    Bakun Dam

  • 7/27/2019 Bakun Dam Ppt

    2/19

    Bakun Dam is located on the Batang Balui, atributary of the Sg. Rajang, 37 km upstream ofBelaga

    Batang Balui has a length of 341 km and 15 354 m2catchment area with the highest peak originating

    from Mount Makati at 1360 m. Bakun Dam was constructed on the sole purpose for

    hydroelectric energy to meet the high demand fromthe industries instead of domestic.

    The dam will have an ultimate installed capacity of2400 MW comprising 4 x 300 MW turbines in the firstphase and 4 x 300 MW turbines in the secondphase.

  • 7/27/2019 Bakun Dam Ppt

    3/19

    Location of Bakun

  • 7/27/2019 Bakun Dam Ppt

    4/19

    Built as a Concrete Faced Rock Fill Dam (CFRD), The height of the dam is 207 m with an approximate

    crest length of 748 m and a fill volume of 117M m3.

    The flood area of the dam is 69 640 hectares and

    has a catchment area over 1.5M hectares. The dam is complete with 8 power tunnels,

    powerhouse and spillway

    Township is also built within the area of the dam for

    employees and owners of Bakun Dam. The

    accommodations inclusive of houses, barracks,

    guest chalets and club house.

  • 7/27/2019 Bakun Dam Ppt

    5/19

    Bakun project area

  • 7/27/2019 Bakun Dam Ppt

    6/19

    Township

  • 7/27/2019 Bakun Dam Ppt

    7/19

    Issues on Bakun

    Resettlement Safety

    Hydropower

  • 7/27/2019 Bakun Dam Ppt

    8/19

    Issues on Bakun - resettlement

    Resettlement had involved the relocation of thepopulation of the upper Balui in the Belaga river

    system.

    The state of Sarawak through the State Planning

    Unit had created a new section known as SpecialTask Section for Resettlement had been in charge

    on the relocation of the indigenous people

    More than 10 000 people from 15 different

    communities have been forced to move to KampungSungau Asap and Kampung Sungai Koyan through a

    codename of Operation Exodus.

  • 7/27/2019 Bakun Dam Ppt

    9/19

    At the resettlement area, people are suffering frompoverty, malnutrition, unemployment and adverse socio-economic conditions.

    There are claims that the house units at the AsapResettlement Scheme were not in accordance with thatpromised in the relocation plan (Swain & Ang, 2004).

    There were further claims that, the compensation havenot been fully fulfilled until present time. They werepromised 15 hectares per family before relocation insteadthe actual acreage allocated for them finally was only 3acres.

    Due to deteriorating conditions of the resettlement area,some communities have moved back to their originalhomes in the inundation zone by building jelatong andstaying in the vicinity of the dam. They have establishednew villages near the dam fish, hunt and farm the land

    nearby the dam.

  • 7/27/2019 Bakun Dam Ppt

    10/19

    Issues on Bakun - Safety

    A group of citizen who residing downstream ofBakun Dam claimed that they have been kept in the

    dark over the content of the Emergency Rescue Plan

    (EPR).

    The Sarawak Conservation Alliance for NaturalEnvironment (Scane) has called upon the

    government to make public its Emergency Rescue

    Plan (ERP) prior to the impoundment of the dam.

  • 7/27/2019 Bakun Dam Ppt

    11/19

    The Sarawak Hidro managing director and chiefexecutive officer Zulkifle Osman claimed that the

    dam will not break due to its solid foundation and

    has been in perfect condition since the impoundment

    in October 2011 Upon completion, the dam will be scrutinised and

    check by an international independent panel of

    experts once in every 10 years.

    He further assured that the dam is monitored ondaily basis and reading will be sent to the state

    governments security committee once every three to

    four months for review.

  • 7/27/2019 Bakun Dam Ppt

    12/19

    Issues on Bakun-Hydropower

    Bakun Dam coincides the core of Sarawak Corridorof Renewable Energy (SCORE) in energy resources,

    particularly in hydropower, coal and natural gas.

    The estimated investment on the projects is RM94

    bil and in 2030 an investment of RM300 willtransform Sarawak into an industrialized state and

    energy hub of Borneo.

    Therefore, the state needs to guarantee a

    sustainable energy supply at a competitive rate inorder to encourage continuous inflows of

    investments and organic growth

  • 7/27/2019 Bakun Dam Ppt

    13/19

    Adding up all the dams total combined capacity is4500 MW.

    With the excessive power available there is an issue

    where the power should go and how they can be

    fully utilized for people. Suggestions are bound to leave the dams idle such

    as Bakun Dam

  • 7/27/2019 Bakun Dam Ppt

    14/19

    Mitigation efforts - resettlement

    The solution to social problems created must besolved through policy formulation and legal

    frameworks

    That must be complimented with the followings:

    A population and baseline income survey as part offeasibility study

    A detailed resettlement plan for peoples socio-economic

    re-establishment

    A relocation timetable correlated with advances in civilworks

    A distinct budget for resettlement

    Still not available in developing country

  • 7/27/2019 Bakun Dam Ppt

    15/19

  • 7/27/2019 Bakun Dam Ppt

    16/19

    Mitigation efforts safety: Emergency Action

    Plan (PNSB)

    Level Alert Triggering event Action1 Low Spill expected Release reservoir water from the lower level of the draw-off

    tower2 Medium High rainfall and spill

    continues. Reservoir level

    above maximum.Rapid increase in seepage

    quantity and seepage water

    is murky

    Set up Emergency Task Team. Check with Jabatan Kajicuaca

    on the forward weather forecasting.Consult SMHB for advice on rapid drawdown of reservoir.

    Inform District Office of possible flooding close to the dam

    and need for evacuation. Contact Civil Defense Dept. To

    standby.

    3 High High rainfall and spillcontinues. Reservoir level

    above maximumDam failure considered

    possible.

    Contact emergency services and place them on full alert.Inform them of the need to establish emergency control

    centre and evacuation of affected area as per inundation

    maps.

    4 Critical Dam failure likely Contact emergencies control centre to start full evacuation

  • 7/27/2019 Bakun Dam Ppt

    17/19

    For alert level 3 and 4, JKAS will contact the followingsorganization: State administration to inform the potential disaster and

    mobilize disaster relief machineries

    Army to set up control centre, start evacuation procedure andmaintain civil order,

    Police to start evacuation procedures and maintain civil order

    District Offices and Civil Defense Department to aid theevacuation procedures.

    Medical services to be alert on receiving casualties

    Fire and rescue services to be alert for disaster relief andrescue

    Local radio and TV stations to coordinate information servicesand warnings to the public

    Air force for possible air transport

  • 7/27/2019 Bakun Dam Ppt

    18/19

    Mitigation efforts excessive energy

    The National Energy Policy 1979 was aimed toensure the provision of sufficient, secure and cost-

    effective energy supplies by developing both

    renewable and non renewable energy using least

    cost options and diversification of supply sources

    both within and outside Malaysia.

    Therefore, excessive power of Bakun Dam should

    be utilized accordingly to the energy needs inventory

    of the policy, not only for industrial but also domestic.

  • 7/27/2019 Bakun Dam Ppt

    19/19

    Conclusion