The Back to Basics Presentation will cover the following aspects :
• Background to B2B Programme
• Priorities of the Programme
• Quarterly M&E Process
• Municipal Process
• Current status of Municipalities
• Lessons Learnt and Best Practices
• Way forward
Background to B2B
Background to B2B
• The Back to Basics programme was launched with the theme of“Serving Our Communities Better”. The Presidential Summit washeld on the 18 September 2014, in which the President, outlinedgovernments plan of action for the next 5 years which is to ensurea focused and strengthened local government by getting thebasics right and together with other spheres of government ,providing basic services efficiently and effectively and in a caringmanner.
Put people and their concerns first – listen & communicate
Deliver municipal
services to the right quality and standard
Good governance and
sound administration
Sound financial management
and accounting
Building institution and administrative
capabilities
• The overall goal of the B2B Programme is to improve thefunctioning of municipalities to better serve communities bygetting the basics right.
• The 1st phase of the B2B programme, during the last Councilterm had been successfully executed and as such, the B2B toBasics Program for the 2016/21 Municipal Councils’ term ofoffice was launched on 27th January 2017.
• Critical to the success of the Back to Basics approach is aligningand coordinating the activities of different national andprovincial departments, agencies and state owned companiesin supporting, and where necessary, intervening inmunicipalities.
4
Background to B2B
• The B2B processes have been developed, implemented andimproved over the last 2-3 years.
• These amendment included changes to the CMET tool basedon discussions and inputs by all role players and amendmentsto the assessment process.
• The current approach as followed by KZN COGTA is regardedby National DCOG as best practice and is being rolled outsimilarly in other Provinces
5
Background to B2B
We understand our task to take Local Government forward into the next phase of transformation as follows:
• Back to Basics: Setting clear benchmarks of performance in ourefforts to ensure that all municipalities perform their basicresponsibilities, every day, without fail;
• Responding vigorously to the immediate crises;
• Understanding and responding to the structural challenges;
• Continuing to build resilient local government institutions; and
• Collectively constructing more rigorous systems ofintergovernmental relations/ planning and delivery.
6
Priority Of The Back To
Basics Programme
• Identify areas where the municipality is not getting the basicsright (CMET, AG findings, IDPs, other assessments)
• Where there are serious and persistent deficiencies, the Actionplans are used as a tool for channelling support initiatives.
• It is assumed that once these deficiencies are addressed, theprovision of services will improve.
• To state it differently:
If a municipality has proper plans in place, which is budgetedfor, and responsive to the needs of people, implementedeffectively and efficiently, by qualified personnel and thenecessary control measures are in place, it is assumed thatservice delivery will take place in an optimised manner
How Do We Achieve the
Priority Of The Programme
• Following more than 2 years of implementation and variousguiding principles and numerous inputs, a set of keyperformance indicators were developed to monitor what isbeing achieved.
• Municipalities are encouraged to include the identified KPI’sin their IDP’s and SDBIP.
• The Key Performance Indicators are as follows :
How Do We Achieve the
Priority Of The Programme
How Do We Achieve the
Priority Of The Programme
Pillar 1: Putting People First
• Number of Ward Committee meetings held per month in the past quarter (per ward)
• Number of ward committee reports submitted per ward
• Number of sectoral reports submitted per ward committee per month
• Number of wards where community meetings were held
PILLAR 2: SERVICE DELIVERY
• Percentage of households with access to potable water
• Percentage of households served with a sanitation facility
• Percentage of households served with electricity.
• Percentage of planned new housing units constructed
• Percentage of households which have access to refuse removal
• Does the municipality have an approved roads maintenance plan for the year ?
• Percentage of targeted municipal roads maintained in terms of the Municipality's approved maintenance plan
• Indigent Register
• Percentage of registered indigent households receiving Free Basic Water
• Percentage of registered indigent households receiving Free Basic Electricity
• Percentage of registered indigent households receiving Free Basic Refuse Removal
How Do We Achieve the
Priority Of The Programme
Pillar 3: Good Governance
• Number of Council meetings held over the past Quarter
• Number of EXCO meetings held
• Percentage of functional Portfolio Committees
• Number of Audit Committee meetings held
• Number of Audit Committee reports submitted to Council
• Number of MPAC meetings held
• % of functional IGR structures (Mayors forum, MM forums and District Technical Fora)
How Do We Achieve the
Priority Of The Programme
Pillar 4: Sound Financial Management
• % Audit Queries resolved
• % of MIG Expenditure
• % allocation to free Basic Services Spent (Annual)
• % of operating budget spent
• % of Repairs and Maintenance spent
• % of Debtors Collection Rate
• Outstanding Debtors (>120 days)
• Cash Backing of Conditional Grants
• % of Irregular, Fruitless and Waste Expenditure incurred
• % of Irregular, Fruitless and Waste Expenditure resolved
• % Capital Budget Spent
How Do We Achieve the
Priority Of The Programme
Pillar 5: Building Capable Local Government Institutions
• Number of Section 54/56 posts filled
• Number of vacant budgeted posts against approved organogram
• % of budget spent on implementing Workplace Skill Plan.
