AXO GO LOWER GROUND MEZ PARKING - Pam Golding

6
1 3 7 9 10 11 12 13 14 15 16 17 18 19 20 C B D 6 F A 8 2 M O Q S T W L N P R 21 22 I K H J U V G 4 5 RAMP DOWN TO P1 LOWER GROUND VISITORS PARKING PUBLIC AREA ON STREET LEVEL COUNCIL HV 30m² DOUBLE VOLUME 7.76 SERVITUDE BAKER STREET 7.91 SERVITUDE KEYES AVENUE LIFT LOBBY LG-V01 STAIR ENTRANCE TO PUBLIC AREA GUARDHOUSE LG-V01 LG-V02 LG-V03 LG-V04 LG-V05 LG-V06 LG-V07 LG-V08 LG-V09 LG-V10 LG-V11 LG-V12 LG-V14 LG-V13 LG-V15 LG-V16 LG-V17 LG-V18 LG-V19 LG-V20 LG-V21 LG-V22 LG-V23 LG-V24 LG-V26 LG-V25 LG-V27 LG-V28 LG-V29 LG-V30 LG-V31 LG-V32 LG-V33 LG-V34 LG-V35 LG-V36 LG-V37 LG-V38 LG-V39 LG-V40 LG-V41 LG-V42 SWIMMING POOL ALLOWANCE MAINTENANCE STORE 20m² MAINTENANCE STORE 20m² BOOMED LG PARKING ENTRANCE FROM BAKER STR PARKING OFFICE VALVE CHAMBER RETAIL POD RETAIL STORE 22m² RETAIL STORE 8m² LG - 01 LG - 03 LG - 04 LG - 02 LG - 08 LG - 07 LG - 06 LG - 05 GENERATOR 40m² Exhaust air extraction Hot Air Air Intake Louvered Door TENANT STOREOOMS LIFT LOBBY LG - 09 LG - 11 LG - 13 LG - 10 LG - 12 LG - 14 LG - 16 LG - 18 LG - 15 LG - 17 LG - 19 LG - 21 LG - 23 LG - 25 LG - 27 LG - 29 LG - 31 LG - 33 LG - 34 LG - 30 LG - 32 LG - 28 LG - 24 LG - 26 LG - 22 LG - 20 LG - 35 LG - 37 LG - 38 LG - 36 REFUSE ROOM 75m² TELE-COM + DATA SERVER 30m² ENTRANCE RAMP FROM BAKER ST UPPER MEZZAINE PARKING LEVEL AREA FOR POOL ABOVE RAMP DOWN TO P1 FOR DRAWN BY: DATE: DESCRIPTION KEY NOTE This drawing is the property of Paragon Architects (Pty) Ltd. and is intended for the use only on site and for the project to which it relates. Copyright in this drawing is owned by Paragon Architects (Pty) Ltd. All work is to be carried out in accordance with SANS 10400 and other relevant SANS Standards. This drawing is not to be scaled. Figured dimensions to be used. All dimensions are in millimeters unless otherwise stated. All levels and dimensions to be checked on site by the contractor before work is carried out and any discrepancies to be reported to the Architect. The contractor shall in all aspects of the works comply with the provisions of the Occupational Health and Safety Act, 1993 (Act No 85 of 1993) and any regulations promulgated in terms of that Act or the Factories Machinery and Building Works Act of 1941. This drawing must be read in conjunction with all the relevant drawings, schedules and specifications from the Architect and all other consultants related to the project. NOTES - - - - - - - PROJECT NUMBER INFO TENDER CONSTRUCTION REVISION STAGE / SERIES / SIZE COUNCIL COPYRIGHT NOTICE Copyright © – Paragon Architects (Pty) Ltd Copyright subsists in this drawing. The person or entity, whose name appears in the title block of this drawing, is hereby granted a non-exclusive license to use, display, print, and/or reproduce this drawing to the extent necessary to carry out and complete the project described in the title block of this drawing. This license in respect of the copyright is expressly limited as aforesaid and the person and/or entity referred to above shall not be entitled to grant sub- licenses in respect of the copyright in this drawing to any other entity. This license confers no ownership rights in the copyright vesting in the drawing and this drawing and the copyright subsisting therein will, at all times, remain the property of Paragon Architects (Pty) Ltd . Any unauthorized reproduction, publication, transmission, adaptation and/or inclusion of this drawing in a cinematograph film or television broadcast is an act of copyright infringement which will render the doer of the act liable for civil law copyright infringement and may in certain circumstances render the doer liable to criminal prosecution. Requests and enquiries concerning this drawing and the rights subsisting therein should be addressed to the copyright owner. ACTS OF PARLIAMENT All Contractors shall ensure that, before any work is put in hand, they comply with all the necessary Acts of Parliament of the Republic of South Africa. 1st Floor, 33 Fricker Road, Illovo Boulevard, Tel 011 482 3781, Fax 011 482 3784, [email protected] C:\Justin Brien_Temp\PA_X135_REDEFINE PARK CENTRAL_LOCALS\150124 PA_X135_REDEFINE PARK CENTRAL_BASEMENT & GROUND_JB.rvt 2015/02/04 10:47:00 AM SCALE: 1 : 200 G 2015/02/04 10:47:00 AM REDEFINE RA 2014/09/19 PARK CENTRAL _APARTMENTS LG PARKING LAYOUTS PORTION 1 OF LOT 225 CNR KEYES AVE & BAKER STR ROSEBANK PAX_135 D100-10-A1 SCALE: 1 : 200 G0 Lower Ground Level_Parking Layout AXO_GO LOWER GROUND MEZ PARKING REV DATE DRAWN DESCRIPTION A 141127 RA ISSUED FOR INFORMATION B 141208 JB BUILDING FOOTPRINT C 141211 RA ISSUED FOR INFORMATION D 150109 JB ISSUED FOR INFORMATION E 150123 DV INFORMATION FOR VALUATION F 150126 JB REVISED LAYOUTS G 150204 JB Revised Layouts

