B1 Data Entry Workbook - BMP Ponds

download B1 Data Entry Workbook - BMP Ponds

of 31

Transcript of B1 Data Entry Workbook - BMP Ponds

  • 8/9/2019 B1 Data Entry Workbook - BMP Ponds

    1/15

    FIS/2005/169: Improving productivity and profitability

    of smallholder shrimp aquaculture and related

    agribusiness in Indonesia

    FIS/2005/169: Improving productivity and profitability

    of smallholder shrimp aquaculture and related

    agribusiness in Indonesia

  • 8/9/2019 B1 Data Entry Workbook - BMP Ponds

    2/15

    B1

    BMP pond: pond enrolment

    Farmer name

    Agus Muhtiyanto

    Pond ID number

    Y/N

    YesFormal group exists

    Farmer group Comment

    Farmer group name Tirta Mina Sari

    Yes Every 3 months

    Yes

    Appropriate shrimp and finfish seedstock sources available Yes

    Group meets regularly

    Most non-im lementin rou members willin to trial BMP ro ram if

    Group leader strongly supports implementation

    Y/N

    CommentFarmer

    -

    demonstration successful Yes

    Willling to implement mandatory BMPs Yes

    Willing to comply with pond-related stocking density criteria Yes

    Sufficient resources to implement mandatory BMPs Yes

    Yes

    Yes

    Committed to disciplined cooperation with other BMP implementation

    farmers

    Willing and able to continue with BMP program if this implementation

    successful

    Pond Y/N

    Yes

    YesProposed species and production system suitable

    Comment

    Part of a contiguous grouping with peripheral biosecurity barriers

  • 8/9/2019 B1 Data Entry Workbook - BMP Ponds

    3/15

  • 8/9/2019 B1 Data Entry Workbook - BMP Ponds

    4/15

    Please leave bl

    BMP pond: pond and reservoir set-up, locality map and biosecurity set-up costs

    on num er 1armer name gus u t yanto eservo r num er s

    Insert and label a map of the pond, reservoir(s) supplying water to the pond (if applicable), the surrounding dykes, canals

    ponds etc. Include all ID numbers. Show as accurately as possible location of water inlets, water outlets, directions of wa

    flow, screen sizes, pump, crab fences, embedded mesh, etc. Include a scale bar showing approx.100m and an arrow indic

    north.

  • 8/9/2019 B1 Data Entry Workbook - BMP Ponds

    5/15

    B1

    BMP pond: pond preparation

    Farmer name Pond ID numberAgus Muhtiyanto

    70

    90

    98%

    Average depth of trench sludge before remediation (cm)

    Average depth of central plateau sludge before remediation (cm)

    Proportion of trench bottom dried (%)

    100%

    50%

    0%

    Proportion of central plateau dried (%)

    Proportion of trench sludge removed (%)

    Pro ortion of central lateau slud e removed %

    Y/N

    YesSite of sludge disposal:

    Dyke sides

    No

    0%

    Away from pond

    Proportion of trench bottom tilled (%)

    So con t on w e t ng - wet W , mo st M , ry D

  • 8/9/2019 B1 Data Entry Workbook - BMP Ponds

    6/15

    BMBMP pond: dail monitoring and record form

  • 8/9/2019 B1 Data Entry Workbook - BMP Ponds

    7/15

    BM

    BMP pond: daily monitoring and record form Agus Muhtiyanto B1 Month March

    Date TD cm Sec cm Colour Sal ppt DO sun DO 1700 pH sun pH 1700 oC sun oC 1700 D

    1

    2

    3

    Farmer name Pond ID Number

    4

    5

    6 7

    8

    9

    10 1

    12 1

    13 1

    14 1

    15 1

    16 1

    17 118 1

    19 1

    20 2

    21 2

    22 85 85 clear 10.0 3.09 8.17 8.9 9.5 31.2 35.8 2

    23 85 85 clear 10.0 2.56 7.92 9.4 9.3 31.5 35.3 2

    24 85 85 clear 10.0 2.15 6.88 9.3 9.2 30.5 34.4 2

    25 85 85 clear 10.0 2.96 7.11 9.1 9.5 31.0 35.8 2

    26 90 90 clear 9.0 3.02 5.87 9.3 9.5 31.2 33.8 2

    27 90 90 clear 8.0 2.11 7.60 9.3 9.6 30.9 34.7 2

    28 95 95 clear 7.0 2.05 6.84 9.5 9.6 30.6 34.2 2

    29 95 95 clear 7.0 1.25 6.34 9.3 9.7 29.7 34.0 2

    30 100 100 clear 7.0 2.07 5.43 9.5 9.1 30.4 31.2 3

    31 100 100 clear 7.0 2.69 7.13 9.4 9.5 30.4 31.1 3

    BMP pond: weekly monitoring sheet (to be filled out by Senior Technical Officer in consultation with TE and farmer)

