  • 8/12/2019 Babrchara Bazar

    1/11

    Site Name : Babuchara Bazar

    Address :

    Zone : Chittagong

    Teletalk

    Department Head

    Signature : Signature :

    Name : Name :

    Designation : Designation :

    Mobile No. : Mobile No. :

    Date : Date :

    Contractor

    Name : Md. Anisur Rahman

    Designation : Sr.Project Engineer

    Contract number: BEL Construction Sdn Bhd Ltd.

    Date :

    Prepared by System Engineering

    MEASUREMENT BOOK

    Site Engineer

  • 8/12/2019 Babrchara Bazar

    2/11

  • 8/12/2019 Babrchara Bazar

    3/11

    1 Item DescriptionNo of

    MemberLength Breadth Height Volume (Cum)

    a. Exacvation Footing 4.00 6.600 3.300 2.400 209.088

    Sand filling 1.00 4.050 4.050 0.600 9.842

    Footing 4.00 2.900 2.900 0.450 15.138

    b. Column up to PL 6.00 0.375 0.375 3.000 2.531

    c Column PL to Roof slab 6.00 0.350 0.350 3.150 2.315

    d Grade Beam -

    e Roof Beam

    Beam B1 4.00 6.500 0.350 0.450 4.095

    Beam B2 4.00 6.600 0.350 0.450 4.158

    g Roof slab 1.00 5.200 4.90 0.125 3.185

    Floor slab 1.00 5.700 4.75 0.125 3.384

    h Door lintel 2.00 5.50 0.25 0.150 0.413

    i AC lintel 2.00 1.50 1.50 0.150 0.675

    j AC Slab 4.00 1.50 1.50 0.125 1.125

    -

    2 Item Description No Length Breadth Height Volume (Cum)

    a AT ______ M Level -

    b Column

    c Tie Beam 1 4.00 6.600 0.350 0.450 4.158

    d Tie Beam 1 6.00 6.860 0.350 0.450 6.483

    e Tower Beam- 1

    f Tower Beam- 2

    47.66Total

    RCC Work

    BTS Room

    Tower Foundation

    RCC WORKS

    Sub Total 37.019

    Sub Total 10.641

    Teletalk Representative Contractor Representative

  • 8/12/2019 Babrchara Bazar

    4/11

    3 Item DescriptionNo of

    MemberLength

    No of

    Bar

    Unit

    Weight

    (Kg/m)

    Total

    Weight (Kg)

    20 mm dia Bottom Layer

    20 mm dia Top layer

    16 mm dia Bottom Layer 4.00 2.750 55.000 1.580 955.90

    16 mm dia Top layer 4.00 2.750 45.000 1.580 782.10

    20 mm dia St.bar 4.00 13.50 10.00 2.470 1333.80

    20 mm dia St.bar 4.00 1.59 8.00 2.470 125.67

    10mm Stirrup 4.00 1.58 96.00 0.620 376.17

    1835.64

    20mm dia St.bar

    16mm dia St.bar

    10mm Stirrup

    20mm dia St.bar 16.00 4.250 6.00 2.470 1007.76

    16mm dia St.bar

    10mm Stirrup 16.00 1.25 45.00 0.620 558.00

    1565.76

    Floor Beam

    d

    REINFORCEMENT

    BTS Room

    a

    b

    c

    Column

    Footing

    Grade Beam

    Teletalk Representative Contractor Representative

  • 8/12/2019 Babrchara Bazar

    5/11

    Item DescriptionNo of

    MemberLength

    No of

    Bar

    Unit

    Weight

    (Kg/m)

    Total

    Weight (Kg)

    Long direction

    10 mm dia st. bar 6.00 4.85 21.00 0.620 378.88

    10 mm dia cut off 2.00 4.00 11.00 0.620 54.56

    10 mm dia Ex top 4.00 1.58 18.00 0.620 70.53

    10 mm dia binder

    503.97

    1007.95

    10 mm dia st. bar 6.00 4.85 20.00 0.620 360.84

    10 mm dia cut off 2.00 4.00 1.00 0.620 4.96

    10 mm dia Ex top 4.00 1.58 32.00 0.620 125.39

    10 mm dia binder

    491.19

    Short direction

    Roof slab

    f

    g

    Floor Slab

    e

  • 8/12/2019 Babrchara Bazar

    6/11

    Item DescriptionNo of

    MemberLength

    No of

    Bar

    Unit

    Weight

    (Kg/m)

    Total

    Weight (Kg)

    12 mm St 2.00 4.20 4.00 1.580 53.09

    8 mm Stirrup 2.00 0.85 14.00 0.620 14.76

    12 mm St

    8 mm Stirrup

    4 Item Description No of Member Length No of Bar Unit Wt.

    (kg/Meter)

    Total Weight

    ( Kg)

    AT --------M LEVEL

    Column

    20mm dia St.bar

    16mm dia St.bar

    10mm Stirrup

    -

    Tie Beam

    20mm dia St.bar

    16mm dia St.bar

    12mm Stirrup

    10mm Stirrup

    Tower F. Beam ( -------M Level)

