Flow Control Baker Plugs
Standard and Surset
Europe Learning CentreWCP TrainingSchlumberger
-
8/10/2019 Baker Flow Control Devices
2/32
N N E
Presentation Objectives
Familiarization with Baker flow control equipment
Standard and Surset Landing Nipple and lock specifications
Baker Probes, shanks and prongs
Equalization devices and their associated running/pulling tools
Running procedures
Pulling procedures
Baker Nomenclature
-
8/10/2019 Baker Flow Control Devices
3/32
N N E
a er an ng n pp es
Two Baker systems Standard and Surset
First we will concentrate on Baker standard equipment
There are two standard landing nipples
Both are nogo landing nipples
Both have a profile, seal bore and nogo
Even though they have nogo shoulders Baker have a selectivesystem due to the lock type
-
8/10/2019 Baker Flow Control Devices
4/32
N N E
a er an ng n pp es
Top nogo landing nipple the nogo is above the
seal bore
ID of the nipple is the seal bore dimension
Will accept the following locks
M,G,F and W
S selective due to lock
All L Sliding side doors have an F nipple profile
-
8/10/2019 Baker Flow Control Devices
5/32
N N E
a er an ng n pp es
Bottom nogo landing nipple the nogo is below
the seal bore
ID of the nipple is the dimension of the nogoshoulder, smaller than seal bore
Will accept the following locks
Z,R,E and K
Always installed below an F nipple of the samenominal size
-
8/10/2019 Baker Flow Control Devices
6/32
N N E
ow ng an non ow ng app cat ons
Equalizing assemblies can be added to all the
standard locks to form plugs
Gauge carries (bomb hangers) can be addedto two locks to be used in flowing applications
W lock in the top nogo F nipple
Z lock in the bottom nogo R nipple
V packing are attached to Equalizing devices
-
8/10/2019 Baker Flow Control Devices
7/32N
N E
tan ar a er omenc ature
Above is shown the title given to a standard Baker plug
From the title the correct nipple, lock and equalizingassembly/flow control device can be selected
-
8/10/2019 Baker Flow Control Devices
8/32N
N E
qua z ng ev ces
Three types used in standard Baker plugs
H Prong type, prong run and set after plug body is set.2 runs to set and 2 runs to pull
G Prong type, prong run with plug body. 1 run to setand 2 runs to pull
R Melon type, 1 run to set and 1 run to pull
-
8/10/2019 Baker Flow Control Devices
9/32N N E
qua z ng ev ces
-
8/10/2019 Baker Flow Control Devices
10/32
-
8/10/2019 Baker Flow Control Devices
11/32N N E
ro es, an s an rongs
Similar probes can havemodifications, e.g.
A & AC probes cannot be
used for the same operation,an AC probe has no internalthread to accept a prong
An M1 Probe has a telltaleshear pin where an M probehas not.
-
8/10/2019 Baker Flow Control Devices
12/32N N E
unn ng oo s
C1 used to run W, Z, G,R and Slocks, can be used to run FB & RBstanding valves
E Selective used to run S selectivelocks with all the dogs retracted
G Selective used to run S selectivelocks with up facing dogs trailing
C1 can be used to run the Sselective lock with the up facing dogstrailing
-
8/10/2019 Baker Flow Control Devices
13/32N N E
unn ng oo s
Baker M pulling tool used to run and pull
several locks E, M (locks) and B (safety valve) locks canbe run using the M pulling tool
With this tool the probe is also used to setthe device
E.g. when an M1 probe is used to set
devices, the probe has a shear pin toindicate correct setting
-
8/10/2019 Baker Flow Control Devices
14/32
-
8/10/2019 Baker Flow Control Devices
15/32N N E
a er
W lock and G equalizing device
Plug hold pressure from above and below
Prong run with plug body 1 run to set
Collet and collet bowl prevent prong moving down
Shear pin (brass) prevents the prong moving up
Run on C1 1 x Aluminum (prong) 2 x Brass (body)
Brass pins through body have 2 options
-
8/10/2019 Baker Flow Control Devices
16/32N
N E
a er sett ng pu ng
Depends on C1 pinning, best to pin allowing for
over-pull, pins below fishing neck RIH set down in nipple, jar down to land on nogo,dogs lock into profile, over pull to confirm
J ar up to shear Brass pins below FN on body, C1moves up pulling prong to sealing position, thenaluminum pin through prong shears
Prong lock in sealing position by collet and colletbowl
-
8/10/2019 Baker Flow Control Devices
17/32N
N E
a er sett ng pu ng
To pull device, pull prong using SB/J DC to equalize,
B probe must be attached to SB/J DC to pull plugbody, B probe collapses the dogs when engaging FN
W2 lock has different dogs, different pivot position
Smaller sized G equalizing assemblies have twopins through the collet bowl sleeve
SB or J DC must be used to pull device as skirt maycontact body preventing shearing off
-
8/10/2019 Baker Flow Control Devices
18/32N
N E
