B LUE T EAM B LUE T EAM - W EB WORK AND TEAM PRESENTATION 2010 1.

31
BLUE TEAM - WEB WORK AND TEAM PRESENTATION 2010 1
  • date post

    19-Dec-2015
  • Category

    Documents

  • view

    219
  • download

    4

Transcript of B LUE T EAM B LUE T EAM - W EB WORK AND TEAM PRESENTATION 2010 1.

Page 1: B LUE T EAM B LUE T EAM - W EB WORK AND TEAM PRESENTATION 2010 1.

1

BLUE TEAM -

WEB WORK AND TEAM PRESENTATION

2010

Page 2: B LUE T EAM B LUE T EAM - W EB WORK AND TEAM PRESENTATION 2010 1.

2

CONTENT

Introduction – hydroasia topic

Team presentation

ArcGIS

MOUSE

Conclusion

Page 3: B LUE T EAM B LUE T EAM - W EB WORK AND TEAM PRESENTATION 2010 1.

3

INTRODUCTION - TOPIC

Study area: Incheon Gyo Watershed

Page 4: B LUE T EAM B LUE T EAM - W EB WORK AND TEAM PRESENTATION 2010 1.

4

INTRODUCTION - TOPIC

The city of Incheon in South Korea had a devastating flood in 1997 on the Incheon Gyo located near the Yellow Sea.

This area is influenced by tide level, inunda-tions occur.

Incheon Gyo has a gentle slope and lowland, inundation often occurs by rainfall.

Topic: we will analyze reduction of water level in this area by using ArcGIS and MOUSE.

Page 5: B LUE T EAM B LUE T EAM - W EB WORK AND TEAM PRESENTATION 2010 1.

TEAM PRESENTATION

Page 6: B LUE T EAM B LUE T EAM - W EB WORK AND TEAM PRESENTATION 2010 1.

6

THE TEAM

Page 7: B LUE T EAM B LUE T EAM - W EB WORK AND TEAM PRESENTATION 2010 1.

7

HAN HYEONG JUN THE LEADER

27 years old

Korean

Master in Civil and environmental engineering

University of Incheon, Korea

Page 8: B LUE T EAM B LUE T EAM - W EB WORK AND TEAM PRESENTATION 2010 1.

8

KOCH FRIEDRICH

26 years old

German

Master Euroaquae (Hydroinformatics and water management)

University of Technology Cottbus, Germany

Page 9: B LUE T EAM B LUE T EAM - W EB WORK AND TEAM PRESENTATION 2010 1.

9

QUARO GUILLAUME

22 years old

French

Master Hydroprotech (Hydrotechnological projects management)

Polytech’Nice, University of Nice-Sophia Antipolis, France

Page 10: B LUE T EAM B LUE T EAM - W EB WORK AND TEAM PRESENTATION 2010 1.

10

KWON YOUNG-BIN

Civil and environmental engineering

Korean

University of Incheon, Korea

Page 11: B LUE T EAM B LUE T EAM - W EB WORK AND TEAM PRESENTATION 2010 1.

11

ABE MASAHIRO

24 years old

Japanese

Hydrology and Civil Engineering

Kyoto University

Page 12: B LUE T EAM B LUE T EAM - W EB WORK AND TEAM PRESENTATION 2010 1.

12

CHATELUS MAXENCE

23 years old

French

Master Hydroprotech (Hydrotechnological projects management)

Polytech’Nice, University of Nice-Sophia Antipolis, France

Page 13: B LUE T EAM B LUE T EAM - W EB WORK AND TEAM PRESENTATION 2010 1.

13

LEE SO YOUNG

24 years old

Korean

Master in Civil and environmental engineering

University of Incheon, Korea

Page 14: B LUE T EAM B LUE T EAM - W EB WORK AND TEAM PRESENTATION 2010 1.

14

ZHANG DONGDONG

Chinese

Tianjin University, China

Page 15: B LUE T EAM B LUE T EAM - W EB WORK AND TEAM PRESENTATION 2010 1.

15

WORK DISTRIBUTION

Create and administrate the team website: Guillaume QUARO and Maxence CHATELUS

Write the weekly reports of advancement: Hyeongjun HAN, Soyoung LEE and Young-bin KWON

Make DEM by ArcGIS: Guillaume QUARO and Maxence CHATELUS

Hydrological studies: Young-bin KWON

Analyze through MOUSE: Hyeongjun HAN, Soyoung LEE and Young-bin KWON

Page 16: B LUE T EAM B LUE T EAM - W EB WORK AND TEAM PRESENTATION 2010 1.