Transcript of AXO GO LOWER GROUND MEZ PARKING - Pam Golding

Page 1: AXO GO LOWER GROUND MEZ PARKING - Pam Golding

1 3 7 9 10 11 12 13 14 15 16 17 18 19 20

C

B

D

6

F

A

82

M

O

Q

S

T

W

L

N

P

R

21 22

I

K

H

J

U

V

G

4

5

RAMP DOWNTO P1

LOWERGROUNDVISITORSPARKING

PUBLIC AREA ON STREET LEVEL

COUNCIL HV

30m²

DOUBLE VOLUME

7.76 SERVITUDE

BAKER STREET

7.9

1 S

ER

VIT

UD

E

KEYES

AV

EN

UE

LIFTLOBBY

LG-V01

STAIR ENTRANCE

TO PUBLIC AREA

GUARDHOUSE

LG-V01LG-V02LG-V03LG-V04

LG-V05

LG-V06

LG-V07

LG-V08 LG-V09 LG-V10 LG-V11 LG-V12

LG-V14

LG-V13

LG-V15

LG-V16

LG-V17

LG-V18

LG-V19

LG-V20

LG-V21

LG-V22

LG-V23

LG-V24

LG-V26

LG-V25

LG-V27

LG-V28

LG-V29

LG-V30

LG-V31

LG-V32

LG-V33

LG-V34

LG-V35

LG-V36

LG-V37

LG-V38

LG-V39

LG-V40

LG-V41

LG-V42

SWIMMING POOL ALLOWANCE

MAINTENANCE STORE

20m²

MAINTENANCE STORE

20m²

BOOMEDLG PARKING ENTRANCE

FROM BAKER STR

PARKING

OFFICE

VALVE CHAMBER

RETAIL POD

RETAIL

STORE

22m²

RETAIL

STORE

8m²

LG - 01 LG - 03

LG - 04LG - 02

LG - 08 LG - 07 LG - 06 LG - 05

GENERATOR

40m²

Exhaust air

extraction

Hot A

ir

Air Intake

Louvered Door

TENANT STOREOOMS

LIFTLOBBY

LG - 09

LG - 11

LG - 13

LG - 10

LG - 12

LG - 14

LG - 16

LG - 18

LG - 15

LG - 17

LG - 19

LG - 21

LG - 23

LG - 25

LG - 27

LG - 29

LG - 31

LG - 33 LG - 34

LG - 30

LG - 32

LG - 28

LG - 24

LG - 26

LG - 22

LG - 20

LG - 35 LG - 37 LG - 38 LG - 36

REFUSE ROOM75m²

TELE-COM

+

DATA SERVER

30m²

ENTRANCE RAMPFROM

BAKER STUPPER MEZZAINEPARKING LEVEL

AREA FOR POOLABOVE

RAMP DOWN TO P1

FOR

DRAWN BY:DATE:

DESCRIPTIONKEY NOTE

This drawing is the property of Paragon Architects (Pty) Ltd. and isintended for the use only on site and for the project to which it relates.Copyright in this drawing is owned by Paragon Architects (Pty) Ltd.All work is to be carried out in accordance with SANS 10400 and otherrelevant SANS Standards.This drawing is not to be scaled. Figured dimensions to be used. Alldimensions are in millimeters unless otherwise stated.All levels and dimensions to be checked on site by the contractor beforework is carried out and any discrepancies to be reported to theArchitect.The contractor shall in all aspects of the works comply with theprovisions of the Occupational Health and Safety Act, 1993 (Act No 85of 1993) and any regulations promulgated in terms of that Act or theFactories Machinery and Building Works Act of 1941.This drawing must be read in conjunction with all the relevant drawings,schedules and specifications from the Architect and all otherconsultants related to the project.

NOTES

-

--

-

-

-

-

PROJECT NUMBER

INFO TENDER CONSTRUCTION

REVISIONSTAGE / SERIES / SIZE

COUNCIL

COPYRIGHT NOTICE

Copyright © – Paragon Architects (Pty) Ltd

Copyright subsists in this drawing. The person or entity, whose nameappears in the title block of this drawing, is hereby granted a non-exclusivelicense to use, display, print, and/or reproduce this drawing to the extentnecessary to carry out and complete the project described in the title blockof this drawing.

This license in respect of the copyright is expressly limited as aforesaid andthe person and/or entity referred to above shall not be entitled to grant sub-licenses in respect of the copyright in this drawing to any other entity.

This license confers no ownership rights in the copyright vesting in thedrawing and this drawing and the copyright subsisting therein will, at alltimes, remain the property of Paragon Architects (Pty) Ltd. Anyunauthorized reproduction, publication, transmission, adaptation and/orinclusion of this drawing in a cinematograph film or television broadcast isan act of copyright infringement which will render the doer of the act liablefor civil law copyright infringement and may in certain circumstancesrender the doer liable to criminal prosecution. Requests and enquiriesconcerning this drawing and the rights subsisting therein should beaddressed to the copyright owner.

