Award 10

6
M.P.POORVA KSHTRA VIDYUT VITARAN CO. LTD. NO. EE/STC/BILL BINA, DATED To, M/S DINESH KUMAR PARASHAR SUB CONSTRUCTION OF 11 KV/ LT LINE THROUGH LAVOUR CONTRACT REF LITTER FROM A.E. STC BINA DATED Dear Sir, (I) 11 kv LINE 0.16 Km (ii) 0.9 Km (ii) LT Line 0.03 Km (ii) 0.00 Km (iii) S/S 1X25 Kva (ii) 1X25 Kva (i) Name of Work Estt for PS to 1x3 Hp Pump connection at village Kokalwara Under Khura (ii) Name of Work Estt for PS to 2x6 Hp Pump connection at village BAGHORA Under Khurai (i) Estt No. and dt 78-168-5542-14-458 Date 21.10.2014 (ii) Estt No. and dt 78-168-5542-14-461 Date 25.10.2014 (i) Work Order No. and Date 467 1.11.2014 (STC) 696 Dt. 11.11.2014 (ii) Work Order No. and Date 470 1.11.2014 (STC) 699 Dt. 11.11.2014 (i) Amount Rs. 139110.00 (ii) Rs. 290303.00 Employee Name _ RAJKUMAR NAMDEO LH S.No. Particulars of Works ot be carried Unit Rate Qty 1 Qty 2 1 Pole pit digging for P.C.c. Pole/ R.S. Joint (a) Normal Soil Per pit 126 4 8 504 1008 (b) Hard soil Per pit 303 2 6 606 1818 2 Transportation of P.C.C. Pole 0 0 0 0 (a) 0 to 1 Km Pe pole 91 6 14 546 1274 (b) to Km @21/- Per km Pe pole 42 6 14 252 588 © Transporation of RS Joist Per Pol 79 0 0 0 0 3 Stay pit digging (4x2x3x2) 0 0 0 0 (A) Normal Soil Per Sta 96 2 2 192 192 (b) Soft Rock Per Sta 152 3 4 456 608 4 Stay errection complete with binding of stay Per Sta 0 0 0 0 (a) Labour charge for stay errection Per Sta 107 5 6 535 642 (b) Cost of stay concreting (0.2 cmt) Per Sta 788 5 6 3940 4728 © Labour charge for stay concreting Per Sta 63 5 6 315 378 5 Pole errection including earthing and back filling Per Loc 406 6 14 2436 5684 6 Errection of 175x85 mm R.S. Joist Per Pol 312 0 0 0 0 6 Concerting of PCC Pole @ 3 cmt per clamp Per Loc 1181 0 0 0 0 Labour charges for conreting Per Loc 105 0 0 0 0 7 Fixing of 11 Ky VX Arms with top clmap Per Loc 42 3 12 126 504 8 fixing of LT x arm/ though bolt u clmap with insul Per Loc 35 2 0 70 0 9 11 KV pin insulator fixin with G.I. Pin No. 9 9 36 81 324 10 (a) Striging of rabbit conductor complete Per Km 1816 0.48 2.7 871.68 4903.2 Pe Km 3631 0.03 0 108.93 0 11 Carpet guarding with lacing in 11 Kv line Per Spa 781 0 0 0 0 With reference to above, we have pleasre in awarding a labour contract to your for the following works at the rate mentioned agaist each construction acitivities on the terms and condition Amount 1 Qmount 2 (b) Striging of L.T. Line with 6 sq 4 mm PVC cable