How Do We Achieve the
Priority Of The Programme
Pro
po
sed
pro
cess fo
r Qu
arterly asse
ssmen
ts
Activity Deadline Responsibility
1. B2B Action plan circulated to COGTA BU’s on a monthly basis for input iro current quarter.
15th to 25h of each month of the quarter
MPMRE/BUs
2. B2B Action plan circulated to Sector Departments on a monthly basis for input iro current quarter.
15th to 25th Third month of the quarter
MPMRE/Sectors
3.Circular to municipalities outlining requirements and deadlines for the quarterly assessments
5th of the first month of the quarter
MPMRE
4. Municipalities to submit completed CMET assessment tool and updated validated B2B Action Plan progress to MPMRE
15th of the first month of the quarter
Municipalities
5. Follow-up/ reminder communication to municipalities that has not submitted
15th to 20th of the first month of the quarter
MPMRE
6. Circulate received CMET assessment tool s to COGTA BU’s for verification of info
20th of the first month of the quarter
MPMRE/Bu’s
7. Determine all outstanding CMET assessment tools and Validated B2B Action Plan updates and escalate to LG champions for action
20th of the first month of the quarter
MPMRE
QUARTERLY ASSESSMENT PROCESS
14Certain flexibilities i.t.o. deadlines can be accommodated to make provision for contingencies and unforeseen circumstances
Pro
po
sed
pro
cess fo
r Qu
arterly asse
ssmen
ts
Activity Deadline Responsibility
8. COGTA BU’s to conduct verification visits to municipalities (where required)
BU’s
9. Receive validated info from COGTA BU’s 1st week of 2nd month ofquarter
MPMRE/BU’s
10. Quarterly assessment feedback Site visits 2nd week of second month of quarter (allow limited flexibility)
All
11. Finalise any updates to information subsequent to the Quarterly visits
End of 2nd month of quarter MPMRE
12. Inputs on final determination of assessment categorisation
2nd War Room/LG Branch MANCO of the quarter
LG Specialists/Branch MANCO
Activity above will be a sub-process involving the LG Branch MANCO and details of the approach needs to be finalised with inputs from the Branch
13. Final B2B Quarterly reporting 1st week of last month of quarter
MPMRE
14. Final reports against APP targets (% issues resolved/facilitated)
25th of last month of quarter MPMRE
QUARTERLY ASSESSMENT PROCESS
15Certain flexibilities i.t.o. deadlines can be accommodated to make provision for contingencies and unforeseen circumstances
16
CMET TOOL
17
CMET TOOL
Final Recommendation:
Considered and endorsed by KZN COGTA LG Branch
MANCO
Final Catagorisation and Support Strategy
New Assessment Approach Process
1. Assessment: Main questions, scored.
Supplementary questions considered
2. Support Plan: Implementation
Plan Progress
3. Audit Outcome
and Findings
4. Inputs from other roles
players: BU’s, Dept’s, SALGA,
etc.
19
Quarterly Assessments
Categorisation:Functional, Challenged, Requiring Intervention.
As determined by combination of:• Current/ongoing Quarterly CMET assessment• AG Findings• IDP Assessment• Any other factors as proposed and considered
by COGTA et al
CMET assessment: Key Indicators
Support Plan assessment:• Key Challenge progress• Outstanding challenges• New challenges
Best practices (focus on Functional Municipalities)