ACTS OF PARLIAMENT

All Contractors shall ensure that, before any work is put in hand, theycomply with all the necessary Acts of Parliament of the Republic of SouthAfrica.

1st Floor, 33 Fricker Road, Illovo Boulevard, Tel 011 482 3781, Fax 011 482 3784, [email protected]

C:\

Just

in B

rien

_Tem

p\P

A_X

135_

RED

EFIN

E P

AR

K C

ENTR

AL_

LOC

ALS

\150

124

PA

_X13

5_R

EDEF

INE

PA

RK

CEN

TRA

L_B

AS

EMEN

T &

GR

OU

ND

_JB

.rvt

2015

/02/

04 1

0:47

:00

AM

SCALE: 1 : 200

G

2015/02/04 10:47:00

AM

REDEFINE

RA2014/09/19

PARK CENTRAL _APARTMENTS

LG PARKING LAYOUTS

PORTION 1 OF LOT 225CNR KEYES AVE & BAKER STRROSEBANK

PAX_135 D100-10-A1

SCALE: 1 : 200

G0 Lower Ground Level_Parking Layout

AXO_GO LOWER GROUND MEZ PARKING

REV DATE DRAWN DESCRIPTION

A 141127 RA ISSUED FOR INFORMATION

B 141208 JB BUILDING FOOTPRINT

C 141211 RA ISSUED FOR INFORMATION

D 150109 JB ISSUED FOR INFORMATION

E 150123 DV INFORMATION FOR VALUATION

F 150126 JB REVISED LAYOUTS

G 150204 JB Revised Layouts

Page 2: AXO GO LOWER GROUND MEZ PARKING - Pam Golding

1 3 7 9 10 11 12 13 14 15 16 17 18 19 20

C

B

D

6

F

A

82

M

O

Q

S

T

W

L

N

P

R

21 22

I

K

H

J

U

V

G

4

5

UPS 10m²

REFUSE ROOM30m²

P1 PARKING ENTRANCEFROM KEYES AVE

RAMP UPTO LOWER GROUND

PARKING

RAMP DOWNTO PARKING LEVEL 2

P1 PARKING

POD ON STREET LEVEL

POD ON STREET LEVEL

POD ON STREET LEVEL

P1 PARKING

7.76 SERVITUDE

BAKER STREET

7.9

1 S

ER

VIT

UD

E

KEYES

AV

EN

UE

MAIN LV33m²

LIFTLOBBY

LIFTLOBBY

RAMP DOWNTO PARKING LEVEL 2

GUARDHOUSE

P1-26

P1-25

P1-24

P1-23

P1-22

P1-21

P1-20

P1-19

P1-18

P1-17

P1-16

P1-15

P1-14

P1-13

P1-12

P1-11

P1-44

P1-45

P1-46

P1-47

P1-48

P1-49

P1-50

P1-51

P1-52

P1-41

P1-42

P1-43

P1-02

P1-01

P1-06 P1-05 P1-04

P1-35 P1-34P1-37 P1-36

P1-40

P1-39

P1-38

P1-03

P1-10

P1-09

P1-08

P1-31

P1-32

P1-33

P1-28P1-29P1-30 P1-27

P1-57

P1-55

P1-53

P1-58

P1-56

P1-54

P1-63

P1-61

P1-59

P1-64

P1-62

P1-60

P1-69

P1-67

P1-65

P1-70

P1-68

P1-66

P1-71P1-72

P1-75

P1-73P1-74

P1-76

P1-111

P1-113

P1-115

P1-85

P1-83

P1-81

P1-77

P1-91

P1-89

P1-87

P1-97

P1-95

P1-93

P1-103

P1-101

P1-99

P1-105

P1-109

P1-107

P1-117

P1-112

P1-114

P1-116

P1-86

P1-84

P1-80

P1-92

P1-90

P1-88

P1-98

P1-96

P1-94

P1-104

P1-102

P1-100

P1-106

P1-110

P1-108

P1-118

P1-07P1-79P1-82 P1-78

CONSUMER MV37m²

MAIN LV21m²

UPS12m²

LIFTLOBBY

P1 PARKING

P1 PARKING

RAMP DOWN TO P2

POD ON STREETLEVEL

RAMP DOWN TO P2

P1 ENTRANCE FROMKEYES AVE

FOR

DRAWN BY:DATE:

This drawing is the property of Paragon Architects (Pty) Ltd. and isintended for the use only on site and for the project to which it relates.Copyright in this drawing is owned by Paragon Architects (Pty) Ltd.All work is to be carried out in accordance with SANS 10400 and otherrelevant SANS Standards.This drawing is not to be scaled. Figured dimensions to be used. Alldimensions are in millimeters unless otherwise stated.All levels and dimensions to be checked on site by the contractor beforework is carried out and any discrepancies to be reported to theArchitect.The contractor shall in all aspects of the works comply with theprovisions of the Occupational Health and Safety Act, 1993 (Act No 85of 1993) and any regulations promulgated in terms of that Act or theFactories Machinery and Building Works Act of 1941.This drawing must be read in conjunction with all the relevant drawings,schedules and specifications from the Architect and all otherconsultants related to the project.