    20mm dia St.bar

    16mm dia St.bar

    12mm Stirrup

    10mm Stirrup

    4968.38Net Total

    c

    Door lintel

    AC lintel

    h

    Tower Foundation

    a

    b

    67.84Net Total

  • 8/12/2019 Babrchara Bazar

    7/11

    5 Item Description No Length Breadth Height Volume (cu-m)

    BTS Long Wall 1.000 15.400 0.380 0.300 1.76

    BTS Short Wall 1.000 14.300 0.250 0.600 2.15

    Staircase 1.000 2.600 0.500 0.150 0.20

    Deducation For AC 2.00 0.75 0.68 1.020

    Deducation For Door 1.00 1.00 46.00 2.10 2.100

    6 Item Description No Length Breadth Height Area (sq-m)

    BTS Long Wall 4.00 3.33 2.88 38.362

    BTS Short Wall

    Parapet wall (Long) 1.00 19.10 0.15 2.865

    Parapet wall (Short)

    41.23

    BRICK WORKS

    b

    38.11Gross Total (c-b)

    3.12

    a

    10" Brick wall

    (5") Brick Work

    a

    Sub-Total (b)

    4.10Sub-Total (a)

    Sub Total

    Teletalk Representative Contractor Representative

  • 8/12/2019 Babrchara Bazar

    8/11

    7

    Item Description No Length Breadth HeightArea

    (sq-m)

    BTS Slab 1.00 5.000 5.02 25.100

    BTS Slab Carnish 1.00 15.50 0.15 2.325

    Out Side wall (Long direction) 1.00 12.00 3.00 36.000

    Out Side wall (Short direction) -

    Bottom of Caurnice Long +side -

    Bottom of Caurnice shot side -

    Parapet wall- Long Direction 2.00 19.40 0.15 5.820

    Parapet wall-Top 4.00 3.35 0.70 9.380

    Coloum 4.00 1.40 9.00 50.400

    Beam B1 4.00 3.35 0.70 9.380

    Beam B2 4.00 3.35 1.05 14.070

    TB 4.00 2.98 1.40 16.688

    TB 4.00 3.40 1.400 19.040

    Brick wall 1.00 16.20 0.700 11.340

    Staircase top 1 1.100 1.40 1.540

    Staircase outside 2 0.600 0.30 0.360

    AC Gap

    -

    -

    -

    Deduction

    Deducation For Door 1.00 1.10 2.10 2.310

    Deducation For AC

    8

    OTHER WORKS

    Plaster works

    Floor Tiles (Homogenious Floor Tiles R.A.K)

    201.44Sub- Total

    a

    b

    2.31Sub- Total

    199.13Gross Total (a-b)

    Teletalk Representative Contractor Representative

  • 8/12/2019 Babrchara Bazar

    9/11

    BTS Room 1.00 3.350 3.350 11.22

    BTS Door Sill

    11.22Net Total

  • 8/12/2019 Babrchara Bazar

    10/11

    9

    Item Description No Length Breadth HeightArea (sq

    m)

    BTS Wall ( Long Direction) 4.00 3.570 2.700 38.56

    BTS Wall (Short Direction)

    Door Offset Long

    Door Offset Short

    Deduction

    Deducation For Door 1.00 1.100 2.100 2.31

    Deducation For AC

    10

    Roofing compound No Length Breadth Height Area (sq-m)

    Roof Slab 1.00 4.800 4.380 21.024

    Fillet 1 1.100 0.150 0.165

    CC Pedestal outside BTS

    CC Pedestal outside Dor 1 1.110 1.000 1.110

    Roof Top 1 3.250 3.250 10.563

    Roof Top 1 3.350 3.350 11.223

    11

    BTS floor 60 mm 1 5.100 2.210 11.271

    Roof Top 75 mm 1 6.330 3.710 23.484

    34.76

    12

    Sub-Total

    Wall Tiles (Glazed and Colour Wall Tiles R.A.K)

    32.86Net Total

    Roofing compound

    Patent Stone work

    a

    b

    2.31

    36.25

    Sub- Total

    Gross- Total (a-b)

    38.56

    Teletalk Representative Contractor Representative

  • 8/12/2019 Babrchara Bazar

    11/11

    13 Item Description No Length Breadth Rate Amount

    Rain Water Down pipe 6 560.690 3,364.140

    14 Steel Door as per Design Pcs 1 12,939.000 12,939.000

    15 Abloy Lock pcs 1 9,919.000 9,919.000

    16 Indoor BTS Ladder m 15.58 645.150 10,051.44

    16 Steel Bracket Arm No

    18 Wave guide ladder m 6.00 1,376.320 8,257.92

    19 Stair Rm 4.50

    20 Folding Ladder nos. 1.00 3,500.000 3,500.00

    21 Other Items

    Net Total

    Teletalk Representative Contractor Representative