![Page 1: Back to Basics for Property Management and Acquisition Presenter By: Beth Green, CPPM, CF Consultant Tara S. Miller, PMP, CPPM, CF.](https://reader035.fdocuments.us/reader035/viewer/2022062421/56649e615503460f94b5c081/html5/thumbnails/1.jpg)
Back to Basics for Property Management and Acquisition
Presenter By:Beth Green, CPPM, CFConsultant
Tara S. Miller, PMP, CPPM, CF
![Page 2: Back to Basics for Property Management and Acquisition Presenter By: Beth Green, CPPM, CF Consultant Tara S. Miller, PMP, CPPM, CF.](https://reader035.fdocuments.us/reader035/viewer/2022062421/56649e615503460f94b5c081/html5/thumbnails/2.jpg)
Property Management
![Page 3: Back to Basics for Property Management and Acquisition Presenter By: Beth Green, CPPM, CF Consultant Tara S. Miller, PMP, CPPM, CF.](https://reader035.fdocuments.us/reader035/viewer/2022062421/56649e615503460f94b5c081/html5/thumbnails/3.jpg)
FAR 52-245-1 (b) Property Management (April 2012)
(1) The Contractor shall have a system of internal controls to manage (control, use, preserve, protect, repair and maintain) Government property in its possession. The system shall be adequate to satisfy the requirements of this clause. In doing so, the Contractor shall initiate and maintain the processes, systems, procedures, records, and methodologies necessary for effective and efficient control of Government property.
Property Management
![Page 4: Back to Basics for Property Management and Acquisition Presenter By: Beth Green, CPPM, CF Consultant Tara S. Miller, PMP, CPPM, CF.](https://reader035.fdocuments.us/reader035/viewer/2022062421/56649e615503460f94b5c081/html5/thumbnails/4.jpg)
FAR 52-245-1 (f) Contractor plans and systems (June 2007) (1) Contractors shall establish and implement property management plans, systems and procedures at the contract, program, site or entity level to enable the following outcomes:
![Page 5: Back to Basics for Property Management and Acquisition Presenter By: Beth Green, CPPM, CF Consultant Tara S. Miller, PMP, CPPM, CF.](https://reader035.fdocuments.us/reader035/viewer/2022062421/56649e615503460f94b5c081/html5/thumbnails/5.jpg)
• OutcomesAcquisition
Receipt (Identification)Records
Physical Inventory Subcontract Control
ReportsRelief of Stewardship
Utilizing (Use, Consume, Move, and Store)Maintenance
Property Closeout
![Page 6: Back to Basics for Property Management and Acquisition Presenter By: Beth Green, CPPM, CF Consultant Tara S. Miller, PMP, CPPM, CF.](https://reader035.fdocuments.us/reader035/viewer/2022062421/56649e615503460f94b5c081/html5/thumbnails/6.jpg)
• Besides the 10 outcomes we just talked about there are requirements addressed in FAR Clause 52.245-1Source documentsProceduresSelf-assessmentReference documents
Property Management Plan
![Page 7: Back to Basics for Property Management and Acquisition Presenter By: Beth Green, CPPM, CF Consultant Tara S. Miller, PMP, CPPM, CF.](https://reader035.fdocuments.us/reader035/viewer/2022062421/56649e615503460f94b5c081/html5/thumbnails/7.jpg)
• Benefits that can be gained from an Effective Property Management System Provides an effective management
tool Maximizes return on investment Ensures effective stewardship Facilitates compliance Increases reutilization Increased cooperation and collaboration
![Page 8: Back to Basics for Property Management and Acquisition Presenter By: Beth Green, CPPM, CF Consultant Tara S. Miller, PMP, CPPM, CF.](https://reader035.fdocuments.us/reader035/viewer/2022062421/56649e615503460f94b5c081/html5/thumbnails/8.jpg)
•What is a Property Management Plan? A calculated look at how best to
manage the government’s property based on the best value for the: Program Site (Location) Entity (Group) level
•What Should the plan provide? Performance outcomes (Acquisition
thru Contract Closeout) Using primarily VCS and/or ILPs
Property Management Plan
![Page 9: Back to Basics for Property Management and Acquisition Presenter By: Beth Green, CPPM, CF Consultant Tara S. Miller, PMP, CPPM, CF.](https://reader035.fdocuments.us/reader035/viewer/2022062421/56649e615503460f94b5c081/html5/thumbnails/9.jpg)
•The property plan should address four major topics besides the outcomes should be rather simple in nature (don’t complicate things): An Introduction The Scope The Purpose and Process Ownership
Property Management Plan