NOTES

-

--

-

-

-

-

PROJECT NUMBER

INFO TENDER CONSTRUCTION

REVISIONSTAGE / SERIES / SIZE

COUNCIL

COPYRIGHT NOTICE

Copyright © – Paragon Architects (Pty) Ltd

Copyright subsists in this drawing. The person or entity, whose nameappears in the title block of this drawing, is hereby granted a non-exclusivelicense to use, display, print, and/or reproduce this drawing to the extentnecessary to carry out and complete the project described in the title blockof this drawing.

This license in respect of the copyright is expressly limited as aforesaid andthe person and/or entity referred to above shall not be entitled to grant sub-licenses in respect of the copyright in this drawing to any other entity.

This license confers no ownership rights in the copyright vesting in thedrawing and this drawing and the copyright subsisting therein will, at alltimes, remain the property of Paragon Architects (Pty) Ltd. Anyunauthorized reproduction, publication, transmission, adaptation and/orinclusion of this drawing in a cinematograph film or television broadcast isan act of copyright infringement which will render the doer of the act liablefor civil law copyright infringement and may in certain circumstancesrender the doer liable to criminal prosecution. Requests and enquiriesconcerning this drawing and the rights subsisting therein should beaddressed to the copyright owner.

ACTS OF PARLIAMENT

All Contractors shall ensure that, before any work is put in hand, theycomply with all the necessary Acts of Parliament of the Republic of SouthAfrica.

1st Floor, 33 Fricker Road, Illovo Boulevard, Tel 011 482 3781, Fax 011 482 3784, [email protected]

C:\

Just

in B

rien

_Tem

p\P

A_X

135_

RED

EFIN

E P

AR

K C

ENTR

AL_

LOC

ALS

\150

124

PA

_X13

5_R

EDEF

INE

PA

RK

CEN

TRA

L_B

AS

EMEN

T &

GR

OU

ND

_JB

.rvt

2015

/02/

04 1

0:47

:23

AM

SCALE: 1 : 200

G

2015/02/04 10:47:23

AM

REDEFINE

RA2014/09/19

PARK CENTRAL _APARTMENTS

P1 PARKING LAYOUTS

PORTION 1 OF LOT 225CNR KEYES AVE & BAKER STRROSEBANK

PAX_135 D100-11-A1SCALE: 1 : 200

P1 Parking Level 01

AXO_P1 PARKING LEVEL 01

REV DATE DRAWN DESCRIPTION

A 141127 RA ISSUED FOR INFORMATION

B 141208 JB BUILDING FOOTPRINT

C 141211 RA ISSUED FOR INFORMATION

D 150109 JB ISSUED FOR INFORMATION

E 150123 DV INFORMATION FOR VALUATION

F 150126 JB REVISED LAYOUTS

G 150204 JB Revised Layouts

Page 3: AXO GO LOWER GROUND MEZ PARKING - Pam Golding

1 3 7 9 10 11 12 13 14 15 16 17 18 19 20

C

B

D

6

F

A

82

M

O

Q

S

T

W

L

N

P

R

21 22

I

K

H

J

U

V

G

4

5

RAMP UPTO PARKING LEVEL 1

RAMP DOWNTO PARKING LEVEL 3

P2 PARKING

P2 PARKING

LIFTLOBBY

LIFTLOBBY

RAMP DOWNTO PARKING LEVEL 3

TENANT STOREOOMS

TENANT STOREOOMS

TENANT STOREOOMS

P2-18

P2-19

P2-20

P2-21

P2-23

P2-25

P2-27

P2-29

P2-31

P2-33

P2-35

P2-37

P2-39

P2-41

P2-43

P2-45

P2-28

P2-30

P2-32

P2-34

P2-36

P2-38

P2-40

P2-42

P2-44

P2-22

P2-24

P2-26

P2-78

P2-79

P2-74 P2-75 P2-76

P2-06 P2-07P2-04 P2-05

P2-01

P2-02

P2-03

P2-77

P2-70

P2-71

P2-72

P2-16P2-15P2-14 P2-17

P2-50

P2-48

P2-46

P2-51

P2-49

P2-47

P2-56

P2-54

P2-52

P2-57

P2-55

P2-53

P2-62

P2-60

P2-58

P2-63

P2-61

P2-59

P2-64P2-65

P2-68

P2-66P2-67

P2-69

P2-83

P2-82

P2-81

P2-80

P2-88

P2-86

P2-84

P2-94

P2-92

P2-90

P2-100

P2-98

P2-96

P2-89

P2-87

P2-85

P2-95

P2-93

P2-91

P2-101

P2-99

P2-97

P2-73

P2-106

P2-104

P2-102

P2-107

P2-105

P2-103

P2-112

P2-110

P2-108

P2-113

P2-111

P2-109

P2-114P2-115

P2-124

P2-123

P2-125

P2-127

P2-126

P2-128

P2-130

P2-129

P2-131

P2-136

P2-134

P2-138

P2-143

P2-142

P2-10

P2-140

P2-09

P2-08

P2-132

P2-133

P2-137

P2-135

P2-139

P2-141

P2-11 P2-12 P2-13

P2-119 P2-116

P2-121

P2-122

P2-120

P2-117

P2-118

LIFTLOBBY

LIFTLOBBY

LIFTLOBBY

LIFTLOBBY

LIFTLOBBY

P2 PARKING

P2 PARKING

RAMP DOWN TO P3

RAMP DOWN TO P3

P2 PARKING

FOR

DRAWN BY:DATE:

This drawing is the property of Paragon Architects PTY. LTD. and isintended for the use only on site and for the project to which it relates.Copyright in this drawing is owned by Paragon Architects PTY. LTD.All work is to be carried out in accordance with SANS 10400 and otherrelevant SANS Standards.This drawing is not to be scaled. Figured dimensions to be used. Alldimensions are in millimeters unless otherwise stated.All levels and dimensions to be checked on site by the contractor beforework is carried out and any discrepancies to be reported to the Architect.The contractor shall in all aspects of the works comply with theprovisions of the Occupational Health and Safety Act, 1993 (Act No 85of 1993) and any regulations promulgated in terms of that Act or theFactories Machinery and Building Works Act of 1941.This drawing must be read in conjunction with all the relevant drawings,schedules and specifications from the Architect and all other consultantsrelated to the project.

NOTES

-

--

-

-

-

-

PROJECT

INFO TENDER CONSTRUCTION

REVISIONSTAGE / SERIES / SIZE

COUNCIL

COPYRIGHT NOTICE

Copyright © – Paragon Architects (Pty) Ltd

Copyright subsists in this drawing. The person or entity, whose nameappears in the title block of this drawing, is hereby granted a non-exclusivelicense to use, display, print, and/or reproduce this drawing to the extentnecessary to carry out and complete the project described in the title blockof this drawing.

This license in respect of the copyright is expressly limited as aforesaid andthe person and/or entity referred to above shall not be entitled to grant sub-licenses in respect of the copyright in this drawing to any other entity.

This license confers no ownership rights in the copyright vesting in thedrawing and this drawing and the copyright subsisting therein will, at alltimes, remain the property of Paragon Architects (Pty) Ltd. Anyunauthorized reproduction, publication, transmission, adaptation and/orinclusion of this drawing in a cinematograph film or television broadcast isan act of copyright infringement which will render the doer of the act liablefor civil law copyright infringement and may in certain circumstancesrender the doer liable to criminal prosecution. Requests and enquiriesconcerning this drawing and the rights subsisting therein should beaddressed to the copyright owner.

ACTS OF PARLIAMENT

All Contractors shall ensure that, before any work is put in hand, theycomply with all the necessary Acts of Parliament of the Republic of SouthAfrica.

1st Floor, 33 Fricker Road, Illovo Boulevard, Tel 011 482 3781, Fax 011 482 3784, [email protected]

