Baguio City - UN ESCAP City.pdf · Wastewater Management in Baguio Relocation Survey and Profiling...
Transcript of Baguio City - UN ESCAP City.pdf · Wastewater Management in Baguio Relocation Survey and Profiling...
![Page 1: Baguio City - UN ESCAP City.pdf · Wastewater Management in Baguio Relocation Survey and Profiling of Communal Septic Tanks: US$ 25,000 Siting for a septagetreatment plant location](https://reader033.fdocuments.us/reader033/viewer/2022042709/5f54763d038392784e2a45d7/html5/thumbnails/1.jpg)
Baguio City:Insights on the Urban Nexus
CORDELIA C. LACSAMANACity Environment & Parks Management Officer
Baguio City, Philippines
![Page 2: Baguio City - UN ESCAP City.pdf · Wastewater Management in Baguio Relocation Survey and Profiling of Communal Septic Tanks: US$ 25,000 Siting for a septagetreatment plant location](https://reader033.fdocuments.us/reader033/viewer/2022042709/5f54763d038392784e2a45d7/html5/thumbnails/2.jpg)
URBAN NEXUS COMPONENTS
WasteH20 Treatment Systems
EnergyGeneration for Savings
Urban Agriculture
Food Security
SWIM
Increased volume of treated water can be a resource to establish a mini‐hydro to
supplement power needs of the BSTP
DEWATS Approach• Expansion of the BSTP• Recovery/Rehab of • Communal Septic Tanks• Construction of Septage
System
• Treated Water and Sludge as inputs for parks management within the City
• Supply for adjoining agric’l areas
![Page 3: Baguio City - UN ESCAP City.pdf · Wastewater Management in Baguio Relocation Survey and Profiling of Communal Septic Tanks: US$ 25,000 Siting for a septagetreatment plant location](https://reader033.fdocuments.us/reader033/viewer/2022042709/5f54763d038392784e2a45d7/html5/thumbnails/3.jpg)
Wastewater Management in Baguio
Relocation Survey and Profiling of Communal Septic Tanks: US$ 25,000 Siting for a septage treatment plant location within the city is being proposed.
PIPE NETWORK WITHIN COVERAGE AREA of BSTPInstalled by:
Americans (before 1986): concrete and steel pipes Tobishima (1993-1994): PVC, Hydropipeand Fiberglass main pipes City (1986 onwards): concrete and PVC pipes and interconnections
Pipe sizes of main sewer pipes: 6 inches (150mm) to 24 inches (600 mm)
Rehabilitation of sewer lines: US$ 875,000 for 2014 & 2015
![Page 4: Baguio City - UN ESCAP City.pdf · Wastewater Management in Baguio Relocation Survey and Profiling of Communal Septic Tanks: US$ 25,000 Siting for a septagetreatment plant location](https://reader033.fdocuments.us/reader033/viewer/2022042709/5f54763d038392784e2a45d7/html5/thumbnails/4.jpg)
PRIORITY PROGRAMS
Installation of Dewatering Machine: US$ 400,000
Installation of a Sequential Batch Reactor (SBR): US$ 400,000
![Page 5: Baguio City - UN ESCAP City.pdf · Wastewater Management in Baguio Relocation Survey and Profiling of Communal Septic Tanks: US$ 25,000 Siting for a septagetreatment plant location](https://reader033.fdocuments.us/reader033/viewer/2022042709/5f54763d038392784e2a45d7/html5/thumbnails/5.jpg)
Further laboratory testing of sludge will be undertaken to ensure safe vegetable production.
Correctly treated fecal sludge can be reused for agricultural purposes.
![Page 6: Baguio City - UN ESCAP City.pdf · Wastewater Management in Baguio Relocation Survey and Profiling of Communal Septic Tanks: US$ 25,000 Siting for a septagetreatment plant location](https://reader033.fdocuments.us/reader033/viewer/2022042709/5f54763d038392784e2a45d7/html5/thumbnails/6.jpg)
ENERGY
http://www.negrosforests.org/news-oct0909
US$ 10,000/yr. for effluent discharge under the Clean Water Act
US$ 150,000/yr. for power consumption
![Page 7: Baguio City - UN ESCAP City.pdf · Wastewater Management in Baguio Relocation Survey and Profiling of Communal Septic Tanks: US$ 25,000 Siting for a septagetreatment plant location](https://reader033.fdocuments.us/reader033/viewer/2022042709/5f54763d038392784e2a45d7/html5/thumbnails/7.jpg)
EXPECTED BENEFITS The City has strengthened its
development network that facilitatedaccess to a technical assistance grant.
The City is adopting the Urban NexusApproach in recasting its new CityDevelopment Plan.
The City expects to improvewastewater management as a majorurban service with the equivalentrevenue increases.
![Page 8: Baguio City - UN ESCAP City.pdf · Wastewater Management in Baguio Relocation Survey and Profiling of Communal Septic Tanks: US$ 25,000 Siting for a septagetreatment plant location](https://reader033.fdocuments.us/reader033/viewer/2022042709/5f54763d038392784e2a45d7/html5/thumbnails/8.jpg)
KEY LESSONS LEARNED Hands‐on City to City exchanges is an effective strategy for
learning and re‐learning urban development.
The key to effective and responsive project developmentdepends on timely and adequate information base.
Local government officials must have keen interest invarious development approaches to enhance and enrichurban development.
National and local government agencies must coordinatemore to facilitate planning, project development andexecution.
![Page 9: Baguio City - UN ESCAP City.pdf · Wastewater Management in Baguio Relocation Survey and Profiling of Communal Septic Tanks: US$ 25,000 Siting for a septagetreatment plant location](https://reader033.fdocuments.us/reader033/viewer/2022042709/5f54763d038392784e2a45d7/html5/thumbnails/9.jpg)