description

nitinagnihotri@

Transcript of Award 10

Sheet1M.P.POORVA KSHTRA VIDYUT VITARAN CO. LTD.NO. EE/STC/BILLBINA, DATEDTo,M/S DINESH KUMAR PARASHARSUBCONSTRUCTION OF 11 KV/ LT LINE THROUGH LAVOUR CONTRACTREFLITTER FROM A.E. STC BINA DATEDDear Sir,With reference to above, we have pleasre in awarding a labour contract to your for the following works at the rate mentioned agaist each construction acitivities on the terms and condition indicated in enclosed annexure.(I) 11 kv LINE 0.16 Km (ii) 0.9 Km(ii) LT Line 0.03 Km (ii) 0.00 Km(iii) S/S 1X25 Kva (ii) 1X25 Kva(i) Name of Work Estt for PS to 1x3 Hp Pump connection at village Kokalwara Under Khurai RDC(ii) Name of Work Estt for PS to 2x6 Hp Pump connection at village BAGHORA Under Khurai RDC(i) Estt No. and dt 78-168-5542-14-458 Date 21.10.2014(ii) Estt No. and dt 78-168-5542-14-461 Date 25.10.2014(i) Work Order No. and Date 467 1.11.2014 (STC) 696 Dt. 11.11.2014(ii) Work Order No. and Date 470 1.11.2014 (STC) 699 Dt. 11.11.2014(i) Amount Rs. 139110.00 (ii) Rs. 290303.00 Employee Name _ RAJKUMAR NAMDEO LHS.No.Particulars of Works ot be carriedUnitRateQty 1Qty 2Amount 1Qmount 2Grand Total Amount1Pole pit digging for P.C.c. Pole/ R.S. Joint(a) Normal SoilPer pit1264850410081512(b) Hard soilPer pit30326606181824242Transportation of P.C.C. Pole00000(a) 0 to 1 KmPe pole9161454612741820(b) to Km @21/- Per kmPe pole42614252588840 Transporation of RS JoistPer Pole79000003Stay pit digging (4x2x3x2)00000(A) Normal SoilPer Stay9622192192384(b) Soft RockPer Stay1523445660810644Stay errection complete with binding of stayPer Stay00000(a) Labour charge for stay errectionPer Stay107565356421177(b) Cost of stay concreting (0.2 cmt)Per Stay78856394047288668 Labour charge for stay concretingPer Stay63563153786935Pole errection including earthing and back filling with boulderPer Loc4066142436568481206Errection of 175x85 mm R.S. JoistPer Pole312000006Concerting of PCC Pole @ 3 cmt per clampPer Loc118100000Labour charges for conretingPer Loc105000007Fixing of 11 Ky VX Arms with top clmapPer Loc423121265046308fixing of LT x arm/ though bolt u clmap with insulatorPer Loc352070070911 KV pin insulator fixin with G.I. PinNo.99368132440510(a) Striging of rabbit conductor completePer Km18160.482.7871.684903.25774.88(b) Striging of L.T. Line with 6 sq 4 mm PVC cablePe Km36310.030108.930108.9311Carpet guarding with lacing in 11 Kv linePer Span7810000012DC X arm fixing along with strainplates and no. dics insulators completePer set38722774774154813Fixing of lightening arrestorsSet of 3 No.1071110710721414Fixing of D.O. Set including channelSet of 3 No.1071110710721415Fixing of x mer mounting stracture complete with supporting clamp and trun bucklePer set3121131231262416Earthing of sub station00000(a) Diggingfor eath pitPer pit00000(i) NormalPer pit13800000(ii) Hard SoilPer pit34333102910292058(b) Laying of earth pipe connection of earth wire from supportsper pole3533105105210 Labor charge for back filling by salt charcoal and excabated earthPer set3533105105210(e) Cost of 10 kg saltPer set4433132132264(f) cost of 5 kg charcoalPer set1073332132164217(a) Concreting for transformer DP @ 0.5 cmt/ polePer Pole196922393839387876(b) Labor charge for concretingPer pit1722234434468818Survey for 11 KV/ Lt linePer Km9320000019Base padding of pole 0.05 cmtPer Loc1970000020Labor chage for base paddingPer Loc160000021Handling and installation of dist X mer00000025kvaNo.4781147847895622Handing and installation of distt. Baxes000000(a) 25 kvaNo.24211242242484Total00000019033.6130645.249678.81RUPEES FOURTY NINE THOUSAND SIX HUNDRED SEVENTY NINE ONLYEach construction activity shall be performed in Norten and as specification laid in enclosed annexurs and layout all other terms and conditions by which is this contact be government has been indicated in annexure II specimen copies of agreement frorm is also enclosed here with which shall be executed on non judicial stamp paper of Rs. Hundred i.e. submitted to this office through A.E. STC sagar concern duly signed by you and your withess before commencement of work in respect of awards billing more than 5000/- balance security deposit of 2.5% of the value of award shall be deduced from contractor in first bill this shall be encovered by AE STC SAgarThe rates fixed as per CMD/ EZ jablapur vide CMD/EZ/WS 6507 dated 24/7/2012 As above 4 No.No./ EE/ STC BillCopy1The senior Accounts Officer M.P.K.V.V. Co. Ltd. Sagar2The assistant Engineer STC, M.P.P.K.V.V. Co. Ltd3Bill Section (Work section) STC Dn. Sagar98

JE ( STC) M.P.P.K.V.V.Co.Ltd. SagarAE ( STC)M.P.P.K.V.V.Co.Ltd. SagarEE ( STC)M.P.P.K.V.V.Co.Ltd. SagarEE ( STC)M.P.P.K.V.V.Co.Ltd. SagarJE ( STC) M.P.P.K.V.V.Co.Ltd. SagarAE ( STC)M.P.P.K.V.V.Co.Ltd. SagarEE ( STC)M.P.P.K.V.V.Co.Ltd. SagarEE ( STC)M.P.P.K.V.V.Co.Ltd. Sagar

Sheet2

Sheet3