C:\

Just

in B

rien

_Tem

p\P

A_X

135_

RED

EFIN

E P

AR

K C

ENTR

AL_

LOC

ALS

\150

124

PA

_X13

5_R

EDEF

INE

PA

RK

CEN

TRA

L_B

AS

EMEN

T &

GR

OU

ND

_JB

.rvt

2015

/02/

04 1

0:47

:47

AM

SCALE: 1 : 200

G

2015/02/04 10:47:47

AM

REDEFINE

Author2014/09/19

PARK CENTRAL _APARTMENTS

P2 PARKING LAYOUTS

PORTION 1 OF LOT 225CNR KEYES AVE & BAKER STRROSEBANK

PAX_135 D100-12-A1SCALE: 1 : 200

P2 Parking Level 02

AXO_P2 PARKING LEVEL 02

REV DATE DRAWN DESCRIPTION

A 141127 RA ISSUED FOR INFORMATION

B 141208 JB BUILDING FOOTPRINT

C 141211 RA ISSUED FOR INFORMATION

D 150109 JB ISSUED FOR INFORMATION

E 150123 DV INFORMATION FOR VALUATION

F 150126 JB REVISED LAYOUTS

G 150204 JB Revised Layouts

Page 4: AXO GO LOWER GROUND MEZ PARKING - Pam Golding

1 3 7 9 10 11 12 13 14 15 16 17 18 19 20

C

B

D

6

F

A

82

M

O

Q

S

T

W

L

N

P

R

21 22

I

K

H

J

U

V

G

4

5

P3-18

P3-19

P3-20

P3-21

P3-23

P3-25

P3-27

P3-29

P3-31

P3-33

P3-35

P3-37

P3-39

P3-41

P3-43

P3-45

P3-28

P3-30

P3-32

P3-34

P3-36

P3-38

P3-40

P3-42

P3-44

P3-22

P3-24

P3-26

P3-78

P3-79

P3-74 P3-75 P3-76

P3-06 P3-07P3-04 P3-05

P3-01

P3-02

P3-03

P3-77

P3-70

P3-71

P3-72

P3-16P3-15P3-14 P3-17

P3-50

P3-48

P3-46

P3-51

P3-49

P3-47

P3-56

P3-54

P3-52

P3-57

P3-55

P3-53

P3-62

P3-60

P3-58

P3-63

P3-61

P3-59

P3-64P3-65

P3-68

P3-66P3-67

P3-69

P3-73

P3-124

P3-123

P3-125

P3-127

P3-126

P3-128

P3-130

P3-129

P3-131

P3-136

P3-134

P3-138

P3-143

P3-142

P3-10

P3-140

P3-09

P3-08

P3-132

P3-133

P3-137

P3-135

P3-139

P3-141

P3-11 P3-12 P3-13

P3-119 P3-116

P3-121

P3-122

P3-120

P3-117

P3-118

RAMP UPTO PARKING LEVEL 2

RAMP DOWNTO PARKING LEVEL 4

P3 PARKING

P3 PARKING

LIFTLOBBY

LIFTLOBBY

RAMP DOWNTO PARKING LEVEL 4

TENANT STOREOOMS

TENANT STOREOOMS

P3-83

P3-82

P3-81

P3-80

P3-88

P3-86

P3-84

P3-94

P3-92

P3-90

P3-100

P3-98

P3-96

P3-89

P3-87

P3-85

P3-95

P3-93

P3-91

P3-101

P3-99

P3-97

P3-106

P3-104

P3-102

P3-107

P3-105

P3-103

P3-112

P3-110

P3-108

P3-113

P3-111

P3-109

P3-114P3-115

LIFTLOBBY

LIFTLOBBY

P3 PARKING

P3 PARKING

RAMP DOWN TO P3RAMP DOWN TO P4

P3 PARKING

FOR

DRAWN BY:DATE:

This drawing is the property of Paragon Architects PTY. LTD. and isintended for the use only on site and for the project to which it relates.Copyright in this drawing is owned by Paragon Architects PTY. LTD.All work is to be carried out in accordance with SANS 10400 and otherrelevant SANS Standards.This drawing is not to be scaled. Figured dimensions to be used. Alldimensions are in millimeters unless otherwise stated.All levels and dimensions to be checked on site by the contractor beforework is carried out and any discrepancies to be reported to the Architect.The contractor shall in all aspects of the works comply with theprovisions of the Occupational Health and Safety Act, 1993 (Act No 85of 1993) and any regulations promulgated in terms of that Act or theFactories Machinery and Building Works Act of 1941.This drawing must be read in conjunction with all the relevant drawings,schedules and specifications from the Architect and all other consultantsrelated to the project.

NOTES

-

--

-

-

-

-

PROJECT

INFO TENDER CONSTRUCTION

REVISIONSTAGE / SERIES / SIZE

COUNCIL

COPYRIGHT NOTICE

Copyright © – Paragon Architects (Pty) Ltd

Copyright subsists in this drawing. The person or entity, whose nameappears in the title block of this drawing, is hereby granted a non-exclusivelicense to use, display, print, and/or reproduce this drawing to the extentnecessary to carry out and complete the project described in the title blockof this drawing.

This license in respect of the copyright is expressly limited as aforesaid andthe person and/or entity referred to above shall not be entitled to grant sub-licenses in respect of the copyright in this drawing to any other entity.

This license confers no ownership rights in the copyright vesting in thedrawing and this drawing and the copyright subsisting therein will, at alltimes, remain the property of Paragon Architects (Pty) Ltd. Anyunauthorized reproduction, publication, transmission, adaptation and/orinclusion of this drawing in a cinematograph film or television broadcast isan act of copyright infringement which will render the doer of the act liablefor civil law copyright infringement and may in certain circumstancesrender the doer liable to criminal prosecution. Requests and enquiriesconcerning this drawing and the rights subsisting therein should beaddressed to the copyright owner.

ACTS OF PARLIAMENT

All Contractors shall ensure that, before any work is put in hand, theycomply with all the necessary Acts of Parliament of the Republic of SouthAfrica.

1st Floor, 33 Fricker Road, Illovo Boulevard, Tel 011 482 3781, Fax 011 482 3784, [email protected]