  • 8/9/2019 B1 Data Entry Workbook - BMP Ponds

    8/15

    BMP pond: weekly monitoring sheet (to be filled out by Senior Technical Officer in consultation with TE and farmer)

    gus u yan o

    Depth of

    oxidised surface

    Depth of

    oxidised surface Dead

    armer name

    Weekly total water exchange Pond bottom condition

    on num er

    Week

    Datacollect'n

    date

    Alkalinity

    (ppm) Out (%) In (%)

    Cost

    (Rp1000)

    representativesites in trench

    (mm )

    representativesites in central

    area (mm )

    trench sludge atrepresentative

    sites (Y/N)

    Macroalgaeabundance*

    (0/+/++/+++)

    in centralarea*

    (0/+/++/+++)

    1 28-Mar-10 63.775 0% 0% 0 1 0.0 N + 0

    2 06-Apr-10 68.877 0% 0% 0 1 1.0 N ++ +

    3 14-Apr-10 76.530 0% 0% 0 3 2.0 N ++ + . .

    4 21-Apr-10 61.224 0% 0% 0 3 2.0 N +++ +

    5 28-Apr-10 86.734 0% 0% 0 3 2.0 N ++ ++

    6 05-May-10 96.938 0% 0% 0 3 2.0 N ++ ++

    7 12-May-10 117.346 0% 0% 0 3 2.0 y ++ ++

    8 19-May-10 127.600 0% 5% 50 2 1.0 Y ++ ++ 9 26-May-10 112.244 0% 5% 35 2 1.0 Y ++ ++

    10 02-Jun-10 127.550 0% 5% 30 2 1.0 Y ++ ++

    11 09-Jun-10 127.600 5% 10% 45 1 1.0 Y + +

    12 16-Jun-10 142.856 0% 0% 0 1 1.0 Y + 0

    13 23-Jun-10 137.754 5% 5% 40 2 1.0 Y ++ +

    14 30-Jun-10 163.264 0% 0% 0 1 1.0 Y + 0

    15 07-Jul-10 152.280 0% 0% 0 1 1.0 + 0

    16 harvest

    17

    18

    19

    * 0 = none seen; + = small number/amount; ++= moderate number/amount; +++= large number/amount** Sample of 30 randomly selected shrimp collected by cast net from representative parts of the pond.

    BMP pond: weekly shrimp feeding and estimated survival

  • 8/9/2019 B1 Data Entry Workbook - BMP Ponds

    9/15

    BMP pond: weekly shrimp feeding and estimated survivalFarmer name Agus Muhtiyanto Pond ID Number B1

    Please leave blank where not applicable

    Week

    Total weekly

    feed (kg) Feed cost (Rp/kg)

    Cumulative total

    feed (kg)

    Cumulative total

    feed cost (Rp)

    Estimated shrimp survival

    (%) Comment

    1 0.00 12,000 0.0 0

    2 4.00 12,000 4.0 48,000

    3 7.25 12,000 11.3 135,000

    4 7.00 12,000 18.3 219,000

    5 7.00 12,000 25.3 303,000

    6 8.00 12,000 33.3 399,000

    7 16.00 12,000 49.3 591,000

    8 16.00 12,000 65.3 783,000

    9 16.00 12,000 81.3 975,000

    10 16.00 12,000 97.3 1,167,000

    11 33.00 12,000 130.25 1,563,000

    12 35.00 12,000 165.25 1,983,000

    13 35.00 12,000 200.25 2,403,000

    14 35.00 12,000 235.25 2,823,000

    15 35.00 12,000 270.25 3,243,000

    16 35.00 12,000 305.25 3,663,000

    17 harvest #VALUE! #VALUE!

    18 #VALUE! #VALUE!

    19 #VALUE! #VALUE!