![Page 10: Back to Basics for Property Management and Acquisition Presenter By: Beth Green, CPPM, CF Consultant Tara S. Miller, PMP, CPPM, CF.](https://reader035.fdocuments.us/reader035/viewer/2022062421/56649e615503460f94b5c081/html5/thumbnails/10.jpg)
•Developing the Property Plan Preparing your procedures (different
than a plan) Assess the 10 Outcomes and how the
standards may assist Tackling the added requirements
outlined in the property clause 52.245-1 •E2279-03 Establishing the Guiding Principles
of Property Management•E2135-01 Terminology for Property and Asset
Management
Property Management Plan
![Page 11: Back to Basics for Property Management and Acquisition Presenter By: Beth Green, CPPM, CF Consultant Tara S. Miller, PMP, CPPM, CF.](https://reader035.fdocuments.us/reader035/viewer/2022062421/56649e615503460f94b5c081/html5/thumbnails/11.jpg)
•Yes procedures are part of the plan•They should address policies on how you are going to manage the Government property in your possession. (not necessarily desk top guides)•When developing your procedures The FAR guiding principles The meaning of accountability, and Applying the word stewardship
Procedures
![Page 12: Back to Basics for Property Management and Acquisition Presenter By: Beth Green, CPPM, CF Consultant Tara S. Miller, PMP, CPPM, CF.](https://reader035.fdocuments.us/reader035/viewer/2022062421/56649e615503460f94b5c081/html5/thumbnails/12.jpg)
•Compliance with Regulations Requirements of the Contract Policies (Government and
Company) Procedures (Property) Operational guidelines
(Safety and Environmental)
Property Management Plan
![Page 13: Back to Basics for Property Management and Acquisition Presenter By: Beth Green, CPPM, CF Consultant Tara S. Miller, PMP, CPPM, CF.](https://reader035.fdocuments.us/reader035/viewer/2022062421/56649e615503460f94b5c081/html5/thumbnails/13.jpg)
FAR 52-245-1 (b) Property Management (April 2012)
(1) (continued) The Contractor shall disclose any significant changes to its property management system to the Property Administrator prior to implementation of the changes.
![Page 14: Back to Basics for Property Management and Acquisition Presenter By: Beth Green, CPPM, CF Consultant Tara S. Miller, PMP, CPPM, CF.](https://reader035.fdocuments.us/reader035/viewer/2022062421/56649e615503460f94b5c081/html5/thumbnails/14.jpg)
FAR 52-245-1 (b) Property Management (April 2012)
(1) (continued) The Contractor May employ customary commercial practices, voluntary consensus standards, or industry-leading practices and standards that provide effective and efficient Government property management that are necessary and appropriate for performance of this contract (except where inconsistent with law or regulation).
![Page 15: Back to Basics for Property Management and Acquisition Presenter By: Beth Green, CPPM, CF Consultant Tara S. Miller, PMP, CPPM, CF.](https://reader035.fdocuments.us/reader035/viewer/2022062421/56649e615503460f94b5c081/html5/thumbnails/15.jpg)
•National Technology Transfer and Advancement Act of 1995 Gives the meaning of VCS.•Means common and repeated use of rules, conditions, guidelines or characteristics for products, or related processes and production methods and related management systems.•VCS is developed or adopted by domestic and international voluntary consensus standard making bodies
Voluntary Consensus Standards (VCS)
![Page 16: Back to Basics for Property Management and Acquisition Presenter By: Beth Green, CPPM, CF Consultant Tara S. Miller, PMP, CPPM, CF.](https://reader035.fdocuments.us/reader035/viewer/2022062421/56649e615503460f94b5c081/html5/thumbnails/16.jpg)
• ASTM International• E53 Committee Summary of Active
Standards
ASTM International
![Page 17: Back to Basics for Property Management and Acquisition Presenter By: Beth Green, CPPM, CF Consultant Tara S. Miller, PMP, CPPM, CF.](https://reader035.fdocuments.us/reader035/viewer/2022062421/56649e615503460f94b5c081/html5/thumbnails/17.jpg)
•Based on empirical (repeatable) research, evidence and literature pertaining to that business practice. In order for the process to become an ILP, it should be widely used.•Generally, there should be supporting historical data from an accepted source, e.g., trade publications, literature, etc. to support the process as being repeatable, efficient, measurable, and verifiable.