C:\

Just

in B

rien

_Tem

p\P

A_X

135_

RED

EFIN

E P

AR

K C

ENTR

AL_

LOC

ALS

\150

124

PA

_X13

5_R

EDEF

INE

PA

RK

CEN

TRA

L_B

AS

EMEN

T &

GR

OU

ND

_JB

.rvt

2015

/02/

04 1

0:48

:09

AM

SCALE: 1 : 200

G

2015/02/04 10:48:09

AM

REDEFINE

Author2014/09/19

PARK CENTRAL _APARTMENTS

P3 PARKING LAYOUTS

PORTION 1 OF LOT 225CNR KEYES AVE & BAKER STRROSEBANK

PAX_135 D100-13-A1

SCALE: 1 : 200

P3 Parking Level 03

AXO_P3 PARKING LEVEL 03

REV DATE DRAWN DESCRIPTION

A 141127 RA ISSUED FOR INFORMATION

B 141208 JB BUILDING FOOTPRINT

C 141211 RA ISSUED FOR INFORMATION

D 150109 JB ISSUED FOR INFORMATION

E 150123 DV INFORMATION FOR VALUATION

F 150126 JB REVISED LAYOUTS

G 150204 JB Revised Layouts

Page 5: AXO GO LOWER GROUND MEZ PARKING - Pam Golding

1 3 7 9 10 11 12 13 14 15 16 17 18 19 20

C

B

D

6

F

A

82

M

O

Q

S

T

W

L

N

P

R

21 22

I

K

H

J

U

V

G

4

5

RAMP UPTO PARKING LEVEL 3

RAMP DOWNTO PARKING LEVEL 4 LOWER LEVEL

P4 PARKING

P4 PARKING

LIFTLOBBY

LIFTLOBBY

LIFTLOBBY

LIFTLOBBY

P4-18

P4-19

P4-20

P4-21

P4-23

P4-25

P4-27

P4-29

P4-31

P4-33

P4-35

P4-37

P4-39

P4-41

P4-43

P4-45

P4-28

P4-30

P4-32

P4-34

P4-36

P4-38

P4-40

P4-42

P4-44

P4-22

P4-24

P4-26

P4-78

P4-79

P4-74 P4-75 P4-76

P4-06P4-04 P4-05

P4-01

P4-02

P4-03

P4-77

P4-71

P4-72

P4-16P4-15P4-14 P4-17

P4-73

P4-124

P4-123

P4-125

P4-127

P4-126

P4-128

P4-130

P4-129

P4-131

P4-136

P4-134

P4-138

P4-140

P4-132

P4-133

P4-137

P4-135

P4-139

P4-141

P4-11 P4-12 P4-13

P4-119 P4-116

P4-121

P4-122

P4-120

P4-117

P4-118

P4-83

P4-82

P4-81

P4-80

P4-88

P4-86

P4-84

P4-94

P4-92

P4-90

P4-100

P4-98

P4-96

P4-89

P4-87

P4-85

P4-95

P4-93

P4-91

P4-101

P4-99

P4-97

P4-106

P4-104

P4-102

P4-107

P4-105

P4-103

P4-112

P4-110

P4-108

P4-113

P4-111

P4-109

P4-114P4-115

P4-70

P4-50

P4-48

P4-46

P4-51

P4-49

P4-47

P4-56

P4-54

P4-52

P4-57

P4-55

P4-53

P4-62

P4-60

P4-58

P4-63

P4-61

P4-59

P4-64P4-65

P4-68

P4-66P4-67

P4-69

P4-142

P4-143

P4-10

P4-09

P4-08

P4-07

P4 PARKING

P4 PARKINGRAMP DOWN TO P5

RAMP DOWN TO P5

P4 PARKING

FOR

DRAWN BY:DATE:

This drawing is the property of Paragon Architects (Pty) Ltd. and isintended for the use only on site and for the project to which it relates.Copyright in this drawing is owned by Paragon Architects (Pty) Ltd.All work is to be carried out in accordance with SANS 10400 and otherrelevant SANS Standards.This drawing is not to be scaled. Figured dimensions to be used. Alldimensions are in millimeters unless otherwise stated.All levels and dimensions to be checked on site by the contractor beforework is carried out and any discrepancies to be reported to theArchitect.The contractor shall in all aspects of the works comply with theprovisions of the Occupational Health and Safety Act, 1993 (Act No 85of 1993) and any regulations promulgated in terms of that Act or theFactories Machinery and Building Works Act of 1941.This drawing must be read in conjunction with all the relevant drawings,schedules and specifications from the Architect and all otherconsultants related to the project.

NOTES

-

--

-

-

-

-

PROJECT NUMBER

INFO TENDER CONSTRUCTION

REVISIONSTAGE / SERIES / SIZE

COUNCIL

COPYRIGHT NOTICE

Copyright © – Paragon Architects (Pty) Ltd

Copyright subsists in this drawing. The person or entity, whose nameappears in the title block of this drawing, is hereby granted a non-exclusivelicense to use, display, print, and/or reproduce this drawing to the extentnecessary to carry out and complete the project described in the title blockof this drawing.

This license in respect of the copyright is expressly limited as aforesaid andthe person and/or entity referred to above shall not be entitled to grant sub-licenses in respect of the copyright in this drawing to any other entity.

This license confers no ownership rights in the copyright vesting in thedrawing and this drawing and the copyright subsisting therein will, at alltimes, remain the property of Paragon Architects (Pty) Ltd. Anyunauthorized reproduction, publication, transmission, adaptation and/orinclusion of this drawing in a cinematograph film or television broadcast isan act of copyright infringement which will render the doer of the act liablefor civil law copyright infringement and may in certain circumstancesrender the doer liable to criminal prosecution. Requests and enquiriesconcerning this drawing and the rights subsisting therein should beaddressed to the copyright owner.

ACTS OF PARLIAMENT

All Contractors shall ensure that, before any work is put in hand, theycomply with all the necessary Acts of Parliament of the Republic of SouthAfrica.

1st Floor, 33 Fricker Road, Illovo Boulevard, Tel 011 482 3781, Fax 011 482 3784, [email protected]

C:\

Just

in B

rien

_Tem

p\P

A_X

135_

RED

EFIN

E P

AR

K C

ENTR

AL_

LOC

ALS

\150

124

PA

_X13

5_R

EDEF

INE

PA

RK

CEN

TRA

L_B

AS

EMEN

T &

GR

OU

ND

_JB

.rvt

2015

/02/

04 1

0:48

:51

AM

SCALE: 1 : 200

C

2015/02/04 10:48:51

AM

REDEFINE

Author2014/09/19

PARK CENTRAL _APARTMENTS

P4 PARKING LAYOUT

PORTION 1 OF LOT 225CNR KEYES AVE & BAKER STRROSEBANK

PAX_135 D100-14-A1SCALE: 1 : 200

P4 Parking Level 04

SCALE:

AXO_P4 PARKING LEVEL 04

REV DATE DRAWN DESCRIPTION

A 150123 DV INFORMATION FOR VALUATION

B 150126 JB REVISED LAYOUTS

C 150204 JB Revised Layouts

Page 6: AXO GO LOWER GROUND MEZ PARKING - Pam Golding

P5 PARKING

P5 PARKING

FINAL PARKINGRAMPFINAL PARKING

RAMP

1 3 7 9 10 11 12 13 14 15 16 17 18 19 20

C

B

D

6

F

A

82

M

O

Q

S

T

W

L

N

P

R

21 22

I

K

H

J

U

V

G

4

5

RAMP UPTO PARKING LEVEL 4

FINAL PARKINGRAMP

P5 PARKING

LIFTLOBBY

LIFTLOBBY

LIFTLOBBY LIFT

LOBBY

P5-15

P5-16

P5-17

P5-18

P5-20

P5-22

P5-24

P5-26

P5-28

P5-30

P5-32

P5-34

P5-25

P5-27

P5-29

P5-31

P5-33

P5-35

P5-37

P5-39

P5-41

P5-19

P5-21

P5-23

P5-44

P5-43

P5-13P5-12P5-11 P5-14

P5-91

P5-90

P5-92

P5-94

P5-93

P5-95

P5-97

P5-96

P5-98

P5-103

P5-101

P5-105

P5-110

P5-109

P5-111

P5-107

P5-99

P5-100

P5-104

P5-102

P5-106

P5-108

P5-08 P5-09 P5-10

P5-88

P5-89

P5-87

P5-85

P5-86

P5-72

P5-71

P5-70

P5-77

P5-75

P5-73

P5-83

P5-81

P5-79

P5-78

P5-76

P5-74

P5-84

P5-82

P5-80

P5-45

P5-51

P5-49

P5-47

P5-50

P5-48

P5-46

P5-57

P5-55

P5-53

P5-56

P5-54

P5-52

P5-63

P5-61

P5-59

P5-62

P5-60

P5-58

P5-65P5-64

P5-69

P5-67P5-66

P5-68

P5-06 P5-07P5-04 P5-05

P5-01

P5-02

P5-03

P5-36

P5-38

P5-40

P5-42

RAMP UPTO PARKING LEVEL 4

FINAL PARKINGRAMP

WATER STORAGE&

PUMP ROOM280m²

HOT WAERGENERATION PLANT

150m²

P5-113

P5-112

PROPOSED VENTILATIONAND MUNICPLE GAS SHAFT

FOR

DRAWN BY:DATE:

This drawing is the property of Paragon Architects (Pty) Ltd. and isintended for the use only on site and for the project to which it relates.Copyright in this drawing is owned by Paragon Architects (Pty) Ltd.All work is to be carried out in accordance with SANS 10400 and otherrelevant SANS Standards.This drawing is not to be scaled. Figured dimensions to be used. Alldimensions are in millimeters unless otherwise stated.All levels and dimensions to be checked on site by the contractor beforework is carried out and any discrepancies to be reported to theArchitect.The contractor shall in all aspects of the works comply with theprovisions of the Occupational Health and Safety Act, 1993 (Act No 85of 1993) and any regulations promulgated in terms of that Act or theFactories Machinery and Building Works Act of 1941.This drawing must be read in conjunction with all the relevant drawings,schedules and specifications from the Architect and all otherconsultants related to the project.

NOTES

-

--

-

-

-

-

PROJECT NUMBER

INFO TENDER CONSTRUCTION

REVISIONSTAGE / SERIES / SIZE

COUNCIL

COPYRIGHT NOTICE

Copyright © – Paragon Architects (Pty) Ltd

Copyright subsists in this drawing. The person or entity, whose nameappears in the title block of this drawing, is hereby granted a non-exclusivelicense to use, display, print, and/or reproduce this drawing to the extentnecessary to carry out and complete the project described in the title blockof this drawing.

This license in respect of the copyright is expressly limited as aforesaid andthe person and/or entity referred to above shall not be entitled to grant sub-licenses in respect of the copyright in this drawing to any other entity.

This license confers no ownership rights in the copyright vesting in thedrawing and this drawing and the copyright subsisting therein will, at alltimes, remain the property of Paragon Architects (Pty) Ltd. Anyunauthorized reproduction, publication, transmission, adaptation and/orinclusion of this drawing in a cinematograph film or television broadcast isan act of copyright infringement which will render the doer of the act liablefor civil law copyright infringement and may in certain circumstancesrender the doer liable to criminal prosecution. Requests and enquiriesconcerning this drawing and the rights subsisting therein should beaddressed to the copyright owner.

ACTS OF PARLIAMENT

All Contractors shall ensure that, before any work is put in hand, theycomply with all the necessary Acts of Parliament of the Republic of SouthAfrica.

1st Floor, 33 Fricker Road, Illovo Boulevard, Tel 011 482 3781, Fax 011 482 3784, [email protected]

C:\

Just

in B

rien

_Tem

p\P

A_X

135_

RED

EFIN

E P

AR

K C

ENTR

AL_

LOC

ALS

\150

124

PA

_X13

5_R

EDEF

INE

PA

RK

CEN

TRA

L_B

AS

EMEN

T &

GR

OU

ND

_JB

.rvt

2015

/02/

04 0

2:04

:48

PM

SCALE: 1 : 200

C

2015/02/04 02:04:48

PM

REDEFINE

Author2014/09/19

PARK CENTRAL _APARTMENTS

P5 PARKING LAYOUT

PORTION 1 OF LOT 225CNR KEYES AVE & BAKER STRROSEBANK

PAX_135 D100-15-A1

SCALE:

AXO_P5 PARKING LEVEL 05

SCALE: 1 : 200

P5 Parking Level 05

REV DATE DRAWN DESCRIPTION

A 150123 DV INFORMATION FOR VALUATION

B 150126 JB REVISED LAYOUTS

C 150204 JB Revised Layouts