    BMP pond: weekly finfish feeding and estimated survival

  • 8/9/2019 B1 Data Entry Workbook - BMP Ponds

    10/15

    BMP pond: weekly finfish feeding and estimated survival

    Farmer name Agus Muhtiyanto Pond ID Number B1

    Please leave blank where not applicable

    Week

    Total weekly

    feed (kg) Feed cost (Rp/kg)

    Cumulative total

    feed (kg)

    Cumulative total

    feed cost (Rp)

    Estimated species 1

    survival (%) Comment

    1 0 0

    2 0 0

    3 0 0

    4 0 0

    5 0 0

    6 0 0

    7 0 0

    8 0 0

    9 0 0

    10 0 0

    11 0 0

    12 0 0

    13 0 0

    14 0 0

    15 0 0

    16 0 0

    17 0 0

    18 0 0

    19 0 0

    Week

    Total weekly

    feed (kg) Feed cost (Rp/kg)

    Cumulative total

    feed (kg)

    Cumulative total

    feed cost (Rp)

    Estimated species 2

    survival (%) Comment

    1 0 0

    Finfish species 1 name

    Finfish species 2 name

    BMP pond shrimp harvest

  • 8/9/2019 B1 Data Entry Workbook - BMP Ponds

    11/15

    Pond ID number

    BMP pond - shrimp harvest

    Farmer name Agus Muhtiyanto

    Shrimp

    7/13/2010Harvest date - 1st harvest

    Size count Total k

    Price /kg

    R 1000

    Shrimp sizes, harvested weights and income

    Income R 1000

    52.5 246 40.75

    10024.5

    0

    0

    Total income

    00

    10024.5

    BMP pond finfish harvest

  • 8/9/2019 B1 Data Entry Workbook - BMP Ponds

    12/15

    B1

    Finfish

    BMP pond - finfish harvest

    Pond ID number

    6/1/2010

    Species 1 sizes, harvested weights and income

    Species 1 (name) milkfish

    Harvest date - first harvest

    Size count Total (kg)

    Price /kg

    (Rp1000)7 15 9

    Income (Rp1000)135

    9 12 8

    10 5 8

    0

    96

    40

    Total income

    0

    271

    BMP pond - General harvest/post-harvest questions

  • 8/9/2019 B1 Data Entry Workbook - BMP Ponds

    13/15

    BMP pond General harvest/post harvest questions

    Farmer name Pond ID number B1

    Chemical and other input use Y/N If yes, please specify name Quantity (kg/crop) Cost

    Pesticides No

    Fertilisers No

    Lime No

    Probiotics No

    Other NoOther No

    Feeding strategies Y/N If yes, please specify name Quantity (kg/crop) Cost

    Pellets Yes Comfeed 315.25

    No

    Low-value fish No

    Other No

    Other No

    Other No

    400000

    Labour requirements

    Number of household members and hired personnel that worked on the 2010 shrimp crop - THIS POND ONLY

    Gender (M or F)

    Number of person-days/week

    spent on the shrimp operation

    5

    Household member(s)1

    2

    3

    4

    Agus Muhtiyanto

    Cost of maintaining ponds during the 2010 shrimp crop (Rp/crop)

    Homemade mixtures

    BMP pond: disease outbreak record - pond

  • 8/9/2019 B1 Data Entry Workbook - BMP Ponds

    14/15

    BMP pond: disease outbreak record - pond

    B1

    Sta

    Clinical signs

    Appearance

    Farmer name Pond ID number

    Date of investigationDate of first signs Date(s) of harvest/major crop loss

    Agus Muhtiyanto

    Other observation

    Behaviour

    Feeding

    Size of collected shrimp (g)

    Lar est

    Number collected

    Histo atholo

    Shrimple test result on typically affected shrimp

    Collections for laboratory examinations

    Number tested Number positive

    Other

    SmallestPCR test for WSSV

    BMP pond: disease outbreak record - laboratory

  • 8/9/2019 B1 Data Entry Workbook - BMP Ponds

    15/15

    BMP pond: disease outbreak record laboratory

    0

    Laboratory findings

    Laboratory name Date received

    Pond ID numberFarmer name Agus Muhtiyanto

    Record numbe

    Pool 1

    Pool 2

    Pool 3

    Pool 4

    Histopathology

    Result of nested PCR test for WSSV (+/-)

    Pool 5

    Pool 6

    Y/N Y/N

    Other test results

    WSSV-related disease

    HPV-related disease

    MBV-related disease

    Was there evidence of:

    HPV infection

    MBV infection

    WSSV infection

    Laboratory diagnostician (name):

    Conclusion