16

ARCGIS

Page 17: B LUE T EAM B LUE T EAM - W EB WORK AND TEAM PRESENTATION 2010 1.

17

WHAT IS GIS?

GIS = Geographic Information System

Why are we using these GIS data?

To have a delimitation of the area, with the topography and the buildings, the roads…

To create a mesh for MOUSE software

Which software are we using?

ArcGIS (ArcMap) made by ESRI

Page 18: B LUE T EAM B LUE T EAM - W EB WORK AND TEAM PRESENTATION 2010 1.

18

DELIMITATION OF THE AREA

Clip tool: catchment file with roads, buildings and contour cut the features following the shape of the

catchment

+CLIP

Page 19: B LUE T EAM B LUE T EAM - W EB WORK AND TEAM PRESENTATION 2010 1.

19

CREATION OF A DEM

First step: to create a TIN (= Triangulated Irregular Network)

Tool : 3D analyst

Page 20: B LUE T EAM B LUE T EAM - W EB WORK AND TEAM PRESENTATION 2010 1.

20

CREATION OF A DEM

Creation of a DEM for each layer (contour, buildings and roads)

DEM = Digital Elevation Model

Tool : feature to raster

Page 21: B LUE T EAM B LUE T EAM - W EB WORK AND TEAM PRESENTATION 2010 1.

21

FROM DEM TO MESH FILE

Merge the 3 rasters in one

Convert the final raster in Ascii to use in MOUSE as a mesh

Page 22: B LUE T EAM B LUE T EAM - W EB WORK AND TEAM PRESENTATION 2010 1.

22

MOUSE

Page 23: B LUE T EAM B LUE T EAM - W EB WORK AND TEAM PRESENTATION 2010 1.

23

WHAT IS MOUSE?

MOUSE is a program which provides sewage pipe, open channel, surface runoff etc, flow simulation as well as hydraulic analysis.

Why are we using MOUSE program?

Analyze of reduction of water level in sewer pipe. Risk analysis of flood damage

What kind of software are we supposed to use?

MOUSE And MIKE View

Page 24: B LUE T EAM B LUE T EAM - W EB WORK AND TEAM PRESENTATION 2010 1.

24

SEWAGE PIPE NET BASED ON 1997’S DATA

Page 25: B LUE T EAM B LUE T EAM - W EB WORK AND TEAM PRESENTATION 2010 1.

25

CONDITION

Condition of Analysis : Critical Rainfall Duration

Rainfall Frequency : 80years

Page 26: B LUE T EAM B LUE T EAM - W EB WORK AND TEAM PRESENTATION 2010 1.

26

CONDITION

Decide Of Critical Rainfall Duration- 5min : 166.58 mm/hr

- 10min : 152.51 mm/hr

- 15min : 142.07 mm/hr

- 20min : 133.72 mm/hr - 30min : 120.79 mm/hr

- 40min : 110.00 mm/hr

- 50min : 103.19 mm/hr

- 60min : 96.74 mm/hr

<Probable Rainfall Intensity Formula Considering the Pattern Change of Maximum Rainfall at Incheon City>

Page 27: B LUE T EAM B LUE T EAM - W EB WORK AND TEAM PRESENTATION 2010 1.

27

CONDITION

Lowstream Boundary Condition : H.W.L (+)4.425

Page 28: B LUE T EAM B LUE T EAM - W EB WORK AND TEAM PRESENTATION 2010 1.

28

HOW TO CONTROL

Install of Rainwater Retaining Facility

Page 29: B LUE T EAM B LUE T EAM - W EB WORK AND TEAM PRESENTATION 2010 1.

29

EXPECTED RESULTS

Compared Result

Before

Before

After After

Before

After

Before

AfterWaterlevel

Peakflow

Page 30: B LUE T EAM B LUE T EAM - W EB WORK AND TEAM PRESENTATION 2010 1.

30

CONCLUSION

Next few days expectations:

Getting to know each others Put our informations and work in common Define the next steps in our work Define the new sub-team and people

responsabilities Completely finish the model and run all the

simulations

Page 31: B LUE T EAM B LUE T EAM - W EB WORK AND TEAM PRESENTATION 2010 1.

THANK YOU FOR YOUR ATTENTION!