Availability Analysis

5
Total time per day 24 hours x Total number of days per year 365 days = Total time per year 8760 hours 28 days 7.67 % Number of shifts per day 2 Length of shifts 7.5 hours 34.62 % 45 min 2.89 % Time not available per year 3957.8 hours 45.18 % 4802 hours 54.82 % 14.25 hours 855.0 min Number of days closed per year (holidays, weekends, Planned downtime per day (downtime accounted for in the production schedule, e.g. shop floor meetings, breaks, scheduled maintenance, etc.) Time available per year Time available per workday Next Loss (as a percentage of the total time in a 365 day-year) Remaining availability

description

Machine Effectiveness

Transcript of Availability Analysis

Page 1: Availability Analysis

Total time per day 24 hoursx

Total number of days per year 365 days=

Total time per year 8760 hours

28 days 7.67 %

Number of shifts per day 2

Length of shifts 7.5 hours 34.62 %

45 min 2.89 %

Time not available per year 3957.75 hours 45.18 %

4802 hours 54.82 %

14.25 hours

855.0 min

Number of days closed per year (holidays, weekends, etc.)

Planned downtime per day (downtime accounted for in the production schedule, e.g. shop floor meetings, breaks, scheduled maintenance, etc.)

Time available per year

Time available per workday

NextNext

Loss(as a percentage of the total time in a 365 day-

year)

Loss(as a percentage of the total time in a 365 day-

year)

Remaining availability

Remaining availability

Page 2: Availability Analysis

Machine ID AB12

Natural process time

23 min/product

Downtime

MTTF 6000 min4.76 %

MTTR 300 min

Minor stoppages

7 times

4.91 %

6 minHow long does an average stop take?

Rework

0.5 products1.46 %

25 min

Prototyping

2 min 0.23 %

Worker/machine interaction

23 min 2.69 %

Material/machine interaction

20 min 2.34 %

Setup

What lotsize is used for this product? 0 products

0 setups

0.00 %

What is the setup time? 0 min

0 min

Do you want to include setup time?

Now we need some details about the production parameters. If we ask for the time per day we mean a workday with the available time as calculated in the previous sheet.

What is the natural process time of the product on this machine?

What are the MTTF and MTTR of this machine? Only count the time lost during workdays.

How many times per day is the production stopped for small problems. E.g. due to a blocked machine, a safety stop, a defective product that has to be removed etc.

How many products have to be reworked per day due to quality problems?

How much time does it take to rework one product?

How much time is lost per day on the production of prototypes and test products?

How much time is lost per day because no operator is available?

How much time is lost per day because of material shortages?

How many setups per day are there on this machine?

How much time is lost after a setup before the first good product is produced?

ResultsResults

Loss(as a percentage of the total time in a

workday)

Loss(as a percentage of the total time in a

workday)

Yes

No

Page 3: Availability Analysis

Results

23.00 min

Per type of outage Cumulative

100 % Per type of outage Cumulativedowntime 4.76 % 95.24 % 1.31 min 24.31 minminor stoppages 4.91 % 90.33 % 1.35 min 25.66 minrework 1.46 % 88.86 % 0.40 min 26.06 minprototyping 0.23 % 88.63 % 0.06 min 26.13 minworker/machine int. 2.69 % 85.94 % 0.74 min 26.87 minmaterial/machine int. 2.34 % 83.60 % 0.64 min 27.51 minsetup 0.00 % 83.60 % 0.00 min 27.51 min

16.40 %

27.51 min

83.60 %

54.82 %

45.83 % 50.19 min

525600 min

240883 min

natural process time

effective process time 1

Availability per workday

Time available per year

Availability on a yearly basis

effective process time 2

total time per year (365x24x60)

effective time used per year

GraphGraph

Page 4: Availability Analysis

natural process time

downtime

minor stoppages

rework

prototyping

worker/machine int.

material/machine int.

setup

effective process time 1

effective process time 2

0.00 10.00 20.00 30.00 40.00 50.00 60.00

Effective process time of machine

Process times Lossesminutes

AB12