Industry Leading Practices (ILP)
![Page 18: Back to Basics for Property Management and Acquisition Presenter By: Beth Green, CPPM, CF Consultant Tara S. Miller, PMP, CPPM, CF.](https://reader035.fdocuments.us/reader035/viewer/2022062421/56649e615503460f94b5c081/html5/thumbnails/18.jpg)
FAR 52-245-1 (b) Property Management (April 2012)(2) The Contractor’s responsibility extends from the initial acquisition and receipt of property, through stewardship, custody, and use until formally relieved of responsibility by authorized means, including delivery, consumption, expending, sale (as surplus property) or other disposition, or via a completed investigation, evaluation, and final determination for lost property.
Property Management
![Page 19: Back to Basics for Property Management and Acquisition Presenter By: Beth Green, CPPM, CF Consultant Tara S. Miller, PMP, CPPM, CF.](https://reader035.fdocuments.us/reader035/viewer/2022062421/56649e615503460f94b5c081/html5/thumbnails/19.jpg)
•Ownership, Accountability, and Responsibility “Ownership” is having legal or rightful
title to property. “Accountability” (that is, to be
accountable) means to possess and have use of the property of another with delegated duties and responsibilities, subject to penalty in case of default.
“Responsibility” (that is, to be responsible) means to be answerable for a trust or obligation.
Property Management
![Page 20: Back to Basics for Property Management and Acquisition Presenter By: Beth Green, CPPM, CF Consultant Tara S. Miller, PMP, CPPM, CF.](https://reader035.fdocuments.us/reader035/viewer/2022062421/56649e615503460f94b5c081/html5/thumbnails/20.jpg)
FAR 52.245-1 (b) Property Management (April 2012)(3) The contractor shall include the requirements of this clause in all subcontracts under which Government property is acquired or furnished for subcontract performance.
Property Management
![Page 21: Back to Basics for Property Management and Acquisition Presenter By: Beth Green, CPPM, CF Consultant Tara S. Miller, PMP, CPPM, CF.](https://reader035.fdocuments.us/reader035/viewer/2022062421/56649e615503460f94b5c081/html5/thumbnails/21.jpg)
FAR 52.245-1 (b) Property Management (April 2012)(4) The Contractor shall establish and maintain procedures necessary to assess its property management system effectiveness and shall perform periodic internal reviews and surveillances, self assessments, or audits. Significant findings and/or results of such reviews and audits pertaining to Government property shall be made available to the Property Administrator.
Property Management
![Page 22: Back to Basics for Property Management and Acquisition Presenter By: Beth Green, CPPM, CF Consultant Tara S. Miller, PMP, CPPM, CF.](https://reader035.fdocuments.us/reader035/viewer/2022062421/56649e615503460f94b5c081/html5/thumbnails/22.jpg)
Acquisition of
Property
![Page 23: Back to Basics for Property Management and Acquisition Presenter By: Beth Green, CPPM, CF Consultant Tara S. Miller, PMP, CPPM, CF.](https://reader035.fdocuments.us/reader035/viewer/2022062421/56649e615503460f94b5c081/html5/thumbnails/23.jpg)
FAR 52.245-1 (a) Definitions (June 2007)As used in this clause— “Unit acquisition cost” means—(1) For Government-furnished property, the dollar value assigned by the Government and identified in the contract; and(2) For contractor-acquired property, the cost derived from the contractor’s records that reflect consistently applied generally accepted accounting principles.
