Ballast Water Management Convention
Status, installations and experiences
© Det Norske Veritas AS. All rights reserved.
Ballast Water Management Convention
2011-10-04
Agenda
Status
• Ratification
• Entry into force
Standards
• Performance
• Safety
Experiences
• New Buildings & retrofits
• New Buidlings projects, comments and failures
• Retrofits projects, comments and failures
2
© Det Norske Veritas AS. All rights reserved.
Ballast Water Management Convention
2011-10-04
Agenda
Status
• Ratification
• Entry into force
Standards
• Performance
• Safety
Experiences
• New Buildings & retrofits
• New Buidlings projects, comments and failures
• Retrofits projects, comments and failures
3
© Det Norske Veritas AS. All rights reserved.
Ballast Water Management Convention
2011-10-04
Denmark 29th country? Panama 30th?
4
Status: 28 of 30 parties & 25.43% of 35% tonnage required for entry into force
Party Local requirements Party & local requirements
October 4, 2011 5
2011 2012 2013 2014 2016 2018
Ratification Entry into force
Intermediate or Renewal survey
Anniversary date in 2016
12 months
Exchange or Treatment
Treatment
© Det Norske Veritas AS. All rights reserved.
Ballast Water Management Convention
2011-10-04
Agenda
Status
• Ratification
• Entry into force
Standards
• Performance
• Safety
Experiences
• New Buildings & retrofits
• New Buidlings projects, comments and failures
• Retrofits projects, comments and failures
6
© Det Norske Veritas AS. All rights reserved.
Ballast Water Management Convention
2011-10-04
777
• Capacity
• Bypass
• Other operations
• Auxiliary systems
• Chemical storage
• Corrosion
• Water remains
Installation requirements - Performance
© Det Norske Veritas AS. All rights reserved.
Ballast Water Management Convention
2011-10-04
8
Arrangement of compartments
- Complete treatment system in a
separate compartment
- Single componets can be stored
- Zone 1 with low flash point
- Ventilation of hazardous spaces
rules to be followed when low flash
point
8
Treatment system in engine
room
- Chemicals/gases far below
established standards
- Escape always possible
- Masks/suits available in cases of
emergency
Steel deck Ventilation:
- Separate
- Exhaust
- 30 air changes/hr
- Single failure proof
Thin ventilation
ducts not allowed
Gas tight
- Self closing
- Opens outward
300mm sill
height
Installation requirements - Safety
© Det Norske Veritas AS. All rights reserved.
Ballast Water Management Convention
2011-10-04
9
Liquid chemicals storage
tanks stowed in the engine
room• Flash point not exceeding 60°C not
accepted
• Well ventilated space
• Easy inspection and filling access
• Approved construction with
suitable material
• Air pipes to open deck
• High level alarm (can be combined
with level gauging system)
• Drip trays
• Signs on tanks
• Manual for filling, emergency etc.
• Protective clothing (2 sets)
9
Installation requirements - Safety
© Det Norske Veritas AS. All rights reserved.
Ballast Water Management Convention
2011-10-04
Agenda
Status
• Ratification
• Entry into force
Standards
• Performance
• Safety
Experiences
• New Buildings & retrofits
• New Buidlings projects, comments and failures
• Retrofits projects, comments and failures
10
© Det Norske Veritas AS. All rights reserved.
Ballast Water Management Convention
2011-10-04
New Buildings & retrofits - Scope
� Statutory
- Certificate of Compliance
- Statement of Compliance
� After ratification
- International Ballast Water Management
Certificate
� Full compliance with DNV Rules Pt.6
Ch.18 Sec.4
� Flag acceptance of type approval
certificate � manufacturer
� Class
- BWM-T notation
- Equivalent to Statement/Certificate
- DNV Rules Pt.6 Ch.18
� If no notation or Statement/Certificate
are requested
- Minimum safety standard in DNV Rules
Pt.6 Ch.18 Sec.4 must be followed
- Thorough review for the first installation to
establish safe standard
11
© Det Norske Veritas AS. All rights reserved.
Ballast Water Management Convention
2011-10-04
New Buildings & retrofits – Approval & Surveys
Approval
(DNV Rules Pt.6 Ch.18)
Exchange•BWM Plan
•Sequential
•Flow through
•Dilution
•Sediment management
•Sampling
Treatment•Control & Instrumentation
•Piping systems
•Bypasses
•Capacity
•Foundation (if necessary)
Surveys
(Reg. E-1)
Exchange•Documentation
•Sampling
•Openings for flow through
Treatment• Installation
•Commissioning
•Documentation
• No sampling for organisms required by Regulation E-1
12
© Det Norske Veritas AS. All rights reserved.
