promoter
Member States / Countries involved
Total costs Project end
date
Ljubljana, Občina Cerklje na Gorenjskem
Renovation and modernization of air navigation services at the airport - "New pens"
Airport Air Traffic Control, Ministry
of Infrastructure SI 0.1 12/2020
Renovation and modernization of the infrastructure of air navigation services
Airport Air Traffic Control SI 1.1 12/2018
Logistic centre (optimization of logistic processes) Airport Infrastructure manager,
Aerodrom Ljubljana, d.o.o. SI 9.2 12/2022
FAB CE - Free Route Airspace from the Black Forest to the Black Sea (Partnership Project)
Airport Air Traffic Control SI 0.3 04/2017
Air Traffic Management, Partnership Project Airport Air Traffic Control SI 1.7 12/2017
FAB CE - DAM and STAM (Partnership Project) Airport Air Traffic Control SI 0.4 12/2018
Gate One - Free Route Airspace project (Partnership Project)
Airport Air Traffic Control SI 1.7 11/2019
Renovation and modernization of airport infrastructure Airport Aerodrom Ljubljana SI 41.8 12/2025
Initial airport operation plan Airport Aerodrom Ljubljana, d.o.o. SI 0.9 05/2017
Upgrading and modernization of Ljubljana container terminal infrastructure for improvement of intermodal transport services and logistics centre
Multimodal Slovenian railways SI 150.0 12/2030
Strategy for deployment of alternative fuels infrastructure in Slovenia (in accordance with the Directive 2014/94)
Innovation Ministry of
Infrastructure SI 0.0 08/2017
Intermodal passenger hub (increasing mobility) Other Ministry of Infrastructure SI 0.5 12/2018
Modernisation of railway corridor State border CZ/SK – Čadca – Krásno nad Kysucou, section Čadca - Krásno nad Kysucou (outside)
Rail ŽSR SK 220.0 12/2023
Modernisation of railway node Žilina (documentation + construction)
Rail ŽSR SK 390.0 12/2022
Construction of maintenance centre for passenger railway vehicles in Zilina
Rail ZSSK SK 56.8 12/2020
Zlatovce – Trenčianska Teplá: railway modernisation Rail ŽSR SK 245.0 12/2017
Project name Project
category Project promoter
Member States / Countries involved
Total costs Project end
date
Považská Teplá – Žilina: railway modernisation to 160 km/h Rail ŽSR SK 131.0 11/2017
Púchov - Považská Teplá: railway modernisation to 160 km/h
Rail ŽSR SK 374.0 01/2020
Devínska Nová Ves - state border SK/AT: railway electrification
Rail ŽSR SK 4.8 12/2020
Rail Node Bratislava - Feasibility Study Rail Slovak railways (ZSR) SK 1.3 02/2018
Rail Node Bratislava - Project Documentation Rail Slovak railways (ZSR) SK 25.0 12/2019
Rail Node Bratislava - Works Rail Slovak railways (ZSR) SK 900.0 12/2030
Construction of terminals integrated passenger transport in Bratislava - Devínska Nová Ves, implementation
Rail ŽSR SK 20.6 01/2021
Construction of terminals integrated passenger transport in Bratislava - Lamačská brána, implementation
Rail ŽSR SK 16.5 05/2021
Construction of terminals integrated passenger transport in Bratislava - Patrónka, implementation
Rail ŽSR SK 10.3 03/2021
Construction of terminals integrated passenger transport in Bratislava - Mladá garda, implementation
Rail ŽSR SK 3.0 n.a.