Acquisition
![Page 24: Back to Basics for Property Management and Acquisition Presenter By: Beth Green, CPPM, CF Consultant Tara S. Miller, PMP, CPPM, CF.](https://reader035.fdocuments.us/reader035/viewer/2022062421/56649e615503460f94b5c081/html5/thumbnails/24.jpg)
FAR 52-245-1 (f) (1) Contractor Plans and Systems (August 2010) (i) Acquisition of property. The Contractor shall document that all property was acquired consistent with its engineering, production planning, and property control operations.
Acquisition
![Page 25: Back to Basics for Property Management and Acquisition Presenter By: Beth Green, CPPM, CF Consultant Tara S. Miller, PMP, CPPM, CF.](https://reader035.fdocuments.us/reader035/viewer/2022062421/56649e615503460f94b5c081/html5/thumbnails/25.jpg)
• Acquisition of Government Property Shall be documented In accordance with contract
requirements Approval process
E2495-13 Standard Practice for Prioritizing Asset Resources for Acquisition, Utilization, and Disposition
Acquisition
![Page 26: Back to Basics for Property Management and Acquisition Presenter By: Beth Green, CPPM, CF Consultant Tara S. Miller, PMP, CPPM, CF.](https://reader035.fdocuments.us/reader035/viewer/2022062421/56649e615503460f94b5c081/html5/thumbnails/26.jpg)
•Acquisition of Property (Outcome #1)•Acquiring (to get or to gain)•Acquisition begins when needs have
been defined.•Reutilization
Acquiring excess, surplus or on-hand assets that are idle
The preferred method of acquisition and supply for any organization and is considered by the federal government to always be the first source of supply
Acquisition
![Page 27: Back to Basics for Property Management and Acquisition Presenter By: Beth Green, CPPM, CF Consultant Tara S. Miller, PMP, CPPM, CF.](https://reader035.fdocuments.us/reader035/viewer/2022062421/56649e615503460f94b5c081/html5/thumbnails/27.jpg)
•Acquisition of Property (Outcome #1) (continued)
Purchase (new or used) The acquiring of property or services
by contract with appropriated funds through purchase or lease, whether the property or services are already in existence or must be created, developed, demonstrated, and evaluated
The approval process begins with obtaining approval to spend budgeted organization funds
Acquisition
![Page 28: Back to Basics for Property Management and Acquisition Presenter By: Beth Green, CPPM, CF Consultant Tara S. Miller, PMP, CPPM, CF.](https://reader035.fdocuments.us/reader035/viewer/2022062421/56649e615503460f94b5c081/html5/thumbnails/28.jpg)
•Acquisition of Property (Outcome #1) (continued) Lease/Rent Fabricate (to make or build in-house)
The most important considerations for in-house fabrication are the capacity and expertise of organization staff and the facilities and tools required
Loans Attempt to establish formal loan
agreements Transfer
From another contractor approved by the Government
Acquisition
![Page 29: Back to Basics for Property Management and Acquisition Presenter By: Beth Green, CPPM, CF Consultant Tara S. Miller, PMP, CPPM, CF.](https://reader035.fdocuments.us/reader035/viewer/2022062421/56649e615503460f94b5c081/html5/thumbnails/29.jpg)
FAR 45.101 Definitions (June 2007)• “Material” means property that
may be consumed or expended during the performance of a contract, component parts of a higher assembly, or items that lose their individual identity through incorporation into an end-item. Material does not include equipment, special tooling, and special test equipment or real property.
Acquisition
![Page 30: Back to Basics for Property Management and Acquisition Presenter By: Beth Green, CPPM, CF Consultant Tara S. Miller, PMP, CPPM, CF.](https://reader035.fdocuments.us/reader035/viewer/2022062421/56649e615503460f94b5c081/html5/thumbnails/30.jpg)
FAR 52.245-1 (a) Definitions (August 2010)• Equipment – Means a tangible item that
is functionally complete for its intended purpose, durable, nonexpendable, and needed for the performance of a contract. Equipment is not intended for sale, and does not ordinarily lose its identity or become a component part of another article when put into use. Equipment does not include material, real property, special test equipment or special tooling.
