OPTIMIZATION OF PUMPING FRESH WATER
THROUGH LONG ROUTE
Here in this case we will apply the geometric programming for optimizing the cost of
pump station and optimizing the variable design such as drop pressure and the suitablediameter and the proper length for each division along the pipe line .
There are another several variables could be optimized for this case study, but forsimplification and in the aim of showing the geometric programming technique in
optimization they are neglected.
A water pipeline tends to be extended 4!m across a desert from a water table at
AlDisseh areasouth of H."#, to Amman city through the long route using several pumps
along the 4"m.
The pipeline, as shown schematically in figure $%& conveys 0.2 m3sof water.
The first costs of pipeline are '
!"s# "$ ea%h &'m& ()0000*0.00032 +P,.2-Ds
!"s# "$ /00 m "$ &i&e( ,/0 E01 D ,.)-Ds
Where +P ( &ress're r"& i4 ea%h &i&e se%#i"4 5Pa
D ( iame#er "$ &i&e5 m
Ass'me a $ri%#i"4 $a%#"r "$ 0.02 $"r %"mmer%ial lar6e iame#er '%#ile &i&es
(se geometric programming on a constrained ob)ective function to select the number of
pumps and the pipe diameter that results in the minimum total first cost for the system.
Fi6're , S%hema#i% ia6ram "$ &'m&i46 r"'#e
Pr"%e're
,7 8e 8ill a&&l9 #he 6e"me#ri% &r"6rammi46 $"r "imi:i46 #his %ase7
-
8/12/2019 Awater Pipeline Extends 30km Across Adesert From Adesa
2/4
*f4designates the number of pump +and +pipe sections, the total cost is
Y= n (50000+0.00032 P 1.2+ 140 E06 D 1.5)
And '
n= 400,000/L-here is the length of each pipe section in meters .the pressure drop in each pipe
section is'
The statement of the problem is
/inimize the ob)ective function'
Y= (400,000/L) (50000+0.00032 P 1.2+ 140 E06 D 1.5)
0ub)ect to
&r";ie #ha#
L: -w1 w2 - Mw4=0
p: 1.2w2 + Mw4=0
D : 1.5w3+5 Mw4=0
w1 + w2+w3 =1
5Mw4=M
-
8/12/2019 Awater Pipeline Extends 30km Across Adesert From Adesa
3/4
Using Matlab s!t"a#$ sl%ing t&$ !i%$ $'atins t !in t&$ !i%$ n*n"ns
"1=0.035 "2= 0.1-23 "3= 0.6-2 M= 0.230 M"4 = 0.230
-