Support Response & Support Plan
updates/additions
X4
Section 47 report
PROPOSED CMET PROCESS
All CMET linked activities and processes, including
quarterly assessment, annual categorisations and
Section 47 reporting
Pro
po
sed
pro
cess fo
r Qu
arterly asse
ssmen
ts
Activity Deadline Responsibility
1. Obtain CMET and Support /Action plan from COGTA .
First week of the First Month of the New quarter
Municipalities
2. Co-ordination of Input from Depts to populate CMET Tools and Action/Support Plan
Prior to submission Municipalities
3.Municipalities to submit completed CMET assessment tool and updated validated B2B Action Plan progress to MPMRE
15th of the first month of the quarter
Municipalities
4. Attend feedback session with COGTA
2nd week of 2nd month of the quarter
Municipalities
5. Amend and finalise CMET and Support Plan in line with feedback session
3rd week of second month of the Quarter
Municipalities
MUNICIPAL PROCESS
20
Current Status
MUNICIPALITY 2014 CATEGORISATION JUNE 2017 CATEGORISATION MOVEMENT
Ugu Requiring Intervention Functional
Umdoni Functional Challenged
Umzumbe Functional Functional
Ray Nkonyeni Merged Functional N/A
Umuziwabantu Functional Requiring Intervention
Umgungundlovu Functional Challenged
Umshwathi Challenged Functional
Umngeni Challenged Functional
Mpofana Requiring Intervention Functional
Impendle Functional Functional
Msunduzi Functional Functional
Mkhambathini Functional Functional
Richmond Functional Functional
Uthukela Challenged Functional
Alfred Duma Merged Functional N/A
Okhahlamba Functional Functional
Inkosi Langalibalele Merged Challenged N/A
Current Status
Municipality 2014 Categorisation June 2017 Categorisation Movement
Umzinyathi Requiring Intervention Requiring Intervention
Endumeni Requiring Intervention Functional
Umvoti Requiring Intervention Requiring Intervention
Nquthu Functional Requiring Intervention
Msinga Functional Functional
Amajuba District Requiring Intervention Challenged
Newcastle Challenged Functional
Dannhauser Functional Functional
EmadlangeniFunctional
Requiring Intervention(Section 139 Intervention)
Zululand Challenged Functional
Edumbe Challenged Challenged
Abaqulusi Challenged Challenged
Nongoma Requiring Intervention Functional
Uphongolo Challenged Functional
Ulundi Loc Challenged Functional
Current Status
MUNICIPALITY 2014 CATEGORISATION JUNE 2017 CATEGORISATION MOVEMENT
Umkhanyakude Challenged Requiring Intervention
Umhlabuyalingana Functional Functional
Jozini Challenged Challenged
The Big 5 Hlabisa Merged Challenged N/A
Mtubatuba Local Requiring Intervention Challenged
King Cetshwayo Distr Functional Functional
Umfolozi Challenged Functional
Umhlathuze Functional Functional
Umlalazi Functional Functional
Nkandla Functional Functional
Mthonjaneni Functional Functional
Ilembe Functional Functional
Kwadukuza Functional Functional
Mandeni Functional Functional
Ndwedwe Challenged Challenged
Maphumulo Challenged Requiring Intervention
Current Status
MUNICIPALITY 2014 CATEGORISATION JUNE 2017 CATEGORISATION MOVEMENT
Harry Gwala District Functional Functional
Greater Kokstad Challenged Functional
Dr Nskosazana Dlamini-zuma Merged Functional N/A
Ubuhlebezwe Functional Functional
Umzimkhulu Functional Functional
Ethekwini Functional Functional
• Overall, 7 municipalities regressed, 15 improved, 27 did not change and 5 are those affected by re-demarcation
• Above categorisation reflects only the original and latest categorisation – in-between quarterly categorisation could fluctuate
• 2 main factors contributed to the current categorisation: CMET and Support plan (but also section 139 interventions in some cases)
• Development of CMET;
• Establishment of a Provincial Task Team comprising of all sector departments to engage with Municipalities;
• Political and Administrative engagements on a quarterly basis with municipalities;
• Consistency and compliance in Quarterly reporting.
Best Practises
• Municipalities are unique – eg. Provision of refuse removal (Urban Vs Rural areas)
• Indicators had be streamlined to focus on core mandates – reduced from 101 to under 40 indicators
• Quarterly reporting linked to the Municipal FY is more effective than previous annual reporting
• Site visits improve political oversight due to attendance of EXCO in visits
Lessons Learnt
Strengthening The System Of Local Government• The Department remains committed in supporting the municipalities to meet
their basic delivery mandates through the Back to Basics programme.
• 54 Municipal Support Plans have been implemented in line with the B2B approach and 11 point plan.
• The Back to Basics reporting template will continue to be utilized to improve reporting for the municipalities.
• Continuous support will be provided to municipalities to ensure that they are complying with single reporting system as well as to institutionalise performance management system through assessing the alignment of IDP with Scorecard and Service Delivery Budget Implementation Plan (SDBIP).
• The department is also supporting municipalities to enhance the oversight role of councillors in assessing the performance of administration.
27
Way Forward