Ballast Water Management Convention
2011-10-04
Retrofits - Scope
Piping systems
•P&ID of ballast system
•Any related arrangements like ventilation, drainage etc.
Electrical systems
•Drawings of the MSB modification
•Updated electric load balance
•Updated electrical power single line diagram
•Selectivity evaluation of the largest new breakers introduced into the main switchboard vs. the generator breakers.
• It should be evaluated whether new short circuit calculations are found necessary
Control systems
•System block diagram
•Power supply arrangement
•List of controlled and monitored points
•Description of interface towards the ship’s existing systems
Structure and stability
•Depending on the ratio of the added weight to the ship’s light weight, new stability calculations may be required.
•Any reinforcements needed due to the added elements may be required to be approved.
13
© Det Norske Veritas AS. All rights reserved.
Ballast Water Management Convention
2011-10-04
Experiences – New Buildings
� Projects – ship types
- Drilling rigs: 2
- Tankers: 3
- Ore Carriers: 1
- Supply ships: 14
- Container Carriers: 1
- Car Carriers: 4
- Bulk Carriers: 3
- Heavy lift: 4
- Naval: 1
- General cargo: 1
- Gas carriers: 1
� Projects – manufacturers:
- Alfa Laval: 13
- Optimarin: 5
- Oceansaver: 2
- Unitor: 3
- NK-O3: 1
- Panasia: 3
- Techcross: 1
- Hydemarine: 3
- NEI: 1
- Oceanguard: 2
- Greenship: 1
14
© Det Norske Veritas AS. All rights reserved.
Ballast Water Management Convention
2011-10-04
New Buildings – Typical comments
• Ballast water must be treated before mixed with ejector
• Usually a challenge as ejector will loose effectStripping system
• Capacity must always exceed that of the ballast pump; or
• Flow control requiredCapacity
• Stripping system ok
• How much water upstream?Water remains
• Gravity discharge only ok when system treats one wayBypasses
• Separate treatment room
• Ventilation outletsSafety
15
© Det Norske Veritas AS. All rights reserved.
Ballast Water Management Convention
2011-10-04
New Buildings – Typical failures
• Clogging, frequent back flushing
• Bigger discharge line
• Larger back-flush pump
• Lower BW capacity
Filters
• Control systemsOperation
• Not possible to empty tankWater remains
• Difficult operation to avoid contaminationSea trials
16
© Det Norske Veritas AS. All rights reserved.
Ballast Water Management Convention
2011-10-04
Experiences – Retrofits
� Projects – ship types
- Passenger/Cruise: 3
- Chemical tankers: 1
- Oil tankers: 1
- Asphalt tankers: 1
- Supply ships: 1
- Container Carriers: 1
- Car Carriers: 3
- Bulk Carriers: 1
- General cargo: 1
� Projects – manufacturers:
- Fresh water/no ballast: 3
- Optimarin: 1
- Oceansaver: 2
- Unitor: 2
- NEI: 1
- JFE: 2
- Severn Trent De Nora: 1
- Place only: 1
17
Possible during dry dock period/renewal period?
© Det Norske Veritas AS. All rights reserved.
Ballast Water Management Convention
2011-10-04
Retrofits – Typical comments
• Ballast water must be treated before mixed with ejector
• Usually a challenge as ejector will loose effectStripping system
• Accepted equivalent to one pump; or
• Flow controlCapacity
• Stripping system ok
• How much water upstream?Water remains
• Gravity discharge only ok when system treats one way
• Blank flanges on all bypass lines or non-return valvesBypasses
• Separate treatment room always a problem
• Ventilation outletsSafety
18
© Det Norske Veritas AS. All rights reserved.
Ballast Water Management Convention
2011-10-04
Retrofits – Typical failures
• Clogging, frequent back flushing
• Bigger discharge line
• Larger back-flush pump
• Lower BW capacity
Filters
• Missing scope, planning, many revisions
• Misjudge place needed for valves, bends etc.Fittings, missing
drawings
• Connection to switchboard - blackouts
• Load balance – must take out some other equipment
Electricalsystems
• Not so good experience
• Some agents claim to have good experienceRiding crew
19
© Det Norske Veritas AS. All rights reserved.
Ballast Water Management Convention
2011-10-04
20
Safeguarding life, property