Acquisition
![Page 31: Back to Basics for Property Management and Acquisition Presenter By: Beth Green, CPPM, CF Consultant Tara S. Miller, PMP, CPPM, CF.](https://reader035.fdocuments.us/reader035/viewer/2022062421/56649e615503460f94b5c081/html5/thumbnails/31.jpg)
ASTM Standard E-2135Provides a Definition (higher level)
Equipment is non-expendable, tangible moveable property needed for the performance of a task or useful in effectingan obligation
Acquisition
![Page 32: Back to Basics for Property Management and Acquisition Presenter By: Beth Green, CPPM, CF Consultant Tara S. Miller, PMP, CPPM, CF.](https://reader035.fdocuments.us/reader035/viewer/2022062421/56649e615503460f94b5c081/html5/thumbnails/32.jpg)
FAR 45.301 DefinitionsAgency Peculiar Property:• Means Government-owned personal
property that is peculiar to the mission of one agency (e.g., military or space property). It excludes Government material, special test equipment, special tooling, and facilities.
FAR 45.310 (b) Providing agency-peculiar property • Direction to the Government
New FAR – does not discuss APP
Acquisition
![Page 33: Back to Basics for Property Management and Acquisition Presenter By: Beth Green, CPPM, CF Consultant Tara S. Miller, PMP, CPPM, CF.](https://reader035.fdocuments.us/reader035/viewer/2022062421/56649e615503460f94b5c081/html5/thumbnails/33.jpg)
FAR 2.101 Definitions (June 2007)Special Test Equipment•Either single or multipurpose integrated
test units engineered, designed, fabricated, or modified to accomplish special purpose testing in performing a contract. It consists of items or assemblies of equipment including foundations and similar improvements necessary for installing special test equipment, and standard or general purpose items
Acquisition
![Page 34: Back to Basics for Property Management and Acquisition Presenter By: Beth Green, CPPM, CF Consultant Tara S. Miller, PMP, CPPM, CF.](https://reader035.fdocuments.us/reader035/viewer/2022062421/56649e615503460f94b5c081/html5/thumbnails/34.jpg)
FAR 2.101 Definitions (June 2007)Special Test Equipment (continued)•or components that are interconnected
and interdependent so as to become a new functional entity for special testing purposes. Special test equipment does not include material, special tooling, real property, and equipment items used for general testing purposes or property that with relatively minor expense can be made suitable for general purpose use.
Acquisition
![Page 35: Back to Basics for Property Management and Acquisition Presenter By: Beth Green, CPPM, CF Consultant Tara S. Miller, PMP, CPPM, CF.](https://reader035.fdocuments.us/reader035/viewer/2022062421/56649e615503460f94b5c081/html5/thumbnails/35.jpg)
FAR 2.101 Definitions (August 2010) Special Tooling •means jigs, dies, fixtures, molds, patterns, taps,
gauges, and all components of these items including foundations and similar improvements necessary for installing special tooling equipment, and which are of such a specialized nature that without substantial modification or alteration their use is limited to the development or production of particular supplies or parts thereof or to the performance of particular services. Special tooling does not include material, special test equipment, real property, equipment, machine tools, or similar capital items.
Acquisition
![Page 36: Back to Basics for Property Management and Acquisition Presenter By: Beth Green, CPPM, CF Consultant Tara S. Miller, PMP, CPPM, CF.](https://reader035.fdocuments.us/reader035/viewer/2022062421/56649e615503460f94b5c081/html5/thumbnails/36.jpg)
• Our goal was to provide a basic understanding of Government Property Management and the requirements for establishing a Property Management System and Plan.
• We also presented one of the first steps in having Government Property – Acquisition. We reviewed the different types of Acquisition and what is necessary to pass the Acquisition Outcome in an audit.
Rosanne “Beth” Green, CPPM, [email protected]