Flower Market Restoration Project :Estimation and Costing-Illuminance
Unità Loca le -room Superficie
pavim ento - floor
a rea
1/8 superficie n°serr S serram ento H inte rna
la rghezza lunghezza la rghezza lunghezza
01 S/K 35.3 4.41 1 1.80 2.40 4.32 2.70
1 0.90 2.40 2.16 2.70
1 3.45 2.40 8.28 2.70
L1 5.0 2.8 14.1 1.76 1 0.90 2.40 2.16 2.70
L2 4.1 3.2 13.0 1.62 1 1.80 2.40 4.32 2.70
1 0.90 2.40 2.16 2.70
B1 3.6 1.5 5.3 0.67 1 0.90 2.40 2.16 2.70
B2 2.3 1.4 3.6 0.45 1 0.90 2.40 2.16 2.70
02 S 3.9 3.9 14.8 1.85 1 2.75 2.40 6.60 2.70
L1 3.9 3.8 14.5 1.81 1 0.90 2.40 2.16 2.70
K 2.6 2.0 4.5 0.56 1 0.90 2.40 2.16 2.70
B2 2.2 1.9 4.2 0.52 1 0.90 2.40 2.16 2.70
03 S 7.1 3.0 21.3 2.66 1 0.90 2.40 2.16 2.70
K 3.7 3.0 11.1 1.39 1 1.80 2.40 4.32 2.70
L1 3.3 2.7 9.0 1.13 1 0.90 2.40 2.16 2.70
L2 5.2 2.7 14.1 1.76 1 0.90 2.40 2.16 2.70
B 2.2 1.7 3.7 0.47 0 0.00 2.70
04 S 5.8 3.9 22.6 2.83 1 3.00 2.40 7.20 2.70
K 4.1 1.8 7.1 0.89 0 0.00 2.70
L1 3.3 2.8 9.0 1.13 1 0.90 2.40 2.16 2.70
L2 5.0 2.8 14.0 1.75 1 0.90 2.40 2.16 2.70
B 3.3 1.7 5.4 0.67 0 0.00 2.70
05 S 3.9 3.7 14.3 1.79 1 2.70 2.40 6.48 2.70
K 2.3 2.0 4.5 0.56 1 0.90 2.40 2.16 2.70
L1 3.9 3.6 14.0 1.75 1 0.90 2.40 2.16 2.70
B 2.2 2.1 4.5 0.56 1 0.90 2.40 2.16 2.70
06 S 7.1 3.0 21.3 2.66 1 1.80 2.40 4.32 2.70
K 3.7 3.0 11.1 1.39 1 0.90 2.40 2.16 2.70
L1 3.3 2.7 9.0 1.13 1 0.90 2.40 2.16 2.70
L2 5.2 2.7 14.1 1.76 1 0.90 2.40 2.16 2.70
B 2.2 1.7 3.7 0.47 0 0.00 2.70
07 S/K/L 4.9 4.2 20.5 2.56 1 2.70 2.40 6.48 2.70
B 3.3 1.5 4.9 0.61 1 0.90 2.40 2.16 2.70
08 S 7.1 3.0 21.3 2.66 1 1.80 2.40 4.32 2.70
dim ensioni loca le dim serram ento
![Page 2: Avventura urbanna4](https://reader038.fdocuments.us/reader038/viewer/2022100602/5585192cd8b42ada748b4593/html5/thumbnails/2.jpg)
Flower Market Restoration Project :Estimation and Costing-Facade Treatement
PlasterFront facade from 2nd to 4th floor plaster:
total are a of the façade no.of windows of are a 2.16m2 Total othe r windows of are a
1302.99 77 166.32 326.57
Back facade from 1st to 4th floor plaster:
total are a of the façade no.of windows of are a 2.16m2 Total othe r windows of are a
1655.93 115.00 248.40 147.81
prospetto nord-ovest 2nd to 4th plaster
total are a of the façade no.of windows of are a 2.16m2 Total othe r windows of are a
122.55 6 12.96 32.00
prospetto sud-est 2nd to 4th plaster
total are a of the façade no.of windows of are a 2.16m2 Total othe r windows of are a
122.55 6 12.96 32.00
W OODFront facade 1st floor wood:
total are a of the façade no.of windows of are a 2.16m2 Total othe r windows of are a
339.28 20 43.20 72.61
prospetto nord-ovest wood
total are a of the façade no.of windows of are a 2.16m2 Total othe r windows of are a
35.70 2 4.32 9.36
prospetto sud-est wood
total are a of the façade no.of windows of are a 2.16m2 Total othe r windows of are a
35.70 2 4.32 9.36