UMTATA CENTRAL PRISON PONDS & PUBLIC WORKS - CASE STUDY.
By using Avantu Bioaugmentation Public Works reduced their sewerage maintenance costs by 60% (refer letter)
A. Dosing started March 2003
D. July/August 2003
The bioaugmentation section of the 2005 Public Works SAPS tender was based on Avantu products
Public Works’ Water Management & Chemical Laboratories have recommended Pitking and Fatking for sewerage rectification, September 2004
NKANDLA PUMP STATIONS
Faecal Coliform Analysis Results
Pump Station 111/01/06 1 720 000/100ml (cfu)
18/01/06 86 000/100ml (cfu) 95% reduction in 1 week
31/01/06 3 000/100ml (cfu) further 96.5% reduction on 18/01/06Pump Station 211/01/06 90 500/100ml (cfu)
18/01/06 5 000/100ml (cfu) 94,4% reduction in 1 week
31/01/06 3 000/100ml (cfu) further 78% reduction on 18/01/06Pump Station 311/01/06 91 000/100ml (cfu)
18/01/06 197/100ml (cfu) 99.7% reduction in 1 week31/01/06 53 000/100ml (cfu) increase due to more repairs being done on the pump resulting in another sewerage spill occurring and Avantu started the bioaugmentation rectification process on the 13/02/06
Dubai Muncipality must make a sustainable difference for our preservation of water by:
Creating a healthier environment!!
Rectifying sewerage problemsTaking a responsible attitude to sanitationRestoring dignity for the communityPrevent spreading of waterborne diseases Reducing health risks & saving lives