Construction of terminals integrated passenger transport in Bratislava - Trnávka, implementation
Rail ŽSR SK 8.6 05/2021
Construction of terminals integrated passenger transport in Bratislava - Ružinov, implementation
Rail ŽSR SK 4.5 12/2020
Construction of terminals integrated passenger transport in Bratislava - Vrakuňa, implementation
Rail ŽSR SK 3.0 03/2020
Construction of maintenance centre for passenger railway vehicles in Bratislava
Rail ŽSR SK 170.6 12/2023
Terminals integrated passenger transport in Bratislava - project documentation
Rail ŽSR SK 1.0 02/2020
The information system of the integrated transport system of Bratislava region
Rail ŽSR SK 4.7 12/2020
Implementation of the technical interoperability for TAF TSI sub system
Rail Zeleznicna spolocnost Cargo
Slowakia, a.s. SK 3.1 12/2019
Project name Project
category Project promoter
Member States / Countries involved
Total costs Project end
date
Implementation of the technical interoperability for TAP TSI sub system
Rail Zeleznica spolocnost Cargo
Slovensko, a.s. SK 8.7 12/2019
Delivery and installation of ETCS into 361 series locomotives for ZSSK
Rail ERTMS Zeleznicna spolocnost
Slovensko, a.s. SK 2.3 12/2020
Motorway D3 Cadca, Bukov - Svrcinovec Road NDS a.s. SK 229.1 12/2020
Oščadnica – Čadca: motorway D3 construction Road NDS a.s. SK 102.2 11/2023
Kysucké Nové Mesto – Oščadnica: motorway D3 construction
Road NDS a.s. SK 303.6 01/2024
Žilina Brodno - Kysucké Nové Mesto: motorway D3 construction
Road NDS a.s. SK 411.0 01/2024
Žilina Strážov - Žilina Brodno: motorway D3 construction Road NDS a.s. SK 254.9 11/2017
Triblavina junction construction Road NDS a.s. SK 30.2 12/2018
Bratislava – Senec: motorway D1 widening to 8 lanes (Bratislava - Triblavina)
Road NDS a.s. SK 79.7 09/2020
Bratislava – Senec: motorway D1 widening to 8 lanes (Triblavina - Senec)
Road NDS a.s. SK 214.4 05/2023
Blatné junction construction Road NDS a.s. SK 29.5 12/2017
Blatné – Trnava: motorway D1 widening to 6 lanes Road NDS a.s. SK 478.8 02/2027
Construction of Motorway D4 section Rača Junction – Záhorská Bystrica
Road MDV (MoT) SK 740.8 12/2023
Construction of Motorway D4 section Bratislava Jarovce – Ivanka pri Dunaji sever - Rača
Road MDV (MoT) SK 860.0 10/2020
Study on Motorway D4 Bratislava Ring Road MDV (MoT) SK 22.5 12/2020
Motorway ITS Bratislava Node Road NDS a.s. SK 24.5 12/2017
fuelCNG Road Slovensky plynarensky
priemysel, a.s. SK 18.5 12/2020
NCE - AdvancedEvNet Road GreenWay Infrastructure
s.r.o. SK 7.3 12/2020
LNG: Fuelling Renewable Transport in the Visegrad Road ST Logistic s.r.o SK 32.4 12/2020
Project name Project
category Project promoter
Member States / Countries involved
Total costs Project end
date
countries
Feasibility study for the Modernization of public port of Bratislava
IWW Verejné prístavy, a.s. (Public
ports, jsc) SK 2.5 12/2020
Modernization of infrastructure in cargo port BA and completion of bollards in cargo port
IWW Verejné prístavy, a.s. (Public
ports, jsc) SK 63.2 12/2024
Modernization and completion of the port quays and hard standings
IWW Verejné prístavy, a.s. (Public
ports, jsc) SK 40.4 12/2024
Passenger port - waterfront Eurovea in Port of Bratislava IWW Verejné prístavy, a.s. (Public
ports, jsc) SK 7.0 12/2023
Port Safety Protection IWW Verejné prístavy, a.s. (Public
ports, jsc) SK 22.6 12/2021
Waterway public transport - feasibility study IWW Verejné prístavy, a.s. (Public
ports, jsc) SK 1.0 12/2019
Waterway public transport - works IWW Verejné prístavy, a.s. (Public
ports, jsc) SK 30.0 06/2020
ZSR Intermodal Terminal Bratislava - 1st construction phase
Multimodal Slovak railways (ZSR) SK 50.0 02/2020
Construction of the LNG Terminal in public port of Bratislava
Innovation Verejné prístavy, a.s. (Public
ports, jsc) SK 12.0 12/2023
NCE - FastEvNet Innovation GreenWay Infrastructure,
s.r.o. SK, PL 4.8 03/2019