a er
Bottom nogo option for R nipples
Same function as FWG
Same running/pulling procedures as FWG
Because of FN angle and pulling tool OD differenceOtis pulling tool should be used
Ensure equalization before latching lock
-
8/10/2019 Baker Flow Control Devices
19/32N
N E
a er
Plug does not have a nogo shoulder
Can be run using either a C1, G selective or Eselective running tools
Shank holds dogs in running position, prong holdsmelon in equalizing position
When pulling device, Kobe plug on equalizing bodyis broken to allow pressure equalization
tt
-
8/10/2019 Baker Flow Control Devices
20/32N
N E
a er sett ng pu ng
Run using an A shank and pulled using an AC probe
with an equalizing prong attached C1 with a locator ring to find the F nipple nogoshoulder
G selective tool holds the down facing dogsretracted
Upon location of nipple pick up, up facing dogslocate the profile, half jar up shears C1 pins andreleases down facing dogs locking device in nipple
tt
-
8/10/2019 Baker Flow Control Devices
21/32
N N E
a er sett ng pu ng
To pull the device, an A or AC probe must be used
attached to the pulling tool The probe releases the up facing dogs
After equalization, jar up or over pull to release thedevice
E selective tool holds all dogs retracted, allows forpassing of same sized F nipples, pins on running toolshear to release the upper dogs and setting is as peron previous tools
t
-
8/10/2019 Baker Flow Control Devices
22/32
N N E
oc c art
t
-
8/10/2019 Baker Flow Control Devices
23/32
N N E
tan ar a er summary
Two nipples used, F top nogo, R bottom nogo Top nogo locks M,G,F,S and W Bottom nogo locks Z,R, E and K Three equalizing devices H and G (prong) R (melon) C1, G and E selective running tools used on S locks C1 running tool on W and Z locks M pulling tool used to run and pull E and M locks Probes, Shanks and Prongs W and Z locks used on gauge hanger operations Soft set tool used to set gauges in F and R nipples Gauge hanger adapter known as B attachment
er rset eq pment
-
8/10/2019 Baker Flow Control Devices
24/32
N N E
a er urset equ pment
Standard equipment did not meet pressure rating needs of
the industry New system needed hence Surset was developed
New nipples developed that included pressure ratings
Retain F and R nogo positioning
A 15K
New nipples became AF, HF, VF, AR, HR and VR
a er urset equ pment
-
8/10/2019 Baker Flow Control Devices
25/32
N N E
a er urset equ pment
Locks made to match nipples hence AF went into an
AF nipple, of VR lock matched a VR nipple
Only two equalizing devices use H prong and M melon (sometimes known as R)
One running tool (model A) to run all locks
Can be pulled with Baker M (Otis GS)
a er urset n pp es an oc s
-
8/10/2019 Baker Flow Control Devices
26/32
N N E
a er urset n pp es an oc s
Top nogo nipples AF, HF and VF
Top nogo locks AF, HF and VF
Bottom nogo nipples AR, HR and VR
Bottom nogo locks AR, HR and VR
Baker Surset AFH HFH VFH (ARH HRH VRH)
-
8/10/2019 Baker Flow Control Devices
27/32
N N E
Baker Surset AFH, HFH, VFH (ARH,HRH, VRH)
AF lock with H (prong) equalizing device
Two runs to set, two runs to pull
Prong sized to prevent debris enteringplug (extended FN should be used)
Model A R/T with D probe used to runplug
Baker Surset AFM HFM VFM (ARM HRM VRM)
-
8/10/2019 Baker Flow Control Devices
28/32
N N E
Baker Surset AFM, HFM, VFM (ARM, HRM,VRM)
One run to set and one run to pull
Must be used in clean wells
Same running and pulling tools as topnogo equipment
Snap ring to secure melon and lock in setpositions
Baker Surset Model A running tool (D probe)
-
8/10/2019 Baker Flow Control Devices
29/32
N N E
Baker Surset Model A running tool (D probe)
If device is not set correctly, running tool
does not release plug
Brass shear screws for setting of plug
Brass shear pin to allow for over pull andshearing off
Snap ring to hold tool in release position
a er urset runn ng an sett ng
-
8/10/2019 Baker Flow Control Devices
30/32
N N E
a er urset - runn ng an sett ng
a er urset sett ng pu ng
-
8/10/2019 Baker Flow Control Devices
31/32
N N E
a er urset sett ng pu ng
If device is located correctly then therunning tool will release from the plug
Snap ring in running tool holds retainerFN dogs in release position
Snap ring holds expander mandrel in setposition
To pull device use either Baker M or OtisGS - ensure equalization before pulling
a er urset summary
-
8/10/2019 Baker Flow Control Devices
32/32
a er urset summary
Locks fit in matched landing nipples i.e, AF into AF
Three pressure ratings available
Two equalizing assemblies in use H and M (R)
Model A running tool with D probe to set
Pulled with either a Baker M or Otis GS
T2 type standing valve adapter